ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
ABNORMALITY REPORT -2023
Page 1 of 7
CPSU/Elect./M-103/10/2023
Date: 23.06.2023
Sub: Abnormality report for TG-1 tripped on Under frequency and GT unloaded
to FSNL (Reverse power relay operated) on 15.06.2023.
Date& Time of Event: On 15/06/23 at 17:04:08 hrs.
Effect on Plant: Maximum demand reached to 47.092 MVA (Contract demand
30.0 MVA).
Description of events:
 Before event, TG-1 was running @ at 11.0 MW (APR mode), GT was running
@ 25.0 MW (PS mode), import was @15.0 MW. Total plant load was @
51.0MW. TG-2 and Boiler-4 were under shutdown. Boiler-1,2 & 3 were
running.
 MRS 11 KV Bus-B Incomer feeder circuit breaker tripped on "HV CB Open"
contact sensed by REC 670 relay falsely.
 Hence, at 17:04:13:342 hrs. TG-1 isolated from grid (CCB open contact)
came as per scheme and APR to AFR change over took place successfully.
However, continuous hunting was observed in frequency and load; hence TG
manual lift control command given to 50% by process group.
 TG-1 Turbine tripped on under frequency stage-2 at 17:06:15:615 hrs.
 At 17:06:26:51 TG1 generator circuit breaker & field circuit breaker tripped
on Under voltage stage 2.
 MRS Bus-B became dead hence CPP 11 KV INC-1 tipped on u/v at
17:06:28:494 and Auto change over took place in CPP 11 KV swgr
successfully..
 No any change over took place in downstream of swgrs of CPP and CPSU.
 At 17:06:27.055, TK Fan-1 & 3 tripped on overload. Process tried to increase
load on GT to maintain import but GT load was continuously on decreasing
trend and at 17:10:32:064 GT tripped on reverse power stage-1 (FSNL) due
to TKE fan 1 & 3 tripped on O/L as per logic. Active power at time of tripping
registered : 2.05MW, Reactive power : 1.56 MVAR.
ABNORMALITY REPORT -2023
Page 2 of 7
 At 17:18:34:052 GT synchronized after clearance from process.
 At 18:15:54:563 TG#1 synchronized after clearance from process.
TG-1 & GT GPR Relay events:
Time Duration Event Setting
17:04:13:342 00:00:00.000
TG-1 isolated from
Grid_ON.
17:05:52:607 00:01:39.265 81-1 Picked up_ ON
17:05:53:753 00:01:40.411 81-1 Picked up_ Off
17:06:02:766 00:01:49.424 81-1 Picked up_ ON 48 HZ & 1 Sec.
17:06:04:828 00:01:51.486 81-2 Picked up_ ON
17:06:14:826 00:02:01.484 81-2 Trip_ ON 47.5 HZ &10Sec
17:06:15:615 00:02:02.273 86T Trip_ ON
17:06:21:791 00:02:08.449
27-1 Under voltage
V < picked up_ ON
87.3 % V
17:06:22:046 00:02:08.704
24-1 v/f> warning
stage_ ON
V/F -1.10 & 10
sec.
17:06:22:691 00:02:09.349
27-1 Under voltage
V < trip_ ON
17:06:23:052 00:02:09.710
27-2 Under voltage
V << Picked up_ ON
17:06:24.000
BFP-1 Tripped on
process from DCS
17:06:26:051 00:02:12.709
27-2 Under voltage
V << Trip_ ON
83.6 % & 3.09
sec.
17:06:26:051 00:02:12.709
27-2 Under voltage
V << Trip_ ON
83.6 % & 3.09
sec.
17:06:26:078 00:02:12.736 86 U1U2 optd_ ON
17:06:26:145 00:02:12.803
TG1_FLCB&EXCON_
OFF
17:06:26:190 00:02:12.848
TG1_52G1 Close_
OFF
17:06:27:055 00:02:13.713
TK fan-3 trip on
over load
GT DCS Event
ABNORMALITY REPORT -2023
Page 3 of 7
17:06:27:055 00:02:13.658
TK fan-1 trip on
over load
GT DCS Event
17:06:28:494
00:02:15.152 11kV IC-1 Tripped
on 27-1& BC Closed
53% @1000ms
17:10:22:066 00:06:08.724
GT_Reverse power
picked_up_ON
17:10:32:064 00:06:18.722
GT_Reverse power
trip_ON
-1.5% @ 10 secs
17:10:32:065 00:06:18.723
GT_86 G1 trip
relay_optd_ON
17:10:32:068 00:06:18.726
GT_86 G2 trip
relay_optd_ON
17:10:32:151 00:06:18.809 GT_52G1 Open_ON
17:12:02:000
00:07:48.658
TK fan#2 started
and clearance given
for Sync.
