ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Curriculum Vitae Electrical Construction / Quality Department
Alaa El-din Ahmed Mohamed
Personal Details:
Full Name: Alaa El-din Ahmed Mohamed Omer
Date of Birth: (DD MMM YY) 27 January, 1971
Nationality: Egyptian
Marital Status: Married
Permanent Address: 794 Cornish El-Dekhela St., Alexandria, Egypt
Temporary Address:
Passport:
Number: 536489
Country of Issue: (18) Alexandria Egypt
Contact Details:
Mobile #: 0100 6160 238 & 0127 3677 344
E-mail:
Alaaahmed.mohamed@orascomci-projects.com
Alaa.ahmedeng10@Yahoo.com
Alaa.ahmedeng10@gmail.com
Education:
Primary Qualification:
Level: 1. B.Sc., Electronic Engineer (Instrumentation & Control)
Discipline: Electrical, Power Experiences
Other Qualifications:
Level: 1. 2. 3.
Discipline:
Continuing Professional Development: (Reverse chronological order, i.e. latest first)
Dates (DD MMM YY) Courses
From To Subject Provider
June 1995 Sept. 1995
Modern Control System
/Robotic
Control
System/Indu
strial
Electronic
Faculty of Electronic Engineering
June 1996 August 1996
Ac Motor Driver-Dc Motor
Driver/
Measurement
s /Power
Electronic
/Electrical
Machine
Faculty of Electronic Engineering
November December
Measurement Techniques
and Methods
for the
Optimization
of Solar
Thermal
Power Plants
(CSP)"
German Aerospace Center (DLR) in
Plataforma Solar de
Almeria (PSA) Spain
As per the attached course cotenants
December
Cost of Quality Course Orascom Construction Industries
Core Competencies:
• Electrical, Power • Control, Instrumentation • As Built Drawings
• QA/QC • Technical Support • Start Up, Operation, Maintenance
Career Summary: (Reverse chronological order, i.e. latest first)
Years Job Titles Employers
PG/QMS/SF/012/00 CV Standard Format Page 1 of 7
From
(YYYY)
To Duration
(+/- 0.25 yr)
2013
Till (MEP) QA/QC Team Leader
Engineer
Orascom / Besix Joint Venture
2010 2013 20 Month
Senior Electrical QA/QC&
Construction
Engineer
Orascom / Besix Joint Venture
2008 2010 28 Month
Senior Electrical, Control QA/QC&
Construction
Engineer
Orascom / Besix Joint Venture
2007 2008 12 Month
Senior Electrical Control,
Instrumentations
Commissioning
Engineer
Orascom / Besix Joint Venture
2005 2007 20 Month
Instrumentation & Electrical
Engineer
Mitsubishi Heavy Industries Co.
(Nagasaki) Japan
2004 2005 11 Month
Instrumentation & Electrical
Engineer
Mitsubishi Heavy Industries Co.
(Yokohama) Japan
2003 2004 7 Months
Project Electrical and Control
Construction
Manager
EMEC & ABB SUSA, INC. Co.
2001 2003 21 Month Electrical Manager Fast for Engineering Contracting Co.
2001 2001 4 Months Electrical Engineer Petrogas, Petromaint Co.’s
2001 2001 6 Months
Electrical and Instrumentation
Engineer
Tarrad Co., Foster Weller Co. (French)
2000 2000 5 Months Instrumentation Supervisor Bechtel Corporation Co. (American)
1999 2000 16 Month Instrumentation Engineer Deasun, Samsung Co.’s (Korean)
1997 1997 5 Months Instrumentation Supervisor Petro jet Co. (Egyptian)
Career History:
Year From: 28/09/2013
Year To: Till now
Job Title: (MEP) QA/QC Team Leader Engineer
Employer: Orascom/Besix Project: - Grand Egyptian Museum
Main Duties of my Role:
• Supervised and supported suppliers, subcontractors to achieve project specification, inspection and testing
requirements ITP’s
• Supervised and performed the developments and execution of inspections and test plans for all permanent
Electrical Works Embed and Expose items (Lighting, Lighting Control,UBS, Medium and Low Power
Systems), Electromechanical Equipment’s (Elevators and Escalators/moving walks ,AHU, Boiler, Cooling
system,…..Etc.)
and Low Current Systems (Telephone, Fire Alarm and Voice Evacuation system, Security, Intruder Alarm,
Access Control, ICT,CCTV,BMS, Refuge and Disabled , ,,, Etc.)
• Reviewed all Electrical project procedures, Method of Statements and coordinate developments it’s to
obtain the specific detailed procedures ,Specifications and also perform the supported to other
departments onsite and offsite in accordance with the project requirements.
• Implement the preventive and corrective actions to achieving the specified quality and testing
requirements.
• Supervised non-conformities reports NCR’s, Surveillance notes to achieve minimum entries through
preventive actions.
• Coordinate positively meetings between the Consultant, Orascom teams and subcontractors to meet with
the quality requirements by the Client.
• Managing the Inspection Test Plans for all Electrical work according to the scope of work prior to all
Inspect each system,.
• Managing and recording the Electrical quality documentation.
