Humansdorp Sewage Treatment
          Works

                  Congested Clarifier
                    before dosing
                     commenced



                      2 Weeks after
                      dosing started
Humansdorp Sewage Treatment
          Works



                     4 Weeks after
                     dosing started
Avantu Successes -
Bethal STW- Mpumalanga
Avantu Successes -
Bethal STW - Mpumalanga
Avantu Successes -
Bethal STW - Mpumalanga

                    4 weeks after
                    dosing started
Avantu Successes -
Francistown STW - Botswana
Avantu Successes -
Francistown STW - Botswana

                     2 weeks after
                     dosing started
Gaansbaai 
anaerobic sludge pond
                  Day dosing started




                     2 weeks after
                     dosing started
Avantu Successes -
Kwa Maritane - Pilanesberg
Avantu Successes -
Kwa Maritane - Pilanesberg
                      2 weeks after
                      dosing started
Bethal Pump Station 1
                              Mpumalanga                                            case study




                                                                                   3 days after dosing commenced
Pump Station crisis caused by stolen electrical cable




                                                              10 days after dosing commenced the 7m of Solids were liquefied
   Raw sewerage flowing into river




                                                        The pump was switched on and the pump station is functional again
      Congested pump well
Bethal Pump Station 2
                               Mpumalanga                                          case study




Pump Station crisis caused by stolen electrical cable                      Dosing commenced




  Congested well and flow to the pump                          7 days after dosing commenced




       Bioaugmentation of the product                   The pump well is totally functional again
UMTATA CENTRAL PRISON PONDS &
                  PUBLIC WORKS - CASE STUDY
                          .

           By using Avantu Bioaugmentation Public Works reduced their
                 sewerage maintenance costs by 60% (refer letter)




               A. Dosing started March 2003




                   D. July/August 2003
The bioaugmentation section of the 2005 Public Works
SAPS tender was based on Avantu products
 Public Works Water Management & Chemical Laboratories
have recommended Pitking and Fatking for sewerage
rectification, September 2004
NKANDLA PUMP STATIONS

      Faecal Coliform Analysis Results
Pump Station 1
11/01/06                1 720 000/100ml (cfu)
18/01/06                   86 000/100ml (cfu) 95% reduction in 1 week
31/01/06                    3 000/100ml (cfu) further 96.5% reduction on 18/01/06
Pump Station 2
11/01/06                   90 500/100ml (cfu)
18/01/06                    5 000/100ml (cfu) 94,4% reduction in 1 week
31/01/06                    3 000/100ml (cfu) further 78% reduction on 18/01/06
Pump Station 3
11/01/06                    91 000/100ml (cfu)
18/01/06                       197/100ml (cfu) 99.7% reduction in 1 week
31/01/06                    53 000/100ml (cfu) increase due to more repairs being done
on the pump resulting in another sewerage spill occurring and Avantu started the
bioaugmentation rectification process on the 13/02/06
SEKORORO HOSPITAL SEWERAGE PONDS  Continued
                   Effluent analysis
AVANTU
 15 years of Research & Development,
 Testing and Proven Formulae
 Successful Testing in Sub-Saharan   Africa

   Uganda Government Laboratory                        Ministries of Justice, Defence, Health
   University of Pretoria SA                            and Education  Burundi
   Provincial and National Public Works SA             Lake Victoria Environmental Authority
   Water Affairs SA                                    Department of Fisheries  Kenya
   Blantyre and Lilongwe City Councils  Malawi        Centurion Wastewater works - SA
   Gecamines and Kinshasa City Council, DR of Congo    KZN Department of Health  on
   KG Hospital: Democratic Republic of Congo            cholera control
   University of Uganda                                KZN Department of Works & Education 
   Ministry of Health in Zambia                         on pit toilets decongesting
   Environmental Council of Zambia                     Product approved by the Environmental
   Lusaka City Council of Zambia                        Protection Agency, USA
DWAFs acceptance of Avantus
     bioaugmentation
There is no bad bacteria blend

The only problem is a blend of
 bacteria being used for the
     wrong application
Specifications for Bio Augmentation
  in the Draft 4 DWAF Document
 Product blend must be a selection of harmless bacteria

 The bacteria blend must have been developed specifically
  for the South African sewage problems

 The BioProducts must have been used successfully for over
  5 years in SA and tested by reputable organisations

 The BioProducts must eradicate waterborne diseases
  including cholera

 The BioProducts should contain some form of malaria &
  waterborne disease control
Kenya Must Make a
   Sustainable Difference by:
Saving Cost
Pushing Back The Frontiers of Poverty
Rectifying Sewerage Problems
Creating Jobs
Restoring Dignity
Preventing Waterborne Diseases

