Points
Observation Recommendation Action By
1 Earthing
2 Neutral earthing:
3 RCCB
4 Insulation
5 Cable Layout ASP
6 Protection from water
7 Lightning Arrester
8 ANTONY
9 Installation Cover & Seals
10 Electrical fire hazards
SI
NO.
ramesh
naidu's
welding
machine
found with out
earthing at
cooler house
Earthing should be
provided.
electrician of the cooler
house
at the weigh
bridge cables
are routed on
surface of
theground.
cables are routed
above the ground level.
Plug Tops & Cable Joints
at the raw mill
silo welding
machine cable
having
multiple joints
cable is replaced by
new one
11 Safety gaurds. TVL/MNK
12
Date:02/09/2010
grinding
machine found
with out safety
guard.at
fabrication
yard
safety guard should be
provided.
Others (Specify)
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing earthing is provided SRINIVAS
2 Neutral earthing:
3 RCCB
4 Insulation
5 Cable Layout SUDHAKAR
6 Protection from water
7 Lightning Arrester
8 PRATAP
9
Installation Cover & Seals
PRATAP
10 Electrical fire hazards
11 Safety gaurds.
12
SI
NO.
cutting
machines
using with out
earthing at pre
heater
at the steel
yard rods are
placing on the
cable
cables are covered by
ledgar pipe.
Plug Tops & Cable Joints
switch board
having no
water
protection
proper covering is
provided
water pump
having no
proper
protection
proper covering is
provided
Others (Specify)
Date:09/09/2010
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing TVL/MNK
2 Neutral earthing:
3
RCCB
TVL/MNK
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 ASP
SI
NO.
P&M welding
machine
found with out
earthing
Earthing should be
provided.
halogen lamps
are having
loose
connections
cables are properly
arranged
In kiln pier-3
cables are
routed through
ground.
cables are routed
above the ground level.
Plug Tops & Cable Joints
at the weigh
bridge cable is
having multiple
joints
cable is replaced by
new one
9
Installation Cover & Seals
TVL/MNK
10 Electrical fire hazards
11 Safety gaurds.
12
Date:16/09/2010
welding
machine is not
having proper
connection
proper connection is
provided
Others (Specify)
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing SRINIVAS
2 Neutral earthing:
3
RCCB
proper action is taken PRATAP
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 replaced by new one PRATAP
9 Installation Cover & Seals
SI
NO.
pabala
welding
machine
found with out
earthing at pre
heater
Earthing should be
provided.
halogen lamps
are having
loose
connections at
cooler house
In pre heater
cables are
found routed
above the
ground level.
cables are covered with
ledgar pipes
Plug Tops & Cable Joints
at the cooler
house cable is
having multiple
joints
10 Electrical fire hazards
11 Safety gaurds.
12
Date:23/09/2010
Others (Specify)
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing TVL/MNK
2 Neutral earthing:
3
RCCB
connection is provided CHANDRA SEKHAR
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 Plug top to be provided. TEJA
SI
NO.
welding
machine
found with out
earthing at the
batching plant
Earthing should be
provided.
halogen lamps
are not having
proper
connections at
the quality
center
cables are
routed on
ground at pre
heater at
blending silo
cables are routed
above the ground level.
Plug Tops & Cable Joints
S/c. pabla
drilling
machine found
with out plug
top.
9 Installation Cover & Seals
10 Electrical fire hazards
11 Safety gaurds. SUDHAKAR
12
Date:10/11/08
cutting
machine found
with out safety
guard steel
yard
safety guard should be
provided.
Others (Specify)
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI NO.
Points
Observation Action By
1 Earthing SHIVA
2 Neutral earthing:
3
RCCB
CHANDRA SEKHAR
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 TEJA
9 Installation Cover & Seals
10 Electrical fire hazards
Recommendatio
n
earthing cable
is not properly
attached to the
welding
machine at pre
heater
Earthing cable is
properly attached
halogen lamps
are not having
proper
connections at
the quality
center
connection is
provided
cables are
routed on
ground at pre
heater at
blending silo
cables are routed
above the ground
level.
Plug Tops & Cable Joints
S/c. pabla
drilling
machine found
with out plug
top.
Plug top to be
provided.
11 Safety gaurds. SUDHAKAR
12
Date:10/11/08
cutting
machine found
with out safety
guard steel
yard
safety guard
should be
provided.
Others (Specify)
ISION
COMPANY
Ref; IM-09-C REV00
PORT
Target Remarks
w.i.e
w.i.e
w.i.e
w.i.e
w.i.e
Signed BY
HSEO

