The following presentation outlines a blueprint to build a data-driven pavement management program through leveraging industry standards and recognized affiliations for your local public agency.
1 of 16
Download to read offline
More Related Content
A Blueprint to Building a Pavement Management Program
1. PAVEMENT MANAGEMENT GROUP
A Data Driven Approach to Better Roadways!
James Golden III | CEO | (740) 507-3842 | James@PavementManagementGroup.com
2. THE PROBLEM
• Years of Underinvestment
• Millions in Backlog
• No Preventive Strategy
• No Preservation Strategy
• Poor Road Conditions
• Short Lifespans
• Unhappy Drivers!
4. 1
THE PROCESS
• Industry Standard Software
• Network Definition
• 1080P HD Video
• Condition Assessment
• GIS Integration
• Budget Needs/Scenarios
• Reporting
• Managed Services
5. 1
PAVER®
• US Army Corps of Engineers
• APWA Recommended
• Industry Standard
• Cost Effective
• Specific Set of Tools
• A Complete System
6. 1
INVENTORY
• Accurate Network Inventory
• Branches and Sections
• Sections Block by Block
• Section Attributes Tagged
• Length:Width:Area Measured
• Work History Recorded
7. 1
VIDEO
• 1080P HD 60 Frames/Second
• 100% Video of the Network
• Videos at the Section Level
• Online Dedicated Access
• External Storage Access
• Google Earth Access
10. 1
CONCRETE DISTRESSES
Blow Up
Corner Break
Divided Slab
Durability Cracking
Faulting
Joint Seal Damage
Lane/Shoulder Drop
Linear Cracking
Small Patching
Large Patching
Polished Aggregate
Popouts
Pumping
Punchout
Scaling
Railroad Crossing
Shrink Cracking
Corner Spalling
Joint Spalling
11. 1
GIS, GOOGLE EARTH
• GIS Assignment
• Pavement Mgmt. Layers
• Latest Condition Map
• Published GIS Map
• Google Earth Condition
• Streaming Video Access
12. 1
BUDGET NEEDS,
SCENARIOS, PLAN
• Maintenance Needs
• Develop Policies
• Budget Analysis Results
• Plan Projects
TREATMENT PCI CONDITION
Rejuvenator 95-100 Excellent
Crack Seal 75-85 Very Good
20 lbs/sq. Single Microsurfacing 65-75 Good
Cape Seal (3/8" Chip Seal, and 25 lb. Slurry 55-65 Fair
2" Mill and Hot Mix Overlay 40-55 Poor
Cold In-Place Recycling with 2" Hot Mix Asphalt 30-55 Very Poor
Full Depth Stabilized Reclamation with 4“ Asphalt 0-30 Failed
68.33
66.68
64.68
63.68
70.71 70.70 70.68 70.20
72.21 72.20 72.18 72.08
73.87
74.68 75.24 75.53
55.00
60.00
65.00
70.00
75.00
80.00
2019 2020 2021 2022 2023
5 YEAR PLAN
NETWORK AVERAGE PROJECTED CONDITIONS
VARIOUS FUNDING SCENARIOS
$1.30 Million $1.80 Million $2.00 Million $2.50 Million
13. 1
DELIVERABLES
• Final Project Report
• Inventory Condition Report
• GIS Condition Map
• Google Earth Project File
• 1080P HD Videos
• Streaming Video Access
• Onsite Project Review
• PAVER Software
14. CONTINUED SUPPORT
• Consulting & Support
• Recommendations
• Inventory/Work Updates
• PAVER Training
• Budget/Target Scenarios
• Project Planning
• Extension of the Team!
+
15. 1
BENEFITS
• Data Driven
• Measured Results
• Condition Analysis
• Qualify Treatments
• Maximize Budgets
• Optimize Conditions
• Create Long Term Plans
16. James Golden III | CEO | (740) 507-3842 | James@PavementManagementGroup.com