GT DCS Event
17:14:16:962 00:10:03.620
TG-1 isolated from
Grid_OFF.
17:18:34:052 00:14:20.710 GT_52G1 Close_ON GT Syncronised
17:40:14:231
00:36:00.889 11kV IC-1 MCO & BC
OFF
18:15:54:563 01:11:41.221
TG-1 _52G1
Close_ON
TG-1
Syncronised
Analysis:
 TG#1 came on AFR as per CCB open contact received from MRS as per
scheme. Hunting in frequency was observed and subsequently Turbine
tripped on 86T relay actuated from 81-2 (47.5 HZ &10Sec). Further
Generator CB & Field CB tripped on 27-2 (83.6 % & 3 sec.)
 Since MRS Bus –B was isolated from MT-02 and TG#1was the only
generation source available, after tripping of TG1 MRS Bus B got dead and
11kV I/C-1 of CPP that is from MRS Bus B got tripped on under voltage (27-
1, 53% @1000ms). A/C/O taken place successfully as per scheme.
 During frequency hunting, running TK Fan-1 & Fan-3 tripped on overload.
Both motors were on MRS Bus –B on which TG#1 was connected. Hence,
motors were tripped during frequency hunting. Due to unavailability of TK-
ABNORMALITY REPORT -2023
Page 4 of 7
1/ 2 & 3 GT unload command given after 15 sec by MARK-VI as per logic.
Auto start command of standby TK-2 was after 60secs from running fan trip,
as per logic in MARK VI.
 Refer Annexures for Trend view.
Remedial action:
 System worked as per scheme.
QEHSEn (ISO 14001, 45001, 9001 & 50001) related impact:
 Nil
Sr. EE(AAS)
Through:
SM(PLP)------->SM(BGS) ------->CM(KKB) ------->AGM(RPT)
BFP-1 tripped from DCS on process at 17:06:16.591 as per event list from REM620.
45
46
47
48
49
50
51
52
53
54
55
0
10
20
30
40
50
60
17:02:01
17:02:11
17:02:21
17:02:31
17:02:41
17:02:51
17:03:01
17:03:11
17:03:21
17:03:31
17:03:41
17:03:51
17:04:01
17:04:11
17:04:21
17:04:31
17:04:41
17:04:51
17:05:01
17:05:11
17:05:21
17:05:31
17:05:41
17:05:51
17:06:01
17:06:11
17:06:21
17:06:31
17:06:41
17:06:51
17:07:01
17:07:11
17:07:21
17:07:31
17:07:41
17:07:51
17:08:01
17:08:11
17:08:21
17:08:31
17:08:41
17:08:51
17:09:01
17:09:11
17:09:21
17:09:31
17:09:41
17:09:51
17:10:01
17:10:11
17:10:21
17:10:31
17:10:41
17:10:51
17:11:01
17:11:11
17:11:21
17:11:31
17:11:41
17:11:51
17:12:01
17:12:11
17:12:21
17:12:31
17:12:41
17:12:51
17:13:01
17:13:11
17:13:21
17:13:31
17:13:41
17:13:51
17:14:01
17:14:11
17:14:21
17:14:31
17:14:41
17:14:51
17:15:01
17:15:11
17:15:21
17:15:31
17:15:41
17:15:51
17:16:01
17:16:11
17:16:21
17:16:31
15/05/2023: TG1 Turbine tripped on 81-2 (47.5@10s) followed by GCB tripped on 27-2 (83.6%@3.09s)
GT trunloaded to FSNL by TK1 & TK3 tripping on overload.
