PAVEMENT MANAGEMENT GROUP
A Data Driven Approach to Better Roadways!
James Golden III | CEO | (740) 507-3842 | James@PavementManagementGroup.com
THE PROBLEM
• Years of Underinvestment
• Millions in Backlog
• No Preventive Strategy
• No Preservation Strategy
• Poor Road Conditions
• Short Lifespans
• Unhappy Drivers!
1
THE SOLUTION
• Leadership
• Prioritization
• Planning
• Documentation
• Measurement
• Accountability
1
THE PROCESS
• Industry Standard Software
• Network Definition
• 1080P HD Video
• Condition Assessment
• GIS Integration
• Budget Needs/Scenarios
• Reporting
• Managed Services
1
PAVER®
• US Army Corps of Engineers
• APWA Recommended
• Industry Standard
• Cost Effective
• Specific Set of Tools
• A Complete System
1
INVENTORY
• Accurate Network Inventory
• Branches and Sections
• Sections Block by Block
• Section Attributes Tagged
• Length:Width:Area Measured
• Work History Recorded
1
VIDEO
• 1080P HD 60 Frames/Second
• 100% Video of the Network
• Videos at the Section Level
• Online Dedicated Access
• External Storage Access
• Google Earth Access
1
INSPECTION
• Pavement Condition Index
• ASTM D6433 Standard
• Representative Sampling
• 20 Asphalt Distresses
• 19 Concrete Distresses
• Distress Type: Severity: Qty
• Value: 0 - 100
• Condition Categories
1
ASPHALT DISTRESSES
Alligator Cracking
Bleeding
Block Cracking
Bumps/Sags
Corrugation
Depression
Edge Cracking
Reflective Cracking
Lane/Shoulder Drop
Long./Trans. Cracking
Patching
Polished Aggregate
Potholes
Railroad Crossing
Rutting
Shoving
Slippage Cracking
Swell
Raveling
Weathering
1
CONCRETE DISTRESSES
Blow Up
Corner Break
Divided Slab
Durability Cracking
Faulting
Joint Seal Damage
Lane/Shoulder Drop
Linear Cracking
Small Patching
Large Patching
Polished Aggregate
Popouts
Pumping
Punchout
Scaling
Railroad Crossing
Shrink Cracking
Corner Spalling
Joint Spalling
1
GIS, GOOGLE EARTH
• GIS Assignment
• Pavement Mgmt. Layers
• Latest Condition Map
• Published GIS Map
• Google Earth Condition
• Streaming Video Access
1
BUDGET NEEDS,
SCENARIOS, PLAN
• Maintenance Needs
• Develop Policies
• Budget Analysis Results
• Plan Projects
TREATMENT PCI CONDITION
Rejuvenator 95-100 Excellent
Crack Seal 75-85 Very Good
20 lbs/sq. Single Microsurfacing 65-75 Good
Cape Seal (3/8" Chip Seal, and 25 lb. Slurry 55-65 Fair
2" Mill and Hot Mix Overlay 40-55 Poor
Cold In-Place Recycling with 2" Hot Mix Asphalt 30-55 Very Poor
Full Depth Stabilized Reclamation with 4“ Asphalt 0-30 Failed
68.33
66.68
64.68
63.68
70.71 70.70 70.68 70.20
72.21 72.20 72.18 72.08
73.87
74.68 75.24 75.53
55.00
60.00
65.00
70.00
75.00
80.00
2019 2020 2021 2022 2023
5 YEAR PLAN
NETWORK AVERAGE PROJECTED CONDITIONS
VARIOUS FUNDING SCENARIOS
$1.30 Million $1.80 Million $2.00 Million $2.50 Million
1
DELIVERABLES
• Final Project Report
• Inventory Condition Report
• GIS Condition Map
• Google Earth Project File
• 1080P HD Videos
• Streaming Video Access
• Onsite Project Review
• PAVER Software
CONTINUED SUPPORT
• Consulting & Support
• Recommendations
• Inventory/Work Updates
• PAVER Training
• Budget/Target Scenarios
• Project Planning
• Extension of the Team!
+
1
BENEFITS
• Data Driven
• Measured Results
• Condition Analysis
• Qualify Treatments
• Maximize Budgets
• Optimize Conditions
• Create Long Term Plans
James Golden III | CEO | (740) 507-3842 | James@PavementManagementGroup.com

