SOUTH BULLER LAND OWNERS GROUP
77 Ha
SBLOG - BDZ PLANNING PROCESS
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
Road noise...
Commercial ?
best views
Quiet building design?
Detailed area plan with lot layout
(talk to DoP, how to maximize
yield)
Road location to give
buffer to tourism
(areas?) approved
Tourism / Housing. Large lots
(4 lots per lot)
1500m2 - 2000m2
Any school site
should go here.
Carpark & small shops to align
with coastal hub
Hwy access to service
pre-approved was an
“island” created by
conservation area
Meander road
behind houses
Large
conservation
lots
(as small
as possible)
Large
lots
Res.
HD
Will drop density to avoid
school & infrastructure.
(staged 2,000m to smaller
when sewer goes through)
Workshop Notes by GHD
consultant for SBLOG Area
NORTH
BDZ GHD Structure Plan
BDZ GHD Structure Plan
BDZ GHD Structure Plan
SBLOG - Revised Concept Plan - 22th
Nov.
Realignment of the
Neighbourhood Connector to
the base of the secondary
dunes along the edge of the
clay flats avoids overlooking
and assists drainage.
Hybrid R5/CZ Residential lots
with building envelopes in the
green zone for land with
ocean views.
Suggest a service road
realigned that would reclaim
some of the most valuable
near beach land on Lot 10
and Lot 1891. Views up and
down the coast would be
possible if the Service road
could follow the 98m coastal
setback line as shown here.
In exchange for the use of
some of the existing coastal
POS with best views, a strip
of the clay flats adjacent the
Connector road to be used
for POS that will form a visual
backbone for the entire
SBLOG area.
POS
Access to NWCH located
on the boundary of Lot 9
& 10.
If the northern part of BDZ
was slow to develop, this
service road could be
extended down the hill to
meet the Neighbourhood
Connector and hence
form a fire escape for
residents in the SBLOG.
Swale
Vegetation
Service road on Lots 8, 7 &
9 realigned approx 75m to
100m from NWCH to
create 4 or 5 x 2,000m2
lots per existing Lot
Hybrid R5/CZ lots created
with a mix of R5 land and
lower density conservation
/ residential land. This
enables 3 or more lots
across each exising lot.
More flexible & easier to
incorporate existing
buildings.
Hybrid R5/CZ Residential /
Tourism lots with building
envelopes on the West area
(shown green) to be created
with a mix of R5 land and
lower density CZ residential
land.
This enables 20m to 30m lot
width.
CZ
R5 R5
R5R5R5R5
R5 R5
POS
Drainage
& POS
CZ R5
Service Road to be
realigned for better yield.
This area NOT be R15 but
low density (R5) to avoid
the need for sewer/
school/shopping precinct
etc
R5
POS to cover the area of
Swale Sea Heath
mentioned in TPS 2 on Lots
7 & 9. Counts towards the
10% POS contribution
needed for Lots 8,7,9 &10.
Coastal Node
Pedestrian/cycle Path
along existing sand track
Pedestrian/cycle Path
along edge of POS
R5
POS
CZ
Agree with GHD entry point
for NC road but intersection
will need detailed design
input as existing road is a
wide radius curve.
R5
BDZ GHD Structure Plan
SBLOG - Revised Concept Plan - 22nd March
2014
Realignment of the
Neighbourhood Connector to
the base of the secondary
dunes along the edge of the
clay flats avoids overlooking
and assists drainage.
R5+ Residential lots.
Lots larger than 2,000m2
with excellent panoramic
views
Service Road approximately
follows the 98m coastal
setback line.
Clay Flats suggested as POS
with final area determined by
drainage and clarity around
how much of the coastal POS
will count towards land owner
contributions. Clay flats
adjacent the Connector road
to be used for POS that will
form a visual backbone for
the entire SBLOG area.
POS
Access to NWCH located
on the boundary of Lot 9
& 10.
Alternative fire escape for
residents in SBLOG.
Swale
Vegetation
Service road on Lots 8, 7 &
9 realigned approx 75m to
100m from NWCH to
create 1,000 to 2,000m2
lots depending on views
and existing infrastructure
Hybrid R5/CZ lots created
with a mix of R5 land and
lower density conservation
/ residential land. This
enables 3 or more lots
across each exising lot.
More flexible & respects
existing buildings and
infrastructure.
Hybrid R5/CZ Residential
lots with building envelopes
that generally align with
existing DA footprints
This enables 20m to 30m lot
width.
CZ
R5+
R5
or
R10
R5R5R5
R5
R10
POS
R5
This area R10. Elevated
lots will have ocean views
down roads
R10
&
R5
POS to cover the area of
Swale Sea Heath
mentioned in TPS 2 on Lots
7 & 9. Counts towards the
10% POS contribution
needed for Lots 7,9 &10.