•
•
•
•
PG/QMS/SF/012/00 CV Standard Format Page 2 of 7
Career History:
Year From: 01/11/2010
Year To: 30/07/2013
Job Title: Senior Electrical QA/QC& Construction Engineer
Employer: Orascom/Besix Project: - Abo Qir Thermal Power Plant Project
Main Duties of my Role:
• Supervised and supported suppliers, subcontractors to achieve project specification, inspection and testing
requirements ITP’s
• Supervised and performed the developments and execution of inspections and test plans for all permanent
Electrical, Control, Instrumentation and HVAC works.
• Reviewed all Electrical project procedures and coordinate developments it’s to obtain the specific detailed
procedures ,Specifications and also perform the supported to other departments onsite and offsite in
accordance with the project requirements.
• Implement the preventive and corrective actions to achieving the specified quality and testing
requirements.
• Supervised materials receiving inspections and prepared the MRR’s for all permanent Electrical materials
and Equipments onsite and offsite, managed developments of a quality, construction and warehouse
teams.
• Communicated all Orascom departments’ requirements, procedures and forms and quality training to
Orascom teams, suppliers and subcontractors and managed their effective implementation,
• Supervised non-conformities reports NCR’s, Surveillance notes to achieve minimum entries through
preventive actions.
• Coordinate positively meetings with Orascom teams and subcontractors to meet with the quality
requirements by the Client, Consultants.
• Managing the punch lists for Electrical, HVAC work and closed out the possible items prior to all hand over
systems, Prepare the Electrical and Electromechanical Turnover packages.
• Managing and recording the quality documentation for hand over.
Notable Achievements that I brought about in this role:
Career History:
Year From: 14/06/2008
Year To: 30/10/2010
Job Title: Senior Electrical, Control QA/QC& Construction Engineer
Employer: Orascom/Besix Project: - Sidi Krir Power Station 2*750MW Combined Cycle
Main Duties of my Role:
• Supervised and supported suppliers, subcontractors to achieve project specification, inspection and testing
requirements ITP’s.
• Supervised and performed the developments and execution of inspections and test plans for all permanent
electrical, Instrumentation and control works.
• Reviewed all electrical project procedures and coordinate developments it’s to obtain the specific detailed
procedures , also perform the supported to other departments onsite and offsite in accordance with the
project requirements.
• Implement the preventive and corrective actions to achieving the specified quality and testing
requirements.
• Supervised materials receiving inspections and prepared the MRR’s for all permanent electrical materials
and equipments onsite and offsite, managed developments of a quality, construction and warehouse
teams.
• Communicated all Orascom departments’ requirements, procedures and forms and quality training to
Orascom teams, suppliers and subcontractors and managed their effective implementation,
• Supervised non-conformities reports NCR’s, Surveillance notes to achieve minimum entries through
preventive actions.
• Coordinate positively meetings with Orascom teams and subcontractors to meet with the quality
requirements by the Client, Consultants.
• Managing the punch lists for electrical work and closed out the possible items prior to all hand over
systems, Prepare the Electrical and Electromechanical Turnover packages.
• Managing and recording the quality documentation for hand over.
Notable Achievements that I brought about in this role:
• Working for quality and construction works in one time and complete my tasks perfectly.
Year From: 27/03/2007
Year To: 12/03/2008
Job Title: Senior Electrical & Control Commissioning Engineer
PG/QMS/SF/012/00 CV Standard Format Page 3 of 7
Employer: General Electric, Orascom/Besix Project: - Sea Water Desalination Project, Hamma, Algeria
Main Duties of my Role:
• Check all instrumentation P&ID drawing with the received instruments, equipments and prepare site
schedules for installations and test plan.
• Installation all instrument devices such as panels, analyzers, flow, pressure, temperature, level instruments
and air supply units including air lines , air bots ,sensing lines and their tests.
• Instrumentation loop test between field instruments and SCADA control system.
• Commissioning and testing for start up with calibrations of instruments, valves & loop check from filed to
SCADA or PLC with preparing the related certificates and commissioning sheets.
• Environmental monitoring & analysis system (series) SO2, O2, Dust, humidity analyser’s calibrations.
• Optical fibre cables testing & power tester telecommunications and telephone exchange system
commissioning.
• Reporting to all Orascom departments and implement the coordination meetings to discuss construction
progress and any required preventive actions for qualification works.
Notable Achievements that I brought about in this role:
• Because of my helping the handing over completed within the schedules time without any delay time and
Orascom appreciated me through the top managers.
Year From: 01/07/2005
Year To: 20/03/2007
Job Title: Instrumentation & Electrical Engineer
Employer:
Mitsubishi Heavy Industries ,Ltd( Nagasaki ) Project: - Nubaria Power I&II ,2*750MW
Combined Cycle ( West Delta Power Generation Co. )
Main Duties of my Role:
• Supervise all subcontractor teams for Erections and installations all instrumentation raceways, stanchions,
trays, racks and supports........ Etc.
• Supervise all subcontractor teams for Erections and installations all filed control junction boxes, panels,
analysers, DCS consoles, printers, engineering work station, cabinets, detectors, transmitters( flow-
pressure-level-temperature ), control switches, control valves, gauge’s and sensors ........etc.
• Erection and adjustments all steam turbine supervisory instruments ( Bentley Nevada PLC ).
• Supervise all subcontractor teams for Erections and installations the air supplies piping, tubing, hook up
(s.s sensing lines) and pneumatic, hydro tests.