More Related Content

A Blueprint to Building a Pavement Management Program

  • 1. PAVEMENT MANAGEMENT GROUP A Data Driven Approach to Better Roadways! James Golden III | CEO | (740) 507-3842 | James@PavementManagementGroup.com
  • 2. THE PROBLEM • Years of Underinvestment • Millions in Backlog • No Preventive Strategy • No Preservation Strategy • Poor Road Conditions • Short Lifespans • Unhappy Drivers!
  • 3. 1 THE SOLUTION • Leadership • Prioritization • Planning • Documentation • Measurement • Accountability
  • 4. 1 THE PROCESS • Industry Standard Software • Network Definition • 1080P HD Video • Condition Assessment • GIS Integration • Budget Needs/Scenarios • Reporting • Managed Services
  • 5. 1 PAVER® • US Army Corps of Engineers • APWA Recommended • Industry Standard • Cost Effective • Specific Set of Tools • A Complete System
  • 6. 1 INVENTORY • Accurate Network Inventory • Branches and Sections • Sections Block by Block • Section Attributes Tagged • Length:Width:Area Measured • Work History Recorded
  • 7. 1 VIDEO • 1080P HD 60 Frames/Second • 100% Video of the Network • Videos at the Section Level • Online Dedicated Access • External Storage Access • Google Earth Access
  • 8. 1 INSPECTION • Pavement Condition Index • ASTM D6433 Standard • Representative Sampling • 20 Asphalt Distresses • 19 Concrete Distresses • Distress Type: Severity: Qty • Value: 0 - 100 • Condition Categories
  • 9. 1 ASPHALT DISTRESSES Alligator Cracking Bleeding Block Cracking Bumps/Sags Corrugation Depression Edge Cracking Reflective Cracking Lane/Shoulder Drop Long./Trans. Cracking Patching Polished Aggregate Potholes Railroad Crossing Rutting Shoving Slippage Cracking Swell Raveling Weathering
  • 10. 1 CONCRETE DISTRESSES Blow Up Corner Break Divided Slab Durability Cracking Faulting Joint Seal Damage Lane/Shoulder Drop Linear Cracking Small Patching Large Patching Polished Aggregate Popouts Pumping Punchout Scaling Railroad Crossing Shrink Cracking Corner Spalling Joint Spalling
  • 11. 1 GIS, GOOGLE EARTH • GIS Assignment • Pavement Mgmt. Layers • Latest Condition Map • Published GIS Map • Google Earth Condition • Streaming Video Access
  • 12. 1 BUDGET NEEDS, SCENARIOS, PLAN • Maintenance Needs • Develop Policies • Budget Analysis Results • Plan Projects TREATMENT PCI CONDITION Rejuvenator 95-100 Excellent Crack Seal 75-85 Very Good 20 lbs/sq. Single Microsurfacing 65-75 Good Cape Seal (3/8" Chip Seal, and 25 lb. Slurry 55-65 Fair 2" Mill and Hot Mix Overlay 40-55 Poor Cold In-Place Recycling with 2" Hot Mix Asphalt 30-55 Very Poor Full Depth Stabilized Reclamation with 4“ Asphalt 0-30 Failed 68.33 66.68 64.68 63.68 70.71 70.70 70.68 70.20 72.21 72.20 72.18 72.08 73.87 74.68 75.24 75.53 55.00 60.00 65.00 70.00 75.00 80.00 2019 2020 2021 2022 2023 5 YEAR PLAN NETWORK AVERAGE PROJECTED CONDITIONS VARIOUS FUNDING SCENARIOS $1.30 Million $1.80 Million $2.00 Million $2.50 Million
  • 13. 1 DELIVERABLES • Final Project Report • Inventory Condition Report • GIS Condition Map • Google Earth Project File • 1080P HD Videos • Streaming Video Access • Onsite Project Review • PAVER Software
  • 14. CONTINUED SUPPORT • Consulting & Support • Recommendations • Inventory/Work Updates • PAVER Training • Budget/Target Scenarios • Project Planning • Extension of the Team! +
  • 15. 1 BENEFITS • Data Driven • Measured Results • Condition Analysis • Qualify Treatments • Maximize Budgets • Optimize Conditions • Create Long Term Plans
  • 16. James Golden III | CEO | (740) 507-3842 | James@PavementManagementGroup.com