The document appears to be a presentation about a bioaugmentation product called Avantu. It includes before and after photos of sewage treatment works and pump stations showing reductions in sludge and improvements after dosing started with Avantu. It also includes case studies on successes with Avantu at various locations in reducing sewerage maintenance costs and levels of faecal coliform. The presentation promotes Avantu as having 15 years of research and proven formulae for successfully treating sewage problems across Africa. It provides specifications for bioaugmentation and argues Kenya can make a sustainable difference by using such products to address sewerage issues.
12. Bethal Pump Station 1
Mpumalanga case study
3 days after dosing commenced
Pump Station crisis caused by stolen electrical cable
10 days after dosing commenced the 7m of Solids were liquefied
Raw sewerage flowing into river
The pump was switched on and the pump station is functional again
Congested pump well
13. Bethal Pump Station 2
Mpumalanga case study
Pump Station crisis caused by stolen electrical cable Dosing commenced
Congested well and flow to the pump 7 days after dosing commenced
Bioaugmentation of the product The pump well is totally functional again
14. UMTATA CENTRAL PRISON PONDS &
PUBLIC WORKS - CASE STUDY
.
By using Avantu Bioaugmentation Public Works reduced their
sewerage maintenance costs by 60% (refer letter)
A. Dosing started March 2003
D. July/August 2003
The bioaugmentation section of the 2005 Public Works
SAPS tender was based on Avantu products
Public Works Water Management & Chemical Laboratories
have recommended Pitking and Fatking for sewerage
rectification, September 2004
15. NKANDLA PUMP STATIONS
Faecal Coliform Analysis Results
Pump Station 1
11/01/06 1 720 000/100ml (cfu)
18/01/06 86 000/100ml (cfu) 95% reduction in 1 week
31/01/06 3 000/100ml (cfu) further 96.5% reduction on 18/01/06
Pump Station 2
11/01/06 90 500/100ml (cfu)
18/01/06 5 000/100ml (cfu) 94,4% reduction in 1 week
31/01/06 3 000/100ml (cfu) further 78% reduction on 18/01/06
Pump Station 3
11/01/06 91 000/100ml (cfu)
18/01/06 197/100ml (cfu) 99.7% reduction in 1 week
31/01/06 53 000/100ml (cfu) increase due to more repairs being done
on the pump resulting in another sewerage spill occurring and Avantu started the
bioaugmentation rectification process on the 13/02/06
17. AVANTU
15 years of Research & Development,
Testing and Proven Formulae
Successful Testing in Sub-Saharan Africa
Uganda Government Laboratory Ministries of Justice, Defence, Health
University of Pretoria SA and Education Burundi
Provincial and National Public Works SA Lake Victoria Environmental Authority
Water Affairs SA Department of Fisheries Kenya
Blantyre and Lilongwe City Councils Malawi Centurion Wastewater works - SA
Gecamines and Kinshasa City Council, DR of Congo KZN Department of Health on
KG Hospital: Democratic Republic of Congo cholera control
University of Uganda KZN Department of Works & Education
Ministry of Health in Zambia on pit toilets decongesting
Environmental Council of Zambia Product approved by the Environmental
Lusaka City Council of Zambia Protection Agency, USA
19. There is no bad bacteria blend
The only problem is a blend of
bacteria being used for the
wrong application
20. Specifications for Bio Augmentation
in the Draft 4 DWAF Document
Product blend must be a selection of harmless bacteria
The bacteria blend must have been developed specifically
for the South African sewage problems
The BioProducts must have been used successfully for over
5 years in SA and tested by reputable organisations
The BioProducts must eradicate waterborne diseases
including cholera
The BioProducts should contain some form of malaria &
waterborne disease control
21. Kenya Must Make a
Sustainable Difference by:
Saving Cost
Pushing Back The Frontiers of Poverty
Rectifying Sewerage Problems
Creating Jobs
Restoring Dignity
Preventing Waterborne Diseases
Reducing Health Risks & Saving Lives !
Creating a cleaner, healthier environment