際際滷

際際滷Share a Scribd company logo
Andrew LaGrone, P.E.
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
Objective To have a successful career in a leadership role in the project management,
construction management, or mining industry.
Professional Experience Sr. Project Manager February 2014  Present
Luminant, Martin Lake Mines
Responsible for the safe and compliant completion of all Capital and Special O&M
Construction Projects for all Martin Lake Mines.
 Responsible for numerous (5-10) projects at any given time ranging in budget
price from $25,000 to $2,000,000.
 Responsible for the overall safety of the project according to MSHA and OSHA
regulations. Ensure Safety is top priority. Utilize pre-job briefs and BBS
Observations as tools.
 Responsible for Environmental Compliance on each project per RCT, TCEQ,
and TxDOT regulations. 0 Notice of Violations during 3 year period. Perform
Project Evaluations during design and construction phase to ensure compliance
is met. Developed safety and environmental checklist as part of project initiation
phase that is now used company wide.
 Spend significant amount of time in the field having construction oversight on
each project. Certify project was built according to plans. Perform As-Builts for
each project.
 Design of haul roads, diversions, ponds and other various civil projects.
 Strive to ensure scope, schedule, and budget are on track for each project.
Have not had a major lapse on any project to date.
 Work closely with contractors and have excellent communication skills with
contractors to ensure job is completed in a safe manner, compliant, on
schedule, and within the budget.
 Utilize experienced resources to ensure a job is completed correctly and
efficiently.
 Develop detailed engineering estimates.
 Work through procurement to develop and conduct pre-bid meetings and pre-
construction meetings.
 Develop technical specifications to be included with detailed design plans used
in the bid process.
 Process contractor pay requests and change orders when necessary.
 Utilize Maximo software to create and manage work orders.
 Currently lead the Martin Lake Impoundment Inspection team to ensure all 250+
ponds at Martin Lake get inspected on time in order to stay compliant with RCT,
TCEQ and MSHA.
 Perform inspections on embankment ponds according to RCT, TCEQ and
MSHA requirements.
 Played a vital role in implementing Program Management Office (PMO) at the
Martin Lake Mines. This brought all stakeholders together to achieve a common
goal.
Mine Planning Supervisor September 2012  February 2014
Luminant, Tatum Mine
Responsible for the overall Mine Planning at the Tatum Mine. (Surveying, Environmental,
Short & Long Range Planning, Environmental Compliance, and Reclamation Planning)
 Maintained a proactive attitude towards safety and ensured employees are
comfortable with their working conditions through the HPI and BBS processes.
 Ensured safe operations of contractors building ponds, structures, etc. by using
pre job briefs and BBS observations
 Completed Project Evaluation Forms to ensure safety and environmental
compliance on every project at the mine site.
 Designed haul roads, pipe/culvert sizing, pit sequencing, ground control plans
etc.
 Compiled AutoCAD maps and used 3D Dig to ensure compliance and to make
operations and productivity more efficient.
 Developed (through sound engineering) and ensure execution (operationally, by
having a presence in the field) of ground control plans against old mined out
works. This included range diagrams, pit sequencing, etc.
 Ensured environmental compliance and have achieved 0 NOVs in the 1.5 years
I was in the role.
 Improved standardization and efficiency of mine planning process throughout
Martin Lake Complex.
 PE Exam Passed 10/25/13
Associate Engineer/Mine Planning Engineer April 2011- Sep. 2012
Luminant, Oak Hill and Tatum Mine
Responsible for surveying, red dirt planning, and dragline planning.
 Compiled daily reports and performed misc. survey jobs
 Red Dirt Planning  Compiled monthly mass balance for RCT approval and for
operations needs as required
 Mine Planning  Compiled weekly plan projections, 30-60-90 projections, misc.
AutoCAD and Carlson projects and end of week reports
 Operations - Rode around frequently with mine manager, operations manager
and operations foreman to ensure plan was accurate and to learn the operation
of mine and the procedures for correct supervising.
Intern/Civil Engineer/Project Manager May 2007-April 2011
Gary Burton Engineering, Tyler, TX
Aug. 2006  May 2010 attended UT-Tyler  Worked 20hrs/wk and 16 credit hours
Project Engineering
 Designed public water and sewer systems
 Prepared contract documents and technical specifications
 Prepared drawings, permits and documents for regulatory agency approvals
 Prepared Emergency Action Plans for various sized dams
 Conducted field surveying with total station
 Construction Administration
 Assisted in coordination issues of work authorization and documentation
including change orders, design drawings, and as-built drawings
 Prepared, verified and/or updated pay requests and cost estimates
 Oversaw construction on water/sewer lines and water treatment plants
 Proficient in Microsoft Office products and AutoCAD
Andrew LaGrone
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
Maintenance Worker May 2003-May 2007
Henderson ISD, Henderson, TX - Attended Henderson High School during this time
 Groundskeeper
 Assembled and repaired equipment
 Performed electrical work
Education/Certification
s
Professional Engineering Licensure PE 115819 December 2013
University of Texas at Tyler August 2006-May 2010
Bachelor of Science in Civil Engineering
 Affiliations
 Texas Society of Professional Engineers  2013 - Current
 ASCE Associate member 2011
 ASCE, Student Chapter  Media Officer, 2009
 American Institute of Steel Construction, Student Chapter, 2008
 ASCE Concrete Canoe Competition  2007-2009
 Continuing Education/Training
 2016  MSHA Impoundment Inspector  Certified Instructor of Course
 2016  Navarro College  Evaluating High Pressure, High Temperature
and Horizontal Oil Wells and Gas wells.
 2016  Johnson and Pace  HEC-RAS 2D Modeling
Demonstration/Training Session
 2015  MSHA Impoundment Inspector  Certified Instructor of Course
 2014  MSHA Impoundment Inspector Training  Certified Inspector
 2014  OSHA Trenching and Shoring Safety
 2013  Surface Certification
 2011-Water and Wastewater Equipment Technology  TSPE
 2010-Dam Safety Workshop - TCEQ
 2010-Section Biannual Seminar - NE-WEAT
 2010-Back to Basics  TX-AWWA
 2010-Manhole Rehab Workshop  Standard Cement Materials, Inc.
 2010-Pipeline Emergency Response / Damage Prevention (Paradigm)
 2010  Engineering Expo, Ethics (Kilgore College)
Kilgore Junior College June 2005  May 2006
Received Academic Scholarship to attend
Henderson High School August 2001- May 2005
Software Training 3D Dig 2012 Dragline Simulation Training
Civil 3D 2015 Training
Carlson 2015 Training
3D Dig 2000 Dragline Simulation Training
AutoCAD Map 3D 2015 Training
Andrew LaGrone
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
Andrew LaGrone
1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com