POS north of the Swale
area may be reduced
subject to clarity around
Coastal Reserve and/or
POS calculations.
Coastal Node
Pedestrian/cycle Path
along existing sand track
Pedestrian/cycle Path
R5
POS
Southern section of the NC
road excavated to approx 4-
5m level and sand used to
raise adjacent lots East of
the NC road to enhance
view lines
R5
R5
R10
R10
R10
R10
R5
R5R5
SBLOG - Revised Concept Plan - 24th March
2014
Realignment of the
Neighbourhood Connector to
the base of the secondary
dunes along the edge of the
clay flats avoids overlooking
and assists drainage.
R5+ Residential lots.
Lots larger than 2,000m2
with excellent panoramic
views
Service Road approximately
follows the 98m coastal
setback line.
Clay Flats suggested as POS
with final area determined by
drainage and clarity around
how much of the coastal POS
will count towards land owner
contributions. Clay flats
adjacent the Connector road
to be used for POS that will
form a visual backbone for
the entire SBLOG area.
POS
Access to NWCH located
on the boundary of Lot 9
& 10.
Alternative fire escape for
residents in NW part of
SBLOG.
Swale
Vegetation
Service road on Lots 8, 7 &
9 realigned approx 75m to
100m from NWCH to
create 1,000 to 2,000m2
lots depending on views
and existing infrastructure
Hybrid R5-
R10/Conservation lots
created with a mix of R5
land and lower density
conservation / residential
land. This enables 3 or
more lots across each
exising lot. More flexible &
respects existing buildings
and infrastructure.
Hybrid R5-R10
/Conservation Residential
lots with building envelopes
that generally align with
existing DA footprints.
Flexibility to move
envelopes to maximize
biodiversity outcome
This enables 20m to 30m lot
width.
DAP
R5+
R5
or
R10
R5R5R5
R5
R10 / R15
POS
R5
This area R10 or R15
where sewer conection is
feasible. Elevated lots will
have ocean views down
roads
R10
&
R5
POS to cover the area of
Swale Sea Heath
mentioned in TPS 2 on Lots
7 & 9. Counts towards the
10% POS contribution
needed for Lots 7,9 &10.
POS north of the Swale
area may be reduced
subject to clarity around
Coastal Reserve and/or
POS calculations.
Coastal Node
Pedestrian/cycle Path
along existing sand track
Pedestrian/cycle Path
R5
POS
Southern section of the NC
road excavated to approx 4-
5m level and sand used to
raise adjacent lots East of
the NC road to enhance
view lines
R5
R5
R10
R10
R10
R10
R5
R5R5
DAP
Realignment of the
Neighbourhood Connector to
the base of the secondary
dunes along the edge of the
clay flats avoids overlooking
and assists drainage.
R5+ Residential lots.
Lots larger than 2,000m2
with excellent panoramic
views
Service Road approximately
follows the 98m coastal
setback line.
Clay Flats suggested as POS
with final area determined by
drainage and clarity around
how much of the coastal POS
will count towards land owner
contributions. Clay flats
adjacent the NC to be used
for POS that will form a visual
backbone for the entire
SBLOG area.
POS
Access to NWCH located
on the boundary of Lot 9
& 10. Could be upgraded
to NC standard if SBLOG
area develops before
northern BDZ roads are
built
Alternative fire escape for
residents in NW part of
SBLOG. NC status if
required (as above)
Swale
Vegetation
Service road on Lots 8, 7 &
9 realigned approx 75m to
100m from NWCH to
create 1,000 to 2,000m2
lots depending on views
and existing infrastructure
Hybrid R5-
R10/Conservation lots
created with a maximum
R5 density in DAP area.
This enables 3 or more
lots across each exising
lot. More flexible &
respects existing buildings
and infrastructure.
Hybrid R5-R10
/Conservation Residential
lots with building envelopes
that “generally align” with
existing DA footprints.
Flexibility to move
envelopes to maximize
biodiversity outcome. This
enables 20m to 30m lot
width.
DAP
R5+
R5
or
R10
R5R5
R5
R5
R10 / R15
POS
R5
This area R10 or R15
where connection to
existing sewer is feasible.
Elevated lots will have
ocean views down roads
R10
&
R5
POS to cover the area of
Swale Sea Heath
mentioned in TPS 2 on Lots
7 & 9. Counts towards the
10% (15%?) POS
contribution needed for
Lots 7,9 &10. POS north of
the Swale area may be
reduced subject to clarity
around Coastal Reserve
and/or POS calculations.
