ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Adriana Rivera Figueroa
Cel: (787) 671-1617 adriana.rivera.nenergys@gmail.com Killeen, TX 76542
OBJECTIVE________________________________________________________________________________________
A driven and enthusiastic Mechanical Engineer graduate with 3 years of technical experience in facility maintenance and quality
operation management, program development and implementation, mechanical construction project management and training,
seeking a position in the field of Aerospace Engineering, Renewable Energy Operation Systems and Potable Groundwater Systems
where I can use my educational background and skills to exceed customer satisfaction and contribute to the success of the company.
EDUCATION_______________________________________________________________________________
B.S. IN MECHANICAL ENGINEERING
University of Puerto Rico, Mayagüez Campus (Graduation Date: December 2013)
PROJECT MANAGEMENT WORKSHOP (.6CEUs)
Fred Pryor Seminars, PARK UNIVERSITY ENTERPRISES INC (Date Completed: February 2015)
AS9100C:2009/ISO9001:2008 INTERNAL AUDITOR CERTIFICATE
PRIMEX Puerto Rico Manufacturing Extension (NIST, MEP) (Date Completed: March 2015)
AS9100C:2009/ISO9001:2008 ACADEMY CERTIFICATE (64 HRS)
PRIMEX Puerto Rico Manufacturing Extension (NIST, MEP) (Date Completed: March 2015)
OSHA CONSTRUCTION STANDARD CERTIFICATE (30HRS) (Date Completed: August 2015)
ENOSHA Academy & Consultant LLC
SKILLS____________________________________________________________________________________________
• Fully Bilingual in English and Spanish (1year French)
• Interpersonal Skills (fast learner, persistent, determined, teamwork, leadership, and responsible)
• Computer Background (Skype, JoinMe, Microsoft Office, Excel, Power Point, OneNote, Outlook)
• Engineering Programs (Auto Cad, EES, MD Solids, Fast Pipe Estimating, Pro Engineer, eMaint and MyMCS)
• Building Thermal Analysis Course
• Public Speaking Course
• Renewable Energy Course
• Worked monitoring and analyzing energy consumption and effectiveness for components and environmental factors in a coffee roaster model in
Mechanical Engineering department investigation at Mayaguez Campus, University of Puerto Rico (Aug-Dec 2013)
• Worked in manufacturing, labeling and packaging of artisan natural soaps and body products (2013-2016)
EMPLOYMENT____________________________________________________________________________________
Jr. Project Engineer / Quality Internal Auditor January - November (2015)
National Industrial Services Hewlett Packard Aguadilla, PR
 Supervised and improved facility operational systems, processes and policies in support of organization’s mission
ï‚· Supported management and monitored maintenance indicator reporting logs
ï‚· Ensured information flow and management, business process and organizational planning
ï‚· Oversight of overall financial management, planning, systems and controls
ï‚· Coordinated services and conducted walk-through with suppliers for service and materials
ï‚· Determined project specifications by conducting comprehensive analysis of product design, customer requirements, and
performance standards
ï‚· Prepared cost estimates for equipment repair, replacement or overall construction material and labor
ï‚· Maintained project timelines by proactively resolving any anticipated problems, coordination of activities and monitoring
progress
 Provided detailed project updates in the weekly operations report for site’s critical equipment and ongoing projects
ï‚· Performed weekly safety and performance quality audits on personnel
 Lead quality management team and implemented ISO9001/AS9100C standards in the company’s quality management
system to increase client satisfaction, improve business market opportunities, increase operation effectiveness and service
quality.
CMMS Administrator / Project Coordinator January – December (2014)
National Industrial Services Hewlett Packard Aguadilla, PR
 Directed and operated CMMS for site’s infrastructure and critical equipment such as Generators, UPS, AHU, Exhaust Fans,
Chiller, Cooling Towers, Pumps, Fire Protection Equipment, Kitchen Equipment, Air Compressors, Dryers, etc.
ï‚· Responsible for scheduling and managing preventive maintenance work order tasks, assigned personnel, and equipment
maintenance frequencies according to equipment requirements
ï‚· Reported and managed corrective work orders for equipment malfunction repair or replacement and implemented an
effective preventive maintenance program to reduce time spent on unplanned maintenance repairs.
 Supported and promoted site’s EHS program, and ensured personnel safety according to OSHA standards
 Maintained oversight of the overall facility’s production reliability and continuously maximized efficiencies by
implementing a performance improvement model throughout the operation.
Project Coordinator & Supervisor April-July (2013)
F. Berrios, S.E. Peñuelas, Puerto Rico
ï‚· Project Lead for coordinating and managing a groundwater potable system project between the CH2MHILL client and
contractor
ï‚· Developed the pricing estimates for project mechanical and control systems including materials, labor and change orders
ï‚· Contributed and attended the morning safety meetings before daily labor duties to promote a culture of safety.