More Related Content

What's hot (20)

Ryan Arendse
Ryan ArendseRyan Arendse
Ryan Arendse
Ryanarendse
Steven Vukusic Resume
Steven Vukusic ResumeSteven Vukusic Resume
Steven Vukusic Resume
Steven Vukusic
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
Mike Syslak
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
Christopher Doran
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
Leo Rosario
2016 CBresume
2016 CBresume2016 CBresume
2016 CBresume
Christopher A. Boehm
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
Jose Muraira
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...
Azhar Niazi
Paul Lazarine Resume 10-24-2014
Paul Lazarine Resume 10-24-2014Paul Lazarine Resume 10-24-2014
Paul Lazarine Resume 10-24-2014
Paul Lazarine lazarine
U pdated resume #7.pdf
U pdated resume #7.pdfU pdated resume #7.pdf
U pdated resume #7.pdf
Sonny Daigrepont
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
Chuck Shealy
Pete day resume 8 2010
Pete day resume 8 2010Pete day resume 8 2010
Pete day resume 8 2010
Pete Day
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
Jeevanantham Santha Kumar
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
Steve McClimon
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUARCV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
WAN MUHAMMAD ISA WAN AHMAD ANUAR
Project Experience
Project ExperienceProject Experience
Project Experience
Richard Dixon
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
andrew wellbelove
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
Midel Dalangin
Steven Vukusic Resume
Steven Vukusic ResumeSteven Vukusic Resume
Steven Vukusic Resume
Steven Vukusic
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
andi dipayadnya
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
Mike Syslak
Chris doran resume 03 08-16
Chris doran resume 03 08-16Chris doran resume 03 08-16
Chris doran resume 03 08-16
Christopher Doran
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
Leo Rosario
Jose J Muraira LATEST Resume
Jose J  Muraira LATEST ResumeJose J  Muraira LATEST Resume
Jose J Muraira LATEST Resume
Jose Muraira
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...
Azhar Niazi
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
Chuck Shealy
Pete day resume 8 2010
Pete day resume 8 2010Pete day resume 8 2010
Pete day resume 8 2010
Pete Day
Project Experience
Project ExperienceProject Experience
Project Experience
Richard Dixon
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr
Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1Andrew_Wellbelove's_CV_July_2016_ doc_a1
Andrew_Wellbelove's_CV_July_2016_ doc_a1
andrew wellbelove
MIDEL C resume013[1]
MIDEL C resume013[1]MIDEL C resume013[1]
MIDEL C resume013[1]
Midel Dalangin