Import Power GT Load TG#1 Load Total Load TG#1 Frequency
GT Unloaded To FSNL
CCB OPEN To TG#1,
TG1 changed to AFR
86T ON_due to 81-2
Turbine Tripped
TG-1 GCB Tripped on 27-2
ACO in CPP 11kv & MRS-B
o/g feeders
Annexure-A
Note: Refer secondary axis for TG#1 frequency trend

More Related Content

Abormality Report_TG Tripped

  • 1. ABNORMALITY REPORT -2023 Page 1 of 7 CPSU/Elect./M-103/10/2023 Date: 23.06.2023 Sub: Abnormality report for TG-1 tripped on Under frequency and GT unloaded to FSNL (Reverse power relay operated) on 15.06.2023. Date& Time of Event: On 15/06/23 at 17:04:08 hrs. Effect on Plant: Maximum demand reached to 47.092 MVA (Contract demand 30.0 MVA). Description of events:  Before event, TG-1 was running @ at 11.0 MW (APR mode), GT was running @ 25.0 MW (PS mode), import was @15.0 MW. Total plant load was @ 51.0MW. TG-2 and Boiler-4 were under shutdown. Boiler-1,2 & 3 were running.  MRS 11 KV Bus-B Incomer feeder circuit breaker tripped on "HV CB Open" contact sensed by REC 670 relay falsely.  Hence, at 17:04:13:342 hrs. TG-1 isolated from grid (CCB open contact) came as per scheme and APR to AFR change over took place successfully. However, continuous hunting was observed in frequency and load; hence TG manual lift control command given to 50% by process group.  TG-1 Turbine tripped on under frequency stage-2 at 17:06:15:615 hrs.  At 17:06:26:51 TG1 generator circuit breaker & field circuit breaker tripped on Under voltage stage 2.  MRS Bus-B became dead hence CPP 11 KV INC-1 tipped on u/v at 17:06:28:494 and Auto change over took place in CPP 11 KV swgr successfully..  No any change over took place in downstream of swgrs of CPP and CPSU.  At 17:06:27.055, TK Fan-1 & 3 tripped on overload. Process tried to increase load on GT to maintain import but GT load was continuously on decreasing trend and at 17:10:32:064 GT tripped on reverse power stage-1 (FSNL) due to TKE fan 1 & 3 tripped on O/L as per logic. Active power at time of tripping registered : 2.05MW, Reactive power : 1.56 MVAR.
  • 2. ABNORMALITY REPORT -2023 Page 2 of 7  At 17:18:34:052 GT synchronized after clearance from process.  At 18:15:54:563 TG#1 synchronized after clearance from process. TG-1 & GT GPR Relay events: Time Duration Event Setting 17:04:13:342 00:00:00.000 TG-1 isolated from Grid_ON. 17:05:52:607 00:01:39.265 81-1 Picked up_ ON 17:05:53:753 00:01:40.411 81-1 Picked up_ Off 17:06:02:766 00:01:49.424 81-1 Picked up_ ON 48 HZ & 1 Sec. 17:06:04:828 00:01:51.486 81-2 Picked up_ ON 17:06:14:826 00:02:01.484 81-2 Trip_ ON 47.5 HZ &10Sec 17:06:15:615 00:02:02.273 86T Trip_ ON 17:06:21:791 00:02:08.449 27-1 Under voltage V < picked up_ ON 87.3 % V 17:06:22:046 00:02:08.704 24-1 v/f> warning stage_ ON V/F -1.10 & 10 sec. 17:06:22:691 00:02:09.349 27-1 Under voltage V < trip_ ON 17:06:23:052 00:02:09.710 27-2 Under voltage V << Picked up_ ON 17:06:24.000 BFP-1 Tripped on process from DCS 17:06:26:051 00:02:12.709 27-2 Under voltage V << Trip_ ON 83.6 % & 3.09 sec. 17:06:26:051 00:02:12.709 27-2 Under voltage V << Trip_ ON 83.6 % & 3.09 sec. 17:06:26:078 00:02:12.736 86 U1U2 optd_ ON 17:06:26:145 00:02:12.803 TG1_FLCB&EXCON_ OFF 17:06:26:190 00:02:12.848 TG1_52G1 Close_ OFF 17:06:27:055 00:02:13.713 TK fan-3 trip on over load GT DCS Event