 Managed work activity and AHA’s, personnel selection and certification documentation
ï‚· Ordered and coordinated timely delivery of materials to project site
ï‚· Supervised personnel on work quality and safety practices on the project site
ï‚· Handled equipment rigging, mobilization and installation
ï‚· Conducted underground and ground level piping pressure tests
ï‚· Mechanical/ Control system final inspection and punch list.
Preventive Maintenance & CMMS Implementation January – July (2013)
National Industrial Services Hewlett Packard Aguadilla, PR
ï‚· Equipment data entry, implementation, operation and administration of CMMS (Computerized Maintenance Management
System) program for facility’s operations and infrastructure equipment such Generators, UPS, AHU, Exhaust Fans, Chiller,
Cooling Towers, Pumps, Fire Protection Equipment, Kitchen Equipment, etc.
ï‚· Start-up for scheduling and personally managed preventive maintenance work order tasks, frequencies and assigned
personnel according to equipment specifications
ï‚· Provided management weekly status of preventive maintenance schedules and equipment malfunctions
 Scheduled preventive maintenance to reduce time spent on unplanned repairs and improved facility’s overall operational and
production reliability.
Manufacturing Process & Quality Control Intern Summer (2008)
Caribe General Electric Vega Baja, Puerto Rico
 Collected and analyzed data from CNC machinery in manufacturing area for industrial breakers’ parts production, reaching
a more efficient process for enhanced product quality by applying the Lean Manufacturing practices learned in internship.
ï‚· Batch data entry and time studies for CNC machinery in manufacturing area
ï‚· Analyzed and improved flow process layouts
ï‚· Findings of the analysis suggested preventive maintenance program for CNC machinery tooling thus significantly reducing
production down time and eliminating material waste
Piping Estimate Assistant Summer (2007)
National Mechanical Contractors Corp. Guaynabo, Puerto Rico
ï‚· Assisted project Mechanical Engineer in estimating HVAC components such as piping, fitting valves, and accessories for
different project proposals.
Validation Documentation Intern Summer (2006)
National Mechanical Contractors Corp. Guaynabo, Puerto Rico
ï‚· Collected all documentation necessary to validate and certify purified water system installations in pharmaceutical sites.
 Validation reports included welding parts documentation, isometrics, welder’s certification and equipment calibration for
purified water systems.
ORGANIZATIONS_________________________________________________________________________________
• Annual Dance Scholarship for Mayagüez Campus, University of Puerto Rico dance team (2006-2009)
• Member of the American Society of Mechanical Engineers (ASME) 2008-2010
• Member of the National Association of Professional Women (NAPW) 2015

More Related Content

Adriana Rivera Figueroa RESUME

  • 1. Adriana Rivera Figueroa Cel: (787) 671-1617 adriana.rivera.nenergys@gmail.com Killeen, TX 76542 OBJECTIVE________________________________________________________________________________________ A driven and enthusiastic Mechanical Engineer graduate with 3 years of technical experience in facility maintenance and quality operation management, program development and implementation, mechanical construction project management and training, seeking a position in the field of Aerospace Engineering, Renewable Energy Operation Systems and Potable Groundwater Systems where I can use my educational background and skills to exceed customer satisfaction and contribute to the success of the company. EDUCATION_______________________________________________________________________________ B.S. IN MECHANICAL ENGINEERING University of Puerto Rico, Mayagüez Campus (Graduation Date: December 2013) PROJECT MANAGEMENT WORKSHOP (.6CEUs) Fred Pryor Seminars, PARK UNIVERSITY ENTERPRISES INC (Date Completed: February 2015) AS9100C:2009/ISO9001:2008 INTERNAL AUDITOR CERTIFICATE PRIMEX Puerto Rico Manufacturing Extension (NIST, MEP) (Date Completed: March 2015) AS9100C:2009/ISO9001:2008 ACADEMY CERTIFICATE (64 HRS) PRIMEX Puerto Rico Manufacturing Extension (NIST, MEP) (Date Completed: March 2015) OSHA CONSTRUCTION STANDARD CERTIFICATE (30HRS) (Date Completed: August 2015) ENOSHA Academy & Consultant LLC SKILLS____________________________________________________________________________________________ • Fully Bilingual in English and Spanish (1year French) • Interpersonal Skills (fast learner, persistent, determined, teamwork, leadership, and responsible) • Computer Background (Skype, JoinMe, Microsoft Office, Excel, Power Point, OneNote, Outlook) • Engineering Programs (Auto Cad, EES, MD Solids, Fast Pipe Estimating, Pro Engineer, eMaint and MyMCS) • Building Thermal Analysis Course • Public Speaking Course • Renewable Energy Course • Worked monitoring and analyzing energy consumption and effectiveness for components and environmental factors in a coffee roaster model in Mechanical Engineering department investigation at Mayaguez Campus, University of Puerto Rico (Aug-Dec 2013) • Worked in manufacturing, labeling and packaging of artisan natural soaps and body products (2013-2016) EMPLOYMENT____________________________________________________________________________________ Jr. Project Engineer / Quality Internal Auditor January - November (2015) National Industrial Services Hewlett Packard Aguadilla, PR ï‚· Supervised and improved facility operational systems, processes and policies in support of organization’s mission ï‚· Supported management and monitored maintenance indicator reporting logs ï‚· Ensured information flow and management, business process and organizational planning ï‚· Oversight of overall financial management, planning, systems and controls ï‚· Coordinated services and conducted walk-through with suppliers for service and materials ï‚· Determined project specifications by conducting comprehensive analysis of product design, customer requirements, and performance standards ï‚· Prepared cost estimates for equipment repair, replacement or overall construction material and labor ï‚· Maintained project timelines by proactively resolving any anticipated problems, coordination of activities and monitoring progress ï‚· Provided detailed project updates in the weekly operations report for site’s critical equipment and ongoing projects ï‚· Performed weekly safety and performance quality audits on personnel ï‚· Lead quality management team and implemented ISO9001/AS9100C standards in the company’s quality management system to increase client satisfaction, improve business market opportunities, increase operation effectiveness and service quality.