• Supervise the cables laying, connection, terminations, and test of cables (Including the fibber optic cables).
• Tests, calibrations, loop check, pre-commissioning and commissioning of systems.
• Loop Energization and start up.
Notable Achievements that I brought about in this role:
• During the operation of the steam turbine i made analysis for some problems and successes for solving its.
Year From:
10/07/2004
Year To: 10/06/2005
Job Title: Instrumentation & Electrical Engineer
Employer:
Mitsubishi Heavy Industries Ltd, Vinci Construction Grand’s Project:-Egyptian LNG, Idku,
Egypt
Main Duties of my Role:
• Supervise all subcontractor teams for Erections and installations all Electrical & instrumentation raceways,
stanchions, trays, racks and supports........ Etc.
• Supervise all subcontractor teams for Erections and installations all filed control junction boxes, panels,
analysers, cabinets, detectors, transmitters( flow-pressure-level-temperature ), control switches, control
valves, gauge’s and sensors ........etc.
• Supervise the Erection of all Lighting and power systems, Fire Alarm System, Air Craft Warning Light and
grounding system.
• Supervise all subcontractor teams for Erections and installations Gas Detectors, tubing, hook up ( s.s
sensing lines ) and tests.
• Supervise the Power and Instrumentation cables pulling, connection, terminations, and test of cables.
• Implement the preventive and corrective actions to achieving the specified quality and testing
requirements.
• Tests, calibrations, loop check, pre-commissioning and commissioning of systems.
• Loop Energization and start up.
• Quality Inspections, prepared as built drawings.
• Systems Hand Over.
PG/QMS/SF/012/00 CV Standard Format Page 4 of 7
•
Notable Achievements that I brought about in this role:
• N.A
Year From: 01/09/2003
Year To: 20/02/2004
Job Title: Project Electrical and Control Construction Manager
Employer: EMEC, ABB SUSA Project: - AGOSD East & West Treatment Plant, Alexandria
Main Duties of my Role:
• Check all instrumentation P&ID drawing with the received instruments, equipments and prepare site
schedules for installations and test plan. Specially chlorination buildings.
• Ensure that field purchased materials meet project requirements.
• Supervise the Erection of all Lighting and power systems, Fire Alarm System, transformers, motor control
centre panels, lightning protection, security systems and grounding system.
• Supervise the Power and Instrumentation cables pulling, connection, terminations, and test of cables.
• Supervise all subcontractor teams for Erections and installations all filed control junction boxes, panels,
analysers, cabinets, detectors, transmitters( flow-pressure-level-temperature ), control switches, control
valves, gauge’s and sensors ........etc.
• Tests, calibrations, loop check, pre-commissioning and commissioning of systems.
• Loop Energization and start up.
Notable Achievements that I brought about in this role:
• N.A
Year From: 05/10/2001
Year To: 30/07/2003
Job Title: Electrical Manager
Employer:
Fast for Engineering & Contracting, Wady El-Nil for Contracting Project: -EGPC New
Administration Building, Merghem, Alexandria
Main Duties of my Role:
• Adhere to the project drawings and specifications.
• Ensure that field purchased materials meet project requirements.
• Inspection as regards receiving, storage, installation, and performance and operational testing of electrical
equipments, power systems, CCTV system, telephone system, fire protection system, public address,
apparatus and related protective and control circuits.
• Assigned field engineers to monitor and inspect the electrical and control systems.
• Monitored all quality control documentation requirements and ensured that required reports are prepared,
accepted, and filed in accordance with project procedures, review and approved changes to these
procedures.
• Fulfilled all safety and quality requirements pertaining to the work.
• Directed the craft installing all electrical and control systems.
• Evaluate shipping damage to electrical equipment and recommend corrective action.
• Provide technical directions and monitor installation and pre-commissioning and commissioning tests.
• Notify supervision and PFE when corrective action is required to correct any quality problems.
•
Notable Achievements that I brought about in this role:
• N.A
Year From: 05/06/2001
Year To: 30/09/2001
Job Title: Electrical Engineer
Employer:
Falcon Power System CO., Petromaint Co. Project: -Petrogas Plant–Wady El-Khmer
Alexandria
Main Duties of my Role:
• Ensure that field purchased materials meet project requirements. Specially the (Explosion proof type EEX).
• Inspection as regards receiving, storage, installation, and performance and operational testing of electrical
equipments, power systems apparatus and related protective and control circuits.
• Fulfilled all safety and quality requirements pertaining to the work.
• Supervise the Erection of all normal & explosion proof Lighting, power and Earthing systems.
• Tests and energized the systems.
Notable Achievements that I brought about in this role:
• N.A
Year From: 01/01/2001
PG/QMS/SF/012/00 CV Standard Format Page 5 of 7
Year To: 30/05/2001
Job Title: Electrical and Instrumentation Engineer in Wax Slap Moulding unit.
Employer: Tarrad Co. , Foster Weller France Project: - Amoc Lube Oil Expansion Project, Alexandria
Main Duties of my Role:
• Supervise all subcontractor teams for Erections and installations all electrical & instrumentation raceways,
stanchions, trays, racks and supports........ Etc.
• Supervise all teams for Erections and installations all filed control junction boxes, panels, cabinets,
detectors, transmitters (flow-pressure-level-temperature), control switches, control valves, gauges and
sensors ........etc.