Coastal Node
Pedestrian/cycle Path
along existing sand track
Pedestrian/cycle Path
R5
POS
Southern section of the NC
road excavated to approx 4-
5m level and sand used to
raise adjacent lots East of
the NC road to enhance
view lines
R5
R5
ONLY
R10
R10
R10
R10
R5
R5R5 / R10
DAP
SBLOG - Revised Concept Plan - March 2014
© Tecta Pty Ltd 2013 All rights reserved

More Related Content

BDZ GHD Structure Plan

  • 1. SOUTH BULLER LAND OWNERS GROUP 77 Ha SBLOG - BDZ PLANNING PROCESS
  • 11. Road noise... Commercial ? best views Quiet building design? Detailed area plan with lot layout (talk to DoP, how to maximize yield) Road location to give buffer to tourism (areas?) approved Tourism / Housing. Large lots (4 lots per lot) 1500m2 - 2000m2 Any school site should go here. Carpark & small shops to align with coastal hub Hwy access to service pre-approved was an “island” created by conservation area Meander road behind houses Large conservation lots (as small as possible) Large lots Res. HD Will drop density to avoid school & infrastructure. (staged 2,000m to smaller when sewer goes through) Workshop Notes by GHD consultant for SBLOG Area NORTH
  • 15. SBLOG - Revised Concept Plan - 22th Nov. Realignment of the Neighbourhood Connector to the base of the secondary dunes along the edge of the clay flats avoids overlooking and assists drainage. Hybrid R5/CZ Residential lots with building envelopes in the green zone for land with ocean views. Suggest a service road realigned that would reclaim some of the most valuable near beach land on Lot 10 and Lot 1891. Views up and down the coast would be possible if the Service road could follow the 98m coastal setback line as shown here. In exchange for the use of some of the existing coastal POS with best views, a strip of the clay flats adjacent the Connector road to be used for POS that will form a visual backbone for the entire SBLOG area. POS Access to NWCH located on the boundary of Lot 9 & 10. If the northern part of BDZ was slow to develop, this service road could be extended down the hill to meet the Neighbourhood Connector and hence form a fire escape for residents in the SBLOG. Swale Vegetation Service road on Lots 8, 7 & 9 realigned approx 75m to 100m from NWCH to create 4 or 5 x 2,000m2 lots per existing Lot Hybrid R5/CZ lots created with a mix of R5 land and lower density conservation / residential land. This enables 3 or more lots across each exising lot. More flexible & easier to incorporate existing buildings. Hybrid R5/CZ Residential / Tourism lots with building envelopes on the West area (shown green) to be created with a mix of R5 land and lower density CZ residential land. This enables 20m to 30m lot width. CZ R5 R5 R5R5R5R5 R5 R5 POS Drainage & POS CZ R5 Service Road to be realigned for better yield. This area NOT be R15 but low density (R5) to avoid the need for sewer/ school/shopping precinct etc R5 POS to cover the area of Swale Sea Heath mentioned in TPS 2 on Lots 7 & 9. Counts towards the 10% POS contribution needed for Lots 8,7,9 &10. Coastal Node Pedestrian/cycle Path along existing sand track Pedestrian/cycle Path along edge of POS R5 POS CZ Agree with GHD entry point for NC road but intersection will need detailed design input as existing road is a wide radius curve. R5
  • 17. SBLOG - Revised Concept Plan - 22nd March 2014 Realignment of the Neighbourhood Connector to the base of the secondary dunes along the edge of the clay flats avoids overlooking and assists drainage. R5+ Residential lots. Lots larger than 2,000m2 with excellent panoramic views Service Road approximately follows the 98m coastal setback line. Clay Flats suggested as POS with final area determined by drainage and clarity around how much of the coastal POS will count towards land owner contributions. Clay flats adjacent the Connector road to be used for POS that will form a visual backbone for the entire SBLOG area. POS Access to NWCH located on the boundary of Lot 9 & 10. Alternative fire escape for residents in SBLOG. Swale Vegetation Service road on Lots 8, 7 & 9 realigned approx 75m to 100m from NWCH to create 1,000 to 2,000m2 lots depending on views and existing infrastructure Hybrid R5/CZ lots created with a mix of R5 land and lower density conservation / residential land. This enables 3 or more lots across each exising lot. More flexible & respects existing buildings and infrastructure. Hybrid R5/CZ Residential lots with building envelopes that generally align with existing DA footprints This enables 20m to 30m lot width. CZ R5+ R5 or R10 R5R5R5 R5 R10 POS R5 This area R10. Elevated lots will have ocean views down roads R10 & R5 POS to cover the area of Swale Sea Heath mentioned in TPS 2 on Lots 7 & 9. Counts towards the 10% POS contribution needed for Lots 7,9 &10. POS north of the Swale area may be reduced subject to clarity around Coastal Reserve and/or POS calculations. Coastal Node Pedestrian/cycle Path along existing sand track Pedestrian/cycle Path R5 POS Southern section of the NC road excavated to approx 4- 5m level and sand used to raise adjacent lots East of the NC road to enhance view lines R5 R5 R10 R10 R10 R10 R5 R5R5