  • 2. CMMS Administrator / Project Coordinator January – December (2014) National Industrial Services Hewlett Packard Aguadilla, PR ï‚· Directed and operated CMMS for site’s infrastructure and critical equipment such as Generators, UPS, AHU, Exhaust Fans, Chiller, Cooling Towers, Pumps, Fire Protection Equipment, Kitchen Equipment, Air Compressors, Dryers, etc. ï‚· Responsible for scheduling and managing preventive maintenance work order tasks, assigned personnel, and equipment maintenance frequencies according to equipment requirements ï‚· Reported and managed corrective work orders for equipment malfunction repair or replacement and implemented an effective preventive maintenance program to reduce time spent on unplanned maintenance repairs. ï‚· Supported and promoted site’s EHS program, and ensured personnel safety according to OSHA standards ï‚· Maintained oversight of the overall facility’s production reliability and continuously maximized efficiencies by implementing a performance improvement model throughout the operation. Project Coordinator & Supervisor April-July (2013) F. Berrios, S.E. Peñuelas, Puerto Rico ï‚· Project Lead for coordinating and managing a groundwater potable system project between the CH2MHILL client and contractor ï‚· Developed the pricing estimates for project mechanical and control systems including materials, labor and change orders ï‚· Contributed and attended the morning safety meetings before daily labor duties to promote a culture of safety. ï‚· Managed work activity and AHA’s, personnel selection and certification documentation ï‚· Ordered and coordinated timely delivery of materials to project site ï‚· Supervised personnel on work quality and safety practices on the project site ï‚· Handled equipment rigging, mobilization and installation ï‚· Conducted underground and ground level piping pressure tests ï‚· Mechanical/ Control system final inspection and punch list. Preventive Maintenance & CMMS Implementation January – July (2013) National Industrial Services Hewlett Packard Aguadilla, PR ï‚· Equipment data entry, implementation, operation and administration of CMMS (Computerized Maintenance Management System) program for facility’s operations and infrastructure equipment such Generators, UPS, AHU, Exhaust Fans, Chiller, Cooling Towers, Pumps, Fire Protection Equipment, Kitchen Equipment, etc. ï‚· Start-up for scheduling and personally managed preventive maintenance work order tasks, frequencies and assigned personnel according to equipment specifications ï‚· Provided management weekly status of preventive maintenance schedules and equipment malfunctions ï‚· Scheduled preventive maintenance to reduce time spent on unplanned repairs and improved facility’s overall operational and production reliability. Manufacturing Process & Quality Control Intern Summer (2008) Caribe General Electric Vega Baja, Puerto Rico ï‚· Collected and analyzed data from CNC machinery in manufacturing area for industrial breakers’ parts production, reaching a more efficient process for enhanced product quality by applying the Lean Manufacturing practices learned in internship. ï‚· Batch data entry and time studies for CNC machinery in manufacturing area ï‚· Analyzed and improved flow process layouts ï‚· Findings of the analysis suggested preventive maintenance program for CNC machinery tooling thus significantly reducing production down time and eliminating material waste Piping Estimate Assistant Summer (2007) National Mechanical Contractors Corp. Guaynabo, Puerto Rico ï‚· Assisted project Mechanical Engineer in estimating HVAC components such as piping, fitting valves, and accessories for different project proposals. Validation Documentation Intern Summer (2006) National Mechanical Contractors Corp. Guaynabo, Puerto Rico ï‚· Collected all documentation necessary to validate and certify purified water system installations in pharmaceutical sites. ï‚· Validation reports included welding parts documentation, isometrics, welder’s certification and equipment calibration for purified water systems. ORGANIZATIONS_________________________________________________________________________________ • Annual Dance Scholarship for Mayagüez Campus, University of Puerto Rico dance team (2006-2009) • Member of the American Society of Mechanical Engineers (ASME) 2008-2010 • Member of the National Association of Professional Women (NAPW) 2015