• Supervise the cables pulling, connection, terminations, and test of cables.
• Tests, calibrations, loop check, pre-commissioning and commissioning of systems.
• Loop Energization and start up.
Notable Achievements that I brought about in this role:
• N.A
Year From: 01/08/2000
Year To: 30/12/2000
Job Title: Instrumentation Supervisor
Employer: Tarrad Co. , Bechtel Project: - Intergen Power Generation 3&4, Sidi Krir, Alexandria
Main Duties of my Role:
• Supervise all teams for Erections and installations all instrumentation raceways, stanchions, trays, racks
and supports........ Etc.
• Supervise all teams for Erections and installations all filed control junction boxes, panels, analysers, DCS
consoles, printers, engineering work station, cabinets, detectors, transmitters( flow-pressure-level-
temperature ), control switches, control valves, gauge’s fire alarm devices and cabinets........etc.
• Supervise all teams for Erections and installations the tubing, hook up (s.s sensing lines) and pneumatic
test.
• Tests, calibrations, loop check, pre-commissioning and commissioning of systems.
• Loop Energization and start up.
Notable Achievements that I brought about in this role:
• N.A
Year From: 01/03/1999
Year To: 25/07/2000
Job Title: Instrumentation Engineer
Employer:
Deasun, Samsung Co.’s (Korean) Project: - 2000mt/y Polyethylene, Sidi Krir Petrochemicals
Co. Egypt
Main Duties of my Role:
• Check all instrumentation P&ID drawing with the received instruments, equipments and prepare site
schedules for installations and test plan.
• Ensure that field purchased materials meet project requirements.
• Inspection as regards receiving, storage, installation, and performance and operational testing of
instrumentation equipments.
• Supervise the Instrumentation cables pulling, connection, terminations, and test of cables.
• Supervise all teams for Erections and installations all filed control junction boxes, panels, analysers, DCS
consoles, printers, engineering work station, cabinets, detectors, transmitters( flow-pressure-level-
temperature ), control switches, control valves, gauge’s , Analyzers and gas detectors........etc.
• Tests, calibrations, loop check, pre-commissioning and commissioning of systems.
• Loop Energization and start up.
Notable Achievements that I brought about in this role:
• N.A
Year From: 20/06/1997
Year To: 10/11/1997
Job Title: Instrumentation Supervisor
Employer: Petro jet Co. Gas Co. Project: - Gas Ras Ghareb, Red Sea, Egypt
Main Duties of my Role:
• Managing Erection of Instrumentation Raceways such as Trucking, Cable Trays, Racks, Conduits, etc
• Review the design drawing and compared it’s with the received materials.
• Supervise all teams for Erections and installations all filed control junction boxes, panels, analysers,
termination cabinets, detectors, transmitters (flow-pressure-level-temperature), control switches, control
valves, gauge’s ..........Etc.
Notable Achievements that I brought about in this role:
PG/QMS/SF/012/00 CV Standard Format Page 6 of 7
• N.A
PG/QMS/SF/012/00 CV Standard Format Page 7 of 7

More Related Content

What's hot (20)

Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
Muhammad Rizwan
Ìý
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
Mohammed Seddik
Ìý
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
sajeevrajagopalan nair
Ìý
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
Ahmed Maamoun
Ìý
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
sharib reza
Ìý
RA CV Current
RA CV CurrentRA CV Current
RA CV Current
Rab anderson
Ìý
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
Nouman Jamil
Ìý
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
Yacine Sayad
Ìý
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
Yasser Wahba
Ìý
CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5
Rana Tanveer Ahmed
Ìý
Engr. sayed assawy
Engr. sayed assawyEngr. sayed assawy
Engr. sayed assawy
? ??? ?????? ??????