Similar to Andrew LaGrone Resume (20)

Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
Ray Freiha
LONNIE L
LONNIE LLONNIE L
LONNIE L
Lonnie Burnside
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
Rodney Taylor
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
saieq
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR
Assarpour_Amir
Assarpour_AmirAssarpour_Amir
Assarpour_Amir
Amir Assarpour, PE
Resume of Christian Kuhasz
Resume of Christian KuhaszResume of Christian Kuhasz
Resume of Christian Kuhasz
Christian Kuhasz
Erica Anderson Resume
Erica Anderson ResumeErica Anderson Resume
Erica Anderson Resume
Erica Hein
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
Dinesh Kumar
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
Hairi Mohd Noor
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
Shahul Machan ilayankudi
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
Jack Oldrin
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
Richard Callueng
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Andi Aris
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
Waqar Hussain
redacvEPT
redacvEPTredacvEPT
redacvEPT
Reda Fathallah
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
Terry Barwick
Z-FEBresume
Z-FEBresumeZ-FEBresume
Z-FEBresume
David Zimmer
Mike C LeBlanc REV3
Mike C LeBlanc REV3Mike C LeBlanc REV3
Mike C LeBlanc REV3
Michael LeBlanc
21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE
Simon Norton
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
Ray Freiha
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
Rodney Taylor
Resume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / ScheduleResume - Senior Projects Planner / Schedule
Resume - Senior Projects Planner / Schedule
saieq
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR
Resume of Christian Kuhasz
Resume of Christian KuhaszResume of Christian Kuhasz
Resume of Christian Kuhasz
Christian Kuhasz
Erica Anderson Resume
Erica Anderson ResumeErica Anderson Resume
Erica Anderson Resume
Erica Hein
Hairi Mohd Noor_Resume
Hairi Mohd Noor_ResumeHairi Mohd Noor_Resume
Hairi Mohd Noor_Resume
Hairi Mohd Noor
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
Jack Oldrin
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Andi Aris
Waqar Hussain Mechanical Engineer
Waqar Hussain Mechanical EngineerWaqar Hussain Mechanical Engineer
Waqar Hussain Mechanical Engineer
Waqar Hussain
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
Terry Barwick
21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE21-06-16_SIMON CURRICULUM VITAE
21-06-16_SIMON CURRICULUM VITAE
Simon Norton

