際際滷

際際滷Share a Scribd company logo
BIM COORDINATION PORTOFOLIO
Architect BIM Coordinator : Mohab Magdy Mohamed
M:0097430327104 Email: Mohab.magdy87@gmail.com
1-Sample for Coordination Process :
2-Sample for Central Files Hirecahy :
SOME SAMPLE FOR PERVIOUS MODELS.
Sample For Discrepancy Flag Inside The model To Detect the Clash Easily
Through The Filters.
1-Sample For Discrepancy Status Inside The Schedule With Discrepancy ID to
Detect and Modify The Clashes Easily Through Discrepancy Flag.
2-Documentation For The Clashes Inside Excel sheet.
SAMPLE FOR INTERFERNCE CHECK REPORT
BY REVIT & NAVISWORKS
INTERFERENCE REPORT BY REVIT:
Interference Report By Navisworks:
BIM COORDINATION PORTOFOLIOOO
SAMPLES FOR BIM COORDINATED 2D&3D CLASHES &
DISCREPENCIES And COORDINATION MEETINGS
ASUMPTIONS WITH STAKEHOLDERS.
BIM Discrepancy Description: References: Status
There is a conflict in the location of (BWO) at the
structure drawings (SM.103A.18) and the arch.
Ceiling (CLG-02) at the Arch. drawings
(AM1.413.18) in (MC.18.03.B21).
SM.103A.18
AM1.413.18
Revit Model
New
ID: AR-FF-347 Page 1/1
Active-BOJV D
Active-BIM
Zone: MU_L3
Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Postponed Michael 16-Jul-2013
Coordination Meeting
Action 1:
Refer to dwg no. 280136 Silvia (TO) - Enji 25-Feb-2014
Coordination Meeting
Action 2:
Coordination Meeting
Action 3:
.
Stage Description By Date
BIM Team Assumption: Follow arch drawing and reduce the height of the structural beam. MOHAB MAGDY 20-Nov-2013
Coordination Meeting
Action 1:
Follow RFI no. (405076-1750) Ashraf Mounir -
Enji
15-Jan-2014
Coordination Meeting
Action 2:
Refer to RFI  405076-1750 rev A Abram Mohsen 17-Sep-2014
BIM Discrepancy
Description: References: Status
Conflict Between Arch DWG
AM1.103.13 And Structural DWG
SM1.103.13 in (MS.13.03.001)
AM1.103.13
SM1.103.13
New
ID: C0-CD- Page1 Active-BOJV
Active-BIM D
Zon MU-L3 Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: mohab 05-Dec-2014
Coordination Meeting
Action 1:
Issue to be solved between HVAC & Structure as discussed with Francois and
Juan.
surnda-TO 26-Nov-2014
Coordination Meeting
Action 2:
Check the openings with MEP since we will maintain only the ones needed (and in
reasonable locations).
Ahmed amin .
BIM Discrepancy
Description: References: Status
conflict between the structure drawings
(SM2.322.03) and the roller shutter detail
(AM6.955) at MP.12.03.002 ,
MP.13.03.003 , MP.13.03.001
SM2.322.03
SM2.324.03
AM6.955
AM6.954
New
ID: C0-CD-310 Page1 Active-BOJV TO D
Active-BIM Team
Zon MU-L3 Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Postponed mohab 24-Feb-2013
Coordination Meeting
Action 1: - -
The
actual
concrete
beam
BIM Discrepancy
Description: References: Status
Conflict in concrete level between structural plan
DWG ( SM1.103)(+47.4) with the arch section
(AM2.344)(+49.4)At the gridline ( S23)
( fall arrest missing in design )
AM1.103
SM1.103
AM2.344
New
ID: C0-CD-308 Page2/2 Active-BOJV TO
Active-BIM Team
Zone MU-L3 Active-PMC D
Resolved
Stage Description By Date
BIM Team Assumption: Follow structural Level and if follow arch DWG we must put handrail in N elev. because different level 1.50m M.Magdy 29-Nov-2013
Coordination Meeting Action
1:
RFI-285062-1926 Dina  Salam Mary (TO) 07-Jan-2015
Coordination Meeting Action
2:
.
SAMPLES FOR CODING CLASHES
Coding Discrepancy
Description: References: Status
Missing item in BOQ
No foundation with 700mm thickness
in the BOQ
Book 2A  Bill 2 Part 1 - 2/1/2
SM1.10G.19
Element ID: 4045565 New
ID:
001
Pag
e
Active-BOJV
Active-BIM
Zone
:
BOQ
Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Assumed to be classified as pad foundation (2/1/2/M) mohab 30-Apr-2013
Coordination Meeting
Action 1:
Confirmed samer 13-Jun-2014
Coordination Meeting
Action 2:
-
Coordination Meeting
Action 3:
-
Coding Discrepancy
Description: References: Status
Missing item in BOQ
No foundation with 2000mm
thickness in BOQ
Book 2A  Bill 2 Part 1 - 2/1/2
SM5.451
Revit Element ID: 3632958 New
ID:
002
Pag
e
Active-BOJV
Active-BIM
Zone
:
BOQ
Active-PMC
Resolved
Stage Description By Date
BIM Team Assumption: Assumed to be mat foundationof 1900mm (2/1/2/L) Mariam 30-Apr-2012
Coordination Meeting
Action 1:
Confirmed MOHAB 13-Jun-2014
Coordination Meeting
Action 2:
-
Coordination Meeting
Action 3:
-
SAMPLES FOR MANUAL COORDINATION USING 2D
COORDINATION TECHINQUE USING XREF FILES IN
AUTOCAD AND LINKED TO REVIT.
BIM COORDINATION PORTOFOLIOOO
The Progress Modeling & Coordination Status:

More Related Content

Viewers also liked (17)

PDF
Haram complementary projects temporary feeding proposals