  • 18. SBLOG - Revised Concept Plan - 24th March 2014 Realignment of the Neighbourhood Connector to the base of the secondary dunes along the edge of the clay flats avoids overlooking and assists drainage. R5+ Residential lots. Lots larger than 2,000m2 with excellent panoramic views Service Road approximately follows the 98m coastal setback line. Clay Flats suggested as POS with final area determined by drainage and clarity around how much of the coastal POS will count towards land owner contributions. Clay flats adjacent the Connector road to be used for POS that will form a visual backbone for the entire SBLOG area. POS Access to NWCH located on the boundary of Lot 9 & 10. Alternative fire escape for residents in NW part of SBLOG. Swale Vegetation Service road on Lots 8, 7 & 9 realigned approx 75m to 100m from NWCH to create 1,000 to 2,000m2 lots depending on views and existing infrastructure Hybrid R5- R10/Conservation lots created with a mix of R5 land and lower density conservation / residential land. This enables 3 or more lots across each exising lot. More flexible & respects existing buildings and infrastructure. Hybrid R5-R10 /Conservation Residential lots with building envelopes that generally align with existing DA footprints. Flexibility to move envelopes to maximize biodiversity outcome This enables 20m to 30m lot width. DAP R5+ R5 or R10 R5R5R5 R5 R10 / R15 POS R5 This area R10 or R15 where sewer conection is feasible. Elevated lots will have ocean views down roads R10 & R5 POS to cover the area of Swale Sea Heath mentioned in TPS 2 on Lots 7 & 9. Counts towards the 10% POS contribution needed for Lots 7,9 &10. POS north of the Swale area may be reduced subject to clarity around Coastal Reserve and/or POS calculations. Coastal Node Pedestrian/cycle Path along existing sand track Pedestrian/cycle Path R5 POS Southern section of the NC road excavated to approx 4- 5m level and sand used to raise adjacent lots East of the NC road to enhance view lines R5 R5 R10 R10 R10 R10 R5 R5R5 DAP
  • 19. Realignment of the Neighbourhood Connector to the base of the secondary dunes along the edge of the clay flats avoids overlooking and assists drainage. R5+ Residential lots. Lots larger than 2,000m2 with excellent panoramic views Service Road approximately follows the 98m coastal setback line. Clay Flats suggested as POS with final area determined by drainage and clarity around how much of the coastal POS will count towards land owner contributions. Clay flats adjacent the NC to be used for POS that will form a visual backbone for the entire SBLOG area. POS Access to NWCH located on the boundary of Lot 9 & 10. Could be upgraded to NC standard if SBLOG area develops before northern BDZ roads are built Alternative fire escape for residents in NW part of SBLOG. NC status if required (as above) Swale Vegetation Service road on Lots 8, 7 & 9 realigned approx 75m to 100m from NWCH to create 1,000 to 2,000m2 lots depending on views and existing infrastructure Hybrid R5- R10/Conservation lots created with a maximum R5 density in DAP area. This enables 3 or more lots across each exising lot. More flexible & respects existing buildings and infrastructure. Hybrid R5-R10 /Conservation Residential lots with building envelopes that “generally align” with existing DA footprints. Flexibility to move envelopes to maximize biodiversity outcome. This enables 20m to 30m lot width. DAP R5+ R5 or R10 R5R5 R5 R5 R10 / R15 POS R5 This area R10 or R15 where connection to existing sewer is feasible. Elevated lots will have ocean views down roads R10 & R5 POS to cover the area of Swale Sea Heath mentioned in TPS 2 on Lots 7 & 9. Counts towards the 10% (15%?) POS contribution needed for Lots 7,9 &10. POS north of the Swale area may be reduced subject to clarity around Coastal Reserve and/or POS calculations. Coastal Node Pedestrian/cycle Path along existing sand track Pedestrian/cycle Path R5 POS Southern section of the NC road excavated to approx 4- 5m level and sand used to raise adjacent lots East of the NC road to enhance view lines R5 R5 ONLY R10 R10 R10 R10 R5 R5R5 / R10 DAP SBLOG - Revised Concept Plan - March 2014 © Tecta Pty Ltd 2013 All rights reserved