Reducing Health Risks & Saving Lives !
 Creating a cleaner, healthier environment
Thank You

More Related Content

Avantu presentation 3

  • 2. Humansdorp Sewage Treatment Works Congested Clarifier before dosing commenced 2 Weeks after dosing started
  • 3. Humansdorp Sewage Treatment Works 4 Weeks after dosing started
  • 4. Avantu Successes - Bethal STW- Mpumalanga
  • 5. Avantu Successes - Bethal STW - Mpumalanga
  • 6. Avantu Successes - Bethal STW - Mpumalanga 4 weeks after dosing started
  • 8. Avantu Successes - Francistown STW - Botswana 2 weeks after dosing started
  • 9. Gaansbaai anaerobic sludge pond Day dosing started 2 weeks after dosing started
  • 10. Avantu Successes - Kwa Maritane - Pilanesberg
  • 11. Avantu Successes - Kwa Maritane - Pilanesberg 2 weeks after dosing started
  • 12. Bethal Pump Station 1 Mpumalanga case study 3 days after dosing commenced Pump Station crisis caused by stolen electrical cable 10 days after dosing commenced the 7m of Solids were liquefied Raw sewerage flowing into river The pump was switched on and the pump station is functional again Congested pump well
  • 13. Bethal Pump Station 2 Mpumalanga case study Pump Station crisis caused by stolen electrical cable Dosing commenced Congested well and flow to the pump 7 days after dosing commenced Bioaugmentation of the product The pump well is totally functional again
  • 14. UMTATA CENTRAL PRISON PONDS & PUBLIC WORKS - CASE STUDY . By using Avantu Bioaugmentation Public Works reduced their sewerage maintenance costs by 60% (refer letter) A. Dosing started March 2003 D. July/August 2003 The bioaugmentation section of the 2005 Public Works SAPS tender was based on Avantu products Public Works Water Management & Chemical Laboratories have recommended Pitking and Fatking for sewerage rectification, September 2004
  • 15. NKANDLA PUMP STATIONS Faecal Coliform Analysis Results Pump Station 1 11/01/06 1 720 000/100ml (cfu) 18/01/06 86 000/100ml (cfu) 95% reduction in 1 week 31/01/06 3 000/100ml (cfu) further 96.5% reduction on 18/01/06 Pump Station 2 11/01/06 90 500/100ml (cfu) 18/01/06 5 000/100ml (cfu) 94,4% reduction in 1 week 31/01/06 3 000/100ml (cfu) further 78% reduction on 18/01/06 Pump Station 3 11/01/06 91 000/100ml (cfu) 18/01/06 197/100ml (cfu) 99.7% reduction in 1 week 31/01/06 53 000/100ml (cfu) increase due to more repairs being done on the pump resulting in another sewerage spill occurring and Avantu started the bioaugmentation rectification process on the 13/02/06
  • 16. SEKORORO HOSPITAL SEWERAGE PONDS Continued Effluent analysis
  • 17. AVANTU 15 years of Research & Development, Testing and Proven Formulae Successful Testing in Sub-Saharan Africa Uganda Government Laboratory Ministries of Justice, Defence, Health University of Pretoria SA and Education Burundi Provincial and National Public Works SA Lake Victoria Environmental Authority Water Affairs SA Department of Fisheries Kenya Blantyre and Lilongwe City Councils Malawi Centurion Wastewater works - SA Gecamines and Kinshasa City Council, DR of Congo KZN Department of Health on KG Hospital: Democratic Republic of Congo cholera control University of Uganda KZN Department of Works & Education Ministry of Health in Zambia on pit toilets decongesting Environmental Council of Zambia Product approved by the Environmental Lusaka City Council of Zambia Protection Agency, USA
  • 18. DWAFs acceptance of Avantus bioaugmentation
  • 19. There is no bad bacteria blend The only problem is a blend of bacteria being used for the wrong application
  • 20. Specifications for Bio Augmentation in the Draft 4 DWAF Document Product blend must be a selection of harmless bacteria The bacteria blend must have been developed specifically for the South African sewage problems The BioProducts must have been used successfully for over 5 years in SA and tested by reputable organisations The BioProducts must eradicate waterborne diseases including cholera The BioProducts should contain some form of malaria & waterborne disease control
  • 21. Kenya Must Make a Sustainable Difference by: Saving Cost Pushing Back The Frontiers of Poverty Rectifying Sewerage Problems Creating Jobs Restoring Dignity Preventing Waterborne Diseases Reducing Health Risks & Saving Lives ! Creating a cleaner, healthier environment