Ìý
RESUME - Copy
RESUME - CopyRESUME - Copy
RESUME - Copy
Ahmad Ali Khan
Ìý
CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3
Adewale Oluwaseun
Ìý
V.Prado.Jr_CV
V.Prado.Jr_CVV.Prado.Jr_CV
V.Prado.Jr_CV
Vicente Prado
Ìý
Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev b
Damian Connelly
Ìý
سيرة ذاتية عبد النبي انجليزي[1]
سيرة  ذاتية عبد النبي انجليزي[1]سيرة  ذاتية عبد النبي انجليزي[1]
سيرة ذاتية عبد النبي انجليزي[1]
عبدالنبي شحات
Ìý
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
noli donez
Ìý
SHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUMESHAMSHAD QAQC RESUME
SHAMSHAD QAQC RESUME
MOHAMMED SHAMSHAD ALAM
Ìý
mduduzi'cv
mduduzi'cvmduduzi'cv
mduduzi'cv
Mduduzi Ndhlovu
Ìý
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)
Ahmed Rageh
Ìý
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
Muhammad Rizwan
Ìý
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
Mohammed Seddik
Ìý
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
sajeevrajagopalan nair
Ìý
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
Ahmed Maamoun
Ìý
1. Sharib Reza(CV)
1. Sharib Reza(CV)1. Sharib Reza(CV)
1. Sharib Reza(CV)
sharib reza
Ìý
RA CV Current
RA CV CurrentRA CV Current
RA CV Current
Rab anderson
Ìý
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
Nouman Jamil
Ìý
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
Yacine Sayad
Ìý
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
Yasser Wahba
Ìý
CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5
Rana Tanveer Ahmed
Ìý
CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3CVELITE_67b6a3f47c1689cf3b3
CVELITE_67b6a3f47c1689cf3b3
Adewale Oluwaseun
Ìý
Tct ccs master 180917 rev b
Tct ccs master 180917 rev bTct ccs master 180917 rev b
Tct ccs master 180917 rev b
Damian Connelly
Ìý
سيرة ذاتية عبد النبي انجليزي[1]
سيرة  ذاتية عبد النبي انجليزي[1]سيرة  ذاتية عبد النبي انجليزي[1]
سيرة ذاتية عبد النبي انجليزي[1]
عبدالنبي شحات
Ìý
Noli updated Resume
Noli updated ResumeNoli updated Resume
Noli updated Resume
noli donez
Ìý
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)
Ahmed Rageh
Ìý

Similar to Alaa QA-QC last Applicant CV-2 (20)

M Imran
M ImranM Imran
M Imran
Mohammed Imran
Ìý
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
usman ahmed
Ìý
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
Abdul Hakkim
Ìý
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
Nadeem Akhtar
Ìý
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
ENGADAM
Ìý
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
Abdul Hakkim
Ìý
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
Salman Faris
Ìý
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
Khalid Eltahir
Ìý
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
Noor Ali Sy
Ìý
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
Muhammad Nouman
Ìý
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
fady toma
Ìý
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
Kashif ali muhammad
Ìý
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
Ìý
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
SiJiN SiDharTH
Ìý
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
Edwin Baldelovar
Ìý
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
Reynaldo Carlos,Jr. Duyanen
Ìý
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
prabu kanthasamy
Ìý
nestor
nestornestor
nestor
Nestor Dungca
Ìý
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
Eslam Mohamed
Ìý
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
barun dutta
Ìý
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
usman ahmed
Ìý
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
Abdul Hakkim
Ìý
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
ENGADAM
Ìý
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
Abdul Hakkim
Ìý
Electrical QA QC Engineer
Electrical QA QC EngineerElectrical QA QC Engineer
Electrical QA QC Engineer
Salman Faris
Ìý
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
Khalid Eltahir
Ìý
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
Noor Ali Sy
Ìý
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
Muhammad Nouman
Ìý
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
fady toma
Ìý
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
Kashif ali muhammad
Ìý
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir
Ìý
Edwin b 1.baldelovar resume
Edwin b 1.baldelovar resumeEdwin b 1.baldelovar resume
Edwin b 1.baldelovar resume
Edwin Baldelovar
Ìý
CURRICULUM VITAE doc
CURRICULUM VITAE docCURRICULUM VITAE doc
CURRICULUM VITAE doc
prabu kanthasamy
Ìý
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
Eslam Mohamed
Ìý
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
barun dutta
Ìý

Alaa QA-QC last Applicant CV-2

  • 1. Curriculum Vitae Electrical Construction / Quality Department Alaa El-din Ahmed Mohamed Personal Details: Full Name: Alaa El-din Ahmed Mohamed Omer Date of Birth: (DD MMM YY) 27 January, 1971 Nationality: Egyptian Marital Status: Married Permanent Address: 794 Cornish El-Dekhela St., Alexandria, Egypt Temporary Address: Passport: Number: 536489 Country of Issue: (18) Alexandria Egypt Contact Details: Mobile #: 0100 6160 238 & 0127 3677 344 E-mail: Alaaahmed.mohamed@orascomci-projects.com Alaa.ahmedeng10@Yahoo.com Alaa.ahmedeng10@gmail.com Education: Primary Qualification: Level: 1. B.Sc., Electronic Engineer (Instrumentation & Control) Discipline: Electrical, Power Experiences Other Qualifications: Level: 1. 2. 3. Discipline: Continuing Professional Development: (Reverse chronological order, i.e. latest first) Dates (DD MMM YY) Courses From To Subject Provider June 1995 Sept. 1995 Modern Control System /Robotic Control System/Indu strial Electronic Faculty of Electronic Engineering June 1996 August 1996 Ac Motor Driver-Dc Motor Driver/ Measurement s /Power Electronic /Electrical Machine Faculty of Electronic Engineering November December Measurement Techniques and Methods for the Optimization of Solar Thermal Power Plants (CSP)" German Aerospace Center (DLR) in Plataforma Solar de Almeria (PSA) Spain As per the attached course cotenants December Cost of Quality Course Orascom Construction Industries Core Competencies: • Electrical, Power • Control, Instrumentation • As Built Drawings • QA/QC • Technical Support • Start Up, Operation, Maintenance Career Summary: (Reverse chronological order, i.e. latest first) Years Job Titles Employers PG/QMS/SF/012/00 CV Standard Format Page 1 of 7
