The electrical safety inspection report summarizes observations and recommendations from an inspection of the HCIL Narsighar site. Issues were found with earthing, cable routing, loose connections, missing plug tops and safety guards. Recommendations included providing earthing, routing cables above ground, fixing connections, and installing missing safety equipment. Action was assigned to electricians and other staff to address each issue.
1 of 24
Downloaded 10 times
More Related Content
44466636 electrical-inspection-1
1. LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing
2 Neutral earthing:
3 RCCB
4 Insulation
5 Cable Layout ASP
6 Protection from water
7 Lightning Arrester
8 ANTONY
9 Installation Cover & Seals
10 Electrical fire hazards
SI
NO.
ramesh
naidu's
welding
machine
found with out
earthing at
cooler house
Earthing should be
provided.
electrician of the cooler
house
at the weigh
bridge cables
are routed on
surface of
theground.
cables are routed
above the ground level.
Plug Tops & Cable Joints
at the raw mill
silo welding
machine cable
having
multiple joints
cable is replaced by
new one
2. 11 Safety gaurds. TVL/MNK
12
Date:02/09/2010
grinding
machine found
with out safety
guard.at
fabrication
yard
safety guard should be
provided.
Others (Specify)
5. LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing earthing is provided SRINIVAS
2 Neutral earthing:
3 RCCB
4 Insulation
5 Cable Layout SUDHAKAR
6 Protection from water
7 Lightning Arrester
8 PRATAP
9
Installation Cover & Seals
PRATAP
10 Electrical fire hazards
11 Safety gaurds.
12
SI
NO.
cutting
machines
using with out
earthing at pre
heater
at the steel
yard rods are
placing on the
cable
cables are covered by
ledgar pipe.
Plug Tops & Cable Joints
switch board
having no
water
protection
proper covering is
provided
water pump
having no
proper
protection
proper covering is
provided
Others (Specify)
9. LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing TVL/MNK
2 Neutral earthing:
3
RCCB
TVL/MNK
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 ASP
SI
NO.
P&M welding
machine
found with out
earthing
Earthing should be
provided.
halogen lamps
are having
loose
connections
cables are properly
arranged
In kiln pier-3
cables are
routed through
ground.
cables are routed
above the ground level.
Plug Tops & Cable Joints
at the weigh
bridge cable is
having multiple
joints
cable is replaced by
new one
10. 9
Installation Cover & Seals
TVL/MNK
10 Electrical fire hazards
11 Safety gaurds.
12
Date:16/09/2010
welding
machine is not
having proper
connection
proper connection is
provided
Others (Specify)
13. LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing SRINIVAS
2 Neutral earthing:
3
RCCB
proper action is taken PRATAP
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 replaced by new one PRATAP
9 Installation Cover & Seals
SI
NO.
pabala
welding
machine
found with out
earthing at pre
heater
Earthing should be
provided.
halogen lamps
are having
loose
connections at
cooler house
In pre heater
cables are
found routed
above the
ground level.
cables are covered with
ledgar pipes
Plug Tops & Cable Joints
at the cooler
house cable is
having multiple
joints
17. LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Points
Observation Recommendation Action By
1 Earthing TVL/MNK
2 Neutral earthing:
3
RCCB
connection is provided CHANDRA SEKHAR
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 Plug top to be provided. TEJA
SI
NO.
welding
machine
found with out
earthing at the
batching plant
Earthing should be
provided.
halogen lamps
are not having
proper
connections at
the quality
center
cables are
routed on
ground at pre
heater at
blending silo
cables are routed
above the ground level.
Plug Tops & Cable Joints
S/c. pabla
drilling
machine found
with out plug
top.
18. 9 Installation Cover & Seals
10 Electrical fire hazards
11 Safety gaurds. SUDHAKAR
12
Date:10/11/08
cutting
machine found
with out safety
guard steel
yard
safety guard should be
provided.
Others (Specify)
21. LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI NO.
Points
Observation Action By
1 Earthing SHIVA
2 Neutral earthing:
3
RCCB
CHANDRA SEKHAR
4 Insulation
5 Cable Layout SRINIVAS
6 Protection from water
7 Lightning Arrester
8 TEJA
9 Installation Cover & Seals
10 Electrical fire hazards
Recommendatio
n
earthing cable
is not properly
attached to the
welding
machine at pre
heater
Earthing cable is
properly attached
halogen lamps
are not having
proper
connections at
the quality
center
connection is
provided
cables are
routed on
ground at pre
heater at
blending silo
cables are routed
above the ground
level.
Plug Tops & Cable Joints
S/c. pabla
drilling
machine found
with out plug
top.
Plug top to be
provided.
22. 11 Safety gaurds. SUDHAKAR
12
Date:10/11/08
cutting
machine found
with out safety
guard steel
yard
safety guard
should be
provided.
Others (Specify)