  • 3. ABNORMALITY REPORT -2023 Page 3 of 7 17:06:27:055 00:02:13.658 TK fan-1 trip on over load GT DCS Event 17:06:28:494 00:02:15.152 11kV IC-1 Tripped on 27-1& BC Closed 53% @1000ms 17:10:22:066 00:06:08.724 GT_Reverse power picked_up_ON 17:10:32:064 00:06:18.722 GT_Reverse power trip_ON -1.5% @ 10 secs 17:10:32:065 00:06:18.723 GT_86 G1 trip relay_optd_ON 17:10:32:068 00:06:18.726 GT_86 G2 trip relay_optd_ON 17:10:32:151 00:06:18.809 GT_52G1 Open_ON 17:12:02:000 00:07:48.658 TK fan#2 started and clearance given for Sync. GT DCS Event 17:14:16:962 00:10:03.620 TG-1 isolated from Grid_OFF. 17:18:34:052 00:14:20.710 GT_52G1 Close_ON GT Syncronised 17:40:14:231 00:36:00.889 11kV IC-1 MCO & BC OFF 18:15:54:563 01:11:41.221 TG-1 _52G1 Close_ON TG-1 Syncronised Analysis:  TG#1 came on AFR as per CCB open contact received from MRS as per scheme. Hunting in frequency was observed and subsequently Turbine tripped on 86T relay actuated from 81-2 (47.5 HZ &10Sec). Further Generator CB & Field CB tripped on 27-2 (83.6 % & 3 sec.)  Since MRS Bus –B was isolated from MT-02 and TG#1was the only generation source available, after tripping of TG1 MRS Bus B got dead and 11kV I/C-1 of CPP that is from MRS Bus B got tripped on under voltage (27- 1, 53% @1000ms). A/C/O taken place successfully as per scheme.  During frequency hunting, running TK Fan-1 & Fan-3 tripped on overload. Both motors were on MRS Bus –B on which TG#1 was connected. Hence, motors were tripped during frequency hunting. Due to unavailability of TK-
  • 4. ABNORMALITY REPORT -2023 Page 4 of 7 1/ 2 & 3 GT unload command given after 15 sec by MARK-VI as per logic. Auto start command of standby TK-2 was after 60secs from running fan trip, as per logic in MARK VI.  Refer Annexures for Trend view. Remedial action:  System worked as per scheme. QEHSEn (ISO 14001, 45001, 9001 & 50001) related impact:  Nil Sr. EE(AAS) Through: SM(PLP)------->SM(BGS) ------->CM(KKB) ------->AGM(RPT) BFP-1 tripped from DCS on process at 17:06:16.591 as per event list from REM620.
  • 5. 45 46 47 48 49 50 51 52 53 54 55 0 10 20 30 40 50 60 17:02:01 17:02:11 17:02:21 17:02:31 17:02:41 17:02:51 17:03:01 17:03:11 17:03:21 17:03:31 17:03:41 17:03:51 17:04:01 17:04:11 17:04:21 17:04:31 17:04:41 17:04:51 17:05:01 17:05:11 17:05:21 17:05:31 17:05:41 17:05:51 17:06:01 17:06:11 17:06:21 17:06:31 17:06:41 17:06:51 17:07:01 17:07:11 17:07:21 17:07:31 17:07:41 17:07:51 17:08:01 17:08:11 17:08:21 17:08:31 17:08:41 17:08:51 17:09:01 17:09:11 17:09:21 17:09:31 17:09:41 17:09:51 17:10:01 17:10:11 17:10:21 17:10:31 17:10:41 17:10:51 17:11:01 17:11:11 17:11:21 17:11:31 17:11:41 17:11:51 17:12:01 17:12:11 17:12:21 17:12:31 17:12:41 17:12:51 17:13:01 17:13:11 17:13:21 17:13:31 17:13:41 17:13:51 17:14:01 17:14:11 17:14:21 17:14:31 17:14:41 17:14:51 17:15:01 17:15:11 17:15:21 17:15:31 17:15:41 17:15:51 17:16:01 17:16:11 17:16:21 17:16:31 15/05/2023: TG1 Turbine tripped on 81-2 (47.5@10s) followed by GCB tripped on 27-2 (83.6%@3.09s) GT trunloaded to FSNL by TK1 & TK3 tripping on overload. Import Power GT Load TG#1 Load Total Load TG#1 Frequency GT Unloaded To FSNL CCB OPEN To TG#1, TG1 changed to AFR 86T ON_due to 81-2 Turbine Tripped TG-1 GCB Tripped on 27-2 ACO in CPP 11kv & MRS-B o/g feeders Annexure-A Note: Refer secondary axis for TG#1 frequency trend