  • 2. From (YYYY) To Duration (+/- 0.25 yr) 2013 Till (MEP) QA/QC Team Leader Engineer Orascom / Besix Joint Venture 2010 2013 20 Month Senior Electrical QA/QC& Construction Engineer Orascom / Besix Joint Venture 2008 2010 28 Month Senior Electrical, Control QA/QC& Construction Engineer Orascom / Besix Joint Venture 2007 2008 12 Month Senior Electrical Control, Instrumentations Commissioning Engineer Orascom / Besix Joint Venture 2005 2007 20 Month Instrumentation & Electrical Engineer Mitsubishi Heavy Industries Co. (Nagasaki) Japan 2004 2005 11 Month Instrumentation & Electrical Engineer Mitsubishi Heavy Industries Co. (Yokohama) Japan 2003 2004 7 Months Project Electrical and Control Construction Manager EMEC & ABB SUSA, INC. Co. 2001 2003 21 Month Electrical Manager Fast for Engineering Contracting Co. 2001 2001 4 Months Electrical Engineer Petrogas, Petromaint Co.’s 2001 2001 6 Months Electrical and Instrumentation Engineer Tarrad Co., Foster Weller Co. (French) 2000 2000 5 Months Instrumentation Supervisor Bechtel Corporation Co. (American) 1999 2000 16 Month Instrumentation Engineer Deasun, Samsung Co.’s (Korean) 1997 1997 5 Months Instrumentation Supervisor Petro jet Co. (Egyptian) Career History: Year From: 28/09/2013 Year To: Till now Job Title: (MEP) QA/QC Team Leader Engineer Employer: Orascom/Besix Project: - Grand Egyptian Museum Main Duties of my Role: • Supervised and supported suppliers, subcontractors to achieve project specification, inspection and testing requirements ITP’s • Supervised and performed the developments and execution of inspections and test plans for all permanent Electrical Works Embed and Expose items (Lighting, Lighting Control,UBS, Medium and Low Power Systems), Electromechanical Equipment’s (Elevators and Escalators/moving walks ,AHU, Boiler, Cooling system,…..Etc.) and Low Current Systems (Telephone, Fire Alarm and Voice Evacuation system, Security, Intruder Alarm, Access Control, ICT,CCTV,BMS, Refuge and Disabled , ,,, Etc.) • Reviewed all Electrical project procedures, Method of Statements and coordinate developments it’s to obtain the specific detailed procedures ,Specifications and also perform the supported to other departments onsite and offsite in accordance with the project requirements. • Implement the preventive and corrective actions to achieving the specified quality and testing requirements. • Supervised non-conformities reports NCR’s, Surveillance notes to achieve minimum entries through preventive actions. • Coordinate positively meetings between the Consultant, Orascom teams and subcontractors to meet with the quality requirements by the Client. • Managing the Inspection Test Plans for all Electrical work according to the scope of work prior to all Inspect each system,. • Managing and recording the Electrical quality documentation. • • • • PG/QMS/SF/012/00 CV Standard Format Page 2 of 7
  • 3. Career History: Year From: 01/11/2010 Year To: 30/07/2013 Job Title: Senior Electrical QA/QC& Construction Engineer Employer: Orascom/Besix Project: - Abo Qir Thermal Power Plant Project Main Duties of my Role: • Supervised and supported suppliers, subcontractors to achieve project specification, inspection and testing requirements ITP’s • Supervised and performed the developments and execution of inspections and test plans for all permanent Electrical, Control, Instrumentation and HVAC works. • Reviewed all Electrical project procedures and coordinate developments it’s to obtain the specific detailed procedures ,Specifications and also perform the supported to other departments onsite and offsite in accordance with the project requirements. • Implement the preventive and corrective actions to achieving the specified quality and testing requirements. • Supervised materials receiving inspections and prepared the MRR’s for all permanent Electrical materials and Equipments onsite and offsite, managed developments of a quality, construction and warehouse teams. • Communicated all Orascom departments’ requirements, procedures and forms and quality training to Orascom teams, suppliers and subcontractors and managed their effective implementation, • Supervised non-conformities reports NCR’s, Surveillance notes to achieve minimum entries through preventive actions. • Coordinate positively meetings with Orascom teams and subcontractors to meet with the quality requirements by the Client, Consultants. • Managing the punch lists for Electrical, HVAC work and closed out the possible items prior to all hand over systems, Prepare the Electrical and Electromechanical Turnover packages. • Managing and recording the quality documentation for hand over. Notable Achievements that I brought about in this role: Career History: Year From: 14/06/2008 Year To: 30/10/2010 Job Title: Senior Electrical, Control QA/QC& Construction Engineer Employer: Orascom/Besix Project: - Sidi Krir Power Station 2*750MW Combined Cycle Main Duties of my Role: • Supervised and supported suppliers, subcontractors to achieve project specification, inspection and testing requirements ITP’s. • Supervised and performed the developments and execution of inspections and test plans for all permanent electrical, Instrumentation and control works. • Reviewed all electrical project procedures and coordinate developments it’s to obtain the specific detailed procedures , also perform the supported to other departments onsite and offsite in accordance with the project requirements. • Implement the preventive and corrective actions to achieving the specified quality and testing requirements. • Supervised materials receiving inspections and prepared the MRR’s for all permanent electrical materials and equipments onsite and offsite, managed developments of a quality, construction and warehouse teams. • Communicated all Orascom departments’ requirements, procedures and forms and quality training to Orascom teams, suppliers and subcontractors and managed their effective implementation, • Supervised non-conformities reports NCR’s, Surveillance notes to achieve minimum entries through preventive actions. • Coordinate positively meetings with Orascom teams and subcontractors to meet with the quality requirements by the Client, Consultants. • Managing the punch lists for electrical work and closed out the possible items prior to all hand over systems, Prepare the Electrical and Electromechanical Turnover packages. • Managing and recording the quality documentation for hand over. Notable Achievements that I brought about in this role: • Working for quality and construction works in one time and complete my tasks perfectly. Year From: 27/03/2007 Year To: 12/03/2008 Job Title: Senior Electrical & Control Commissioning Engineer PG/QMS/SF/012/00 CV Standard Format Page 3 of 7
  • 4. Employer: General Electric, Orascom/Besix Project: - Sea Water Desalination Project, Hamma, Algeria Main Duties of my Role: • Check all instrumentation P&ID drawing with the received instruments, equipments and prepare site schedules for installations and test plan. • Installation all instrument devices such as panels, analyzers, flow, pressure, temperature, level instruments and air supply units including air lines , air bots ,sensing lines and their tests. • Instrumentation loop test between field instruments and SCADA control system. • Commissioning and testing for start up with calibrations of instruments, valves & loop check from filed to SCADA or PLC with preparing the related certificates and commissioning sheets. • Environmental monitoring & analysis system (series) SO2, O2, Dust, humidity analyser’s calibrations. • Optical fibre cables testing & power tester telecommunications and telephone exchange system commissioning. • Reporting to all Orascom departments and implement the coordination meetings to discuss construction progress and any required preventive actions for qualification works. Notable Achievements that I brought about in this role: • Because of my helping the handing over completed within the schedules time without any delay time and Orascom appreciated me through the top managers. Year From: 01/07/2005 Year To: 20/03/2007 Job Title: Instrumentation & Electrical Engineer Employer: Mitsubishi Heavy Industries ,Ltd( Nagasaki ) Project: - Nubaria Power I&II ,2*750MW Combined Cycle ( West Delta Power Generation Co. ) Main Duties of my Role: • Supervise all subcontractor teams for Erections and installations all instrumentation raceways, stanchions, trays, racks and supports........ Etc. • Supervise all subcontractor teams for Erections and installations all filed control junction boxes, panels, analysers, DCS consoles, printers, engineering work station, cabinets, detectors, transmitters( flow- pressure-level-temperature ), control switches, control valves, gauge’s and sensors ........etc. • Erection and adjustments all steam turbine supervisory instruments ( Bentley Nevada PLC ). • Supervise all subcontractor teams for Erections and installations the air supplies piping, tubing, hook up (s.s sensing lines) and pneumatic, hydro tests. • Supervise the cables laying, connection, terminations, and test of cables (Including the fibber optic cables). • Tests, calibrations, loop check, pre-commissioning and commissioning of systems. • Loop Energization and start up. Notable Achievements that I brought about in this role: • During the operation of the steam turbine i made analysis for some problems and successes for solving its. Year From: 10/07/2004 Year To: 10/06/2005 Job Title: Instrumentation & Electrical Engineer Employer: Mitsubishi Heavy Industries Ltd, Vinci Construction Grand’s Project:-Egyptian LNG, Idku, Egypt Main Duties of my Role: • Supervise all subcontractor teams for Erections and installations all Electrical & instrumentation raceways, stanchions, trays, racks and supports........ Etc. • Supervise all subcontractor teams for Erections and installations all filed control junction boxes, panels, analysers, cabinets, detectors, transmitters( flow-pressure-level-temperature ), control switches, control valves, gauge’s and sensors ........etc. • Supervise the Erection of all Lighting and power systems, Fire Alarm System, Air Craft Warning Light and grounding system. • Supervise all subcontractor teams for Erections and installations Gas Detectors, tubing, hook up ( s.s sensing lines ) and tests. • Supervise the Power and Instrumentation cables pulling, connection, terminations, and test of cables. • Implement the preventive and corrective actions to achieving the specified quality and testing requirements. • Tests, calibrations, loop check, pre-commissioning and commissioning of systems. • Loop Energization and start up. • Quality Inspections, prepared as built drawings. • Systems Hand Over. PG/QMS/SF/012/00 CV Standard Format Page 4 of 7
  • 5. • Notable Achievements that I brought about in this role: • N.A Year From: 01/09/2003 Year To: 20/02/2004 Job Title: Project Electrical and Control Construction Manager Employer: EMEC, ABB SUSA Project: - AGOSD East & West Treatment Plant, Alexandria Main Duties of my Role: • Check all instrumentation P&ID drawing with the received instruments, equipments and prepare site schedules for installations and test plan. Specially chlorination buildings. • Ensure that field purchased materials meet project requirements. • Supervise the Erection of all Lighting and power systems, Fire Alarm System, transformers, motor control centre panels, lightning protection, security systems and grounding system. • Supervise the Power and Instrumentation cables pulling, connection, terminations, and test of cables. • Supervise all subcontractor teams for Erections and installations all filed control junction boxes, panels, analysers, cabinets, detectors, transmitters( flow-pressure-level-temperature ), control switches, control valves, gauge’s and sensors ........etc. • Tests, calibrations, loop check, pre-commissioning and commissioning of systems. • Loop Energization and start up. Notable Achievements that I brought about in this role: • N.A Year From: 05/10/2001 Year To: 30/07/2003 Job Title: Electrical Manager Employer: Fast for Engineering & Contracting, Wady El-Nil for Contracting Project: -EGPC New Administration Building, Merghem, Alexandria Main Duties of my Role: • Adhere to the project drawings and specifications. • Ensure that field purchased materials meet project requirements. • Inspection as regards receiving, storage, installation, and performance and operational testing of electrical equipments, power systems, CCTV system, telephone system, fire protection system, public address, apparatus and related protective and control circuits. • Assigned field engineers to monitor and inspect the electrical and control systems. • Monitored all quality control documentation requirements and ensured that required reports are prepared, accepted, and filed in accordance with project procedures, review and approved changes to these procedures. • Fulfilled all safety and quality requirements pertaining to the work. • Directed the craft installing all electrical and control systems. • Evaluate shipping damage to electrical equipment and recommend corrective action. • Provide technical directions and monitor installation and pre-commissioning and commissioning tests. • Notify supervision and PFE when corrective action is required to correct any quality problems. • Notable Achievements that I brought about in this role: • N.A Year From: 05/06/2001 Year To: 30/09/2001 Job Title: Electrical Engineer Employer: Falcon Power System CO., Petromaint Co. Project: -Petrogas Plant–Wady El-Khmer Alexandria Main Duties of my Role: • Ensure that field purchased materials meet project requirements. Specially the (Explosion proof type EEX). • Inspection as regards receiving, storage, installation, and performance and operational testing of electrical equipments, power systems apparatus and related protective and control circuits. • Fulfilled all safety and quality requirements pertaining to the work. • Supervise the Erection of all normal & explosion proof Lighting, power and Earthing systems. • Tests and energized the systems. Notable Achievements that I brought about in this role: • N.A Year From: 01/01/2001 PG/QMS/SF/012/00 CV Standard Format Page 5 of 7
  • 6. Year To: 30/05/2001 Job Title: Electrical and Instrumentation Engineer in Wax Slap Moulding unit. Employer: Tarrad Co. , Foster Weller France Project: - Amoc Lube Oil Expansion Project, Alexandria Main Duties of my Role: • Supervise all subcontractor teams for Erections and installations all electrical & instrumentation raceways, stanchions, trays, racks and supports........ Etc. • Supervise all teams for Erections and installations all filed control junction boxes, panels, cabinets, detectors, transmitters (flow-pressure-level-temperature), control switches, control valves, gauges and sensors ........etc. • Supervise the cables pulling, connection, terminations, and test of cables. • Tests, calibrations, loop check, pre-commissioning and commissioning of systems. • Loop Energization and start up. Notable Achievements that I brought about in this role: • N.A Year From: 01/08/2000 Year To: 30/12/2000 Job Title: Instrumentation Supervisor Employer: Tarrad Co. , Bechtel Project: - Intergen Power Generation 3&4, Sidi Krir, Alexandria Main Duties of my Role: • Supervise all teams for Erections and installations all instrumentation raceways, stanchions, trays, racks and supports........ Etc. • Supervise all teams for Erections and installations all filed control junction boxes, panels, analysers, DCS consoles, printers, engineering work station, cabinets, detectors, transmitters( flow-pressure-level- temperature ), control switches, control valves, gauge’s fire alarm devices and cabinets........etc. • Supervise all teams for Erections and installations the tubing, hook up (s.s sensing lines) and pneumatic test. • Tests, calibrations, loop check, pre-commissioning and commissioning of systems. • Loop Energization and start up. Notable Achievements that I brought about in this role: • N.A Year From: 01/03/1999 Year To: 25/07/2000 Job Title: Instrumentation Engineer Employer: Deasun, Samsung Co.’s (Korean) Project: - 2000mt/y Polyethylene, Sidi Krir Petrochemicals Co. Egypt Main Duties of my Role: • Check all instrumentation P&ID drawing with the received instruments, equipments and prepare site schedules for installations and test plan. • Ensure that field purchased materials meet project requirements. • Inspection as regards receiving, storage, installation, and performance and operational testing of instrumentation equipments. • Supervise the Instrumentation cables pulling, connection, terminations, and test of cables. • Supervise all teams for Erections and installations all filed control junction boxes, panels, analysers, DCS consoles, printers, engineering work station, cabinets, detectors, transmitters( flow-pressure-level- temperature ), control switches, control valves, gauge’s , Analyzers and gas detectors........etc. • Tests, calibrations, loop check, pre-commissioning and commissioning of systems. • Loop Energization and start up. Notable Achievements that I brought about in this role: • N.A Year From: 20/06/1997 Year To: 10/11/1997 Job Title: Instrumentation Supervisor Employer: Petro jet Co. Gas Co. Project: - Gas Ras Ghareb, Red Sea, Egypt Main Duties of my Role: • Managing Erection of Instrumentation Raceways such as Trucking, Cable Trays, Racks, Conduits, etc • Review the design drawing and compared it’s with the received materials. • Supervise all teams for Erections and installations all filed control junction boxes, panels, analysers, termination cabinets, detectors, transmitters (flow-pressure-level-temperature), control switches, control valves, gauge’s ..........Etc. Notable Achievements that I brought about in this role: PG/QMS/SF/012/00 CV Standard Format Page 6 of 7
  • 7. • N.A PG/QMS/SF/012/00 CV Standard Format Page 7 of 7