Andrew LaGrone Resume

  • 1. Andrew LaGrone, P.E. 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com Objective To have a successful career in a leadership role in the project management, construction management, or mining industry. Professional Experience Sr. Project Manager February 2014 Present Luminant, Martin Lake Mines Responsible for the safe and compliant completion of all Capital and Special O&M Construction Projects for all Martin Lake Mines. Responsible for numerous (5-10) projects at any given time ranging in budget price from $25,000 to $2,000,000. Responsible for the overall safety of the project according to MSHA and OSHA regulations. Ensure Safety is top priority. Utilize pre-job briefs and BBS Observations as tools. Responsible for Environmental Compliance on each project per RCT, TCEQ, and TxDOT regulations. 0 Notice of Violations during 3 year period. Perform Project Evaluations during design and construction phase to ensure compliance is met. Developed safety and environmental checklist as part of project initiation phase that is now used company wide. Spend significant amount of time in the field having construction oversight on each project. Certify project was built according to plans. Perform As-Builts for each project. Design of haul roads, diversions, ponds and other various civil projects. Strive to ensure scope, schedule, and budget are on track for each project. Have not had a major lapse on any project to date. Work closely with contractors and have excellent communication skills with contractors to ensure job is completed in a safe manner, compliant, on schedule, and within the budget. Utilize experienced resources to ensure a job is completed correctly and efficiently. Develop detailed engineering estimates. Work through procurement to develop and conduct pre-bid meetings and pre- construction meetings. Develop technical specifications to be included with detailed design plans used in the bid process. Process contractor pay requests and change orders when necessary. Utilize Maximo software to create and manage work orders. Currently lead the Martin Lake Impoundment Inspection team to ensure all 250+ ponds at Martin Lake get inspected on time in order to stay compliant with RCT, TCEQ and MSHA. Perform inspections on embankment ponds according to RCT, TCEQ and MSHA requirements. Played a vital role in implementing Program Management Office (PMO) at the Martin Lake Mines. This brought all stakeholders together to achieve a common goal. Mine Planning Supervisor September 2012 February 2014 Luminant, Tatum Mine Responsible for the overall Mine Planning at the Tatum Mine. (Surveying, Environmental,
  • 2. Short & Long Range Planning, Environmental Compliance, and Reclamation Planning) Maintained a proactive attitude towards safety and ensured employees are comfortable with their working conditions through the HPI and BBS processes. Ensured safe operations of contractors building ponds, structures, etc. by using pre job briefs and BBS observations Completed Project Evaluation Forms to ensure safety and environmental compliance on every project at the mine site. Designed haul roads, pipe/culvert sizing, pit sequencing, ground control plans etc. Compiled AutoCAD maps and used 3D Dig to ensure compliance and to make operations and productivity more efficient. Developed (through sound engineering) and ensure execution (operationally, by having a presence in the field) of ground control plans against old mined out works. This included range diagrams, pit sequencing, etc. Ensured environmental compliance and have achieved 0 NOVs in the 1.5 years I was in the role. Improved standardization and efficiency of mine planning process throughout Martin Lake Complex. PE Exam Passed 10/25/13 Associate Engineer/Mine Planning Engineer April 2011- Sep. 2012 Luminant, Oak Hill and Tatum Mine Responsible for surveying, red dirt planning, and dragline planning. Compiled daily reports and performed misc. survey jobs Red Dirt Planning Compiled monthly mass balance for RCT approval and for operations needs as required Mine Planning Compiled weekly plan projections, 30-60-90 projections, misc. AutoCAD and Carlson projects and end of week reports Operations - Rode around frequently with mine manager, operations manager and operations foreman to ensure plan was accurate and to learn the operation of mine and the procedures for correct supervising. Intern/Civil Engineer/Project Manager May 2007-April 2011 Gary Burton Engineering, Tyler, TX Aug. 2006 May 2010 attended UT-Tyler Worked 20hrs/wk and 16 credit hours Project Engineering Designed public water and sewer systems Prepared contract documents and technical specifications Prepared drawings, permits and documents for regulatory agency approvals Prepared Emergency Action Plans for various sized dams Conducted field surveying with total station Construction Administration Assisted in coordination issues of work authorization and documentation including change orders, design drawings, and as-built drawings Prepared, verified and/or updated pay requests and cost estimates Oversaw construction on water/sewer lines and water treatment plants Proficient in Microsoft Office products and AutoCAD Andrew LaGrone 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
  • 3. Maintenance Worker May 2003-May 2007 Henderson ISD, Henderson, TX - Attended Henderson High School during this time Groundskeeper Assembled and repaired equipment Performed electrical work Education/Certification s Professional Engineering Licensure PE 115819 December 2013 University of Texas at Tyler August 2006-May 2010 Bachelor of Science in Civil Engineering Affiliations Texas Society of Professional Engineers 2013 - Current ASCE Associate member 2011 ASCE, Student Chapter Media Officer, 2009 American Institute of Steel Construction, Student Chapter, 2008 ASCE Concrete Canoe Competition 2007-2009 Continuing Education/Training 2016 MSHA Impoundment Inspector Certified Instructor of Course 2016 Navarro College Evaluating High Pressure, High Temperature and Horizontal Oil Wells and Gas wells. 2016 Johnson and Pace HEC-RAS 2D Modeling Demonstration/Training Session 2015 MSHA Impoundment Inspector Certified Instructor of Course 2014 MSHA Impoundment Inspector Training Certified Inspector 2014 OSHA Trenching and Shoring Safety 2013 Surface Certification 2011-Water and Wastewater Equipment Technology TSPE 2010-Dam Safety Workshop - TCEQ 2010-Section Biannual Seminar - NE-WEAT 2010-Back to Basics TX-AWWA 2010-Manhole Rehab Workshop Standard Cement Materials, Inc. 2010-Pipeline Emergency Response / Damage Prevention (Paradigm) 2010 Engineering Expo, Ethics (Kilgore College) Kilgore Junior College June 2005 May 2006 Received Academic Scholarship to attend Henderson High School August 2001- May 2005 Software Training 3D Dig 2012 Dragline Simulation Training Civil 3D 2015 Training Carlson 2015 Training 3D Dig 2000 Dragline Simulation Training AutoCAD Map 3D 2015 Training Andrew LaGrone 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com
  • 4. Andrew LaGrone 1514 Rayford Road, Henderson, TX, 75654, 903-806-0807, Andy.LaGrone@yahoo.com