More Related Content

44466636 electrical-inspection-1

  • 1. LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY Ref; IM-09-C REV00 ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing 2 Neutral earthing: 3 RCCB 4 Insulation 5 Cable Layout ASP 6 Protection from water 7 Lightning Arrester 8 ANTONY 9 Installation Cover & Seals 10 Electrical fire hazards SI NO. ramesh naidu's welding machine found with out earthing at cooler house Earthing should be provided. electrician of the cooler house at the weigh bridge cables are routed on surface of theground. cables are routed above the ground level. Plug Tops & Cable Joints at the raw mill silo welding machine cable having multiple joints cable is replaced by new one
  • 2. 11 Safety gaurds. TVL/MNK 12 Date:02/09/2010 grinding machine found with out safety guard.at fabrication yard safety guard should be provided. Others (Specify)
  • 3. C DIVISION ING COMPANY Ref; IM-09-C REV00 N REPORT Target Remarks w.i.e w.i.e w.i.e
  • 5. LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY Ref; IM-09-C REV00 ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing earthing is provided SRINIVAS 2 Neutral earthing: 3 RCCB 4 Insulation 5 Cable Layout SUDHAKAR 6 Protection from water 7 Lightning Arrester 8 PRATAP 9 Installation Cover & Seals PRATAP 10 Electrical fire hazards 11 Safety gaurds. 12 SI NO. cutting machines using with out earthing at pre heater at the steel yard rods are placing on the cable cables are covered by ledgar pipe. Plug Tops & Cable Joints switch board having no water protection proper covering is provided water pump having no proper protection proper covering is provided Others (Specify)
  • 7. C DIVISION ING COMPANY Ref; IM-09-C REV00 N REPORT Target Remarks w.i.e w.i.e w.i.e w.i.e
  • 9. LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY Ref; IM-09-C REV00 ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing TVL/MNK 2 Neutral earthing: 3 RCCB TVL/MNK 4 Insulation 5 Cable Layout SRINIVAS 6 Protection from water 7 Lightning Arrester 8 ASP SI NO. P&M welding machine found with out earthing Earthing should be provided. halogen lamps are having loose connections cables are properly arranged In kiln pier-3 cables are routed through ground. cables are routed above the ground level. Plug Tops & Cable Joints at the weigh bridge cable is having multiple joints cable is replaced by new one
  • 10. 9 Installation Cover & Seals TVL/MNK 10 Electrical fire hazards 11 Safety gaurds. 12 Date:16/09/2010 welding machine is not having proper connection proper connection is provided Others (Specify)
  • 11. C DIVISION ING COMPANY Ref; IM-09-C REV00 N REPORT Target Remarks w.i.e w.i.e w.i.e w.i.e
  • 13. LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY Ref; IM-09-C REV00 ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing SRINIVAS 2 Neutral earthing: 3 RCCB proper action is taken PRATAP 4 Insulation 5 Cable Layout SRINIVAS 6 Protection from water 7 Lightning Arrester 8 replaced by new one PRATAP 9 Installation Cover & Seals SI NO. pabala welding machine found with out earthing at pre heater Earthing should be provided. halogen lamps are having loose connections at cooler house In pre heater cables are found routed above the ground level. cables are covered with ledgar pipes Plug Tops & Cable Joints at the cooler house cable is having multiple joints
  • 14. 10 Electrical fire hazards 11 Safety gaurds. 12 Date:23/09/2010 Others (Specify)
  • 15. C DIVISION ING COMPANY Ref; IM-09-C REV00 N REPORT Target Remarks w.i.e w.i.e w.i.e w.i.e
  • 17. LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY Ref; IM-09-C REV00 ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing TVL/MNK 2 Neutral earthing: 3 RCCB connection is provided CHANDRA SEKHAR 4 Insulation 5 Cable Layout SRINIVAS 6 Protection from water 7 Lightning Arrester 8 Plug top to be provided. TEJA SI NO. welding machine found with out earthing at the batching plant Earthing should be provided. halogen lamps are not having proper connections at the quality center cables are routed on ground at pre heater at blending silo cables are routed above the ground level. Plug Tops & Cable Joints S/c. pabla drilling machine found with out plug top.
  • 18. 9 Installation Cover & Seals 10 Electrical fire hazards 11 Safety gaurds. SUDHAKAR 12 Date:10/11/08 cutting machine found with out safety guard steel yard safety guard should be provided. Others (Specify)
  • 19. C DIVISION ING COMPANY Ref; IM-09-C REV00 N REPORT Target Remarks w.i.e w.i.e w.i.e w.i.e
  • 21. LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY Ref; IM-09 ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO SI NO. Points Observation Action By 1 Earthing SHIVA 2 Neutral earthing: 3 RCCB CHANDRA SEKHAR 4 Insulation 5 Cable Layout SRINIVAS 6 Protection from water 7 Lightning Arrester 8 TEJA 9 Installation Cover & Seals 10 Electrical fire hazards Recommendatio n earthing cable is not properly attached to the welding machine at pre heater Earthing cable is properly attached halogen lamps are not having proper connections at the quality center connection is provided cables are routed on ground at pre heater at blending silo cables are routed above the ground level. Plug Tops & Cable Joints S/c. pabla drilling machine found with out plug top. Plug top to be provided.
  • 22. 11 Safety gaurds. SUDHAKAR 12 Date:10/11/08 cutting machine found with out safety guard steel yard safety guard should be provided. Others (Specify)
  • 23. ISION COMPANY Ref; IM-09-C REV00 PORT Target Remarks w.i.e w.i.e w.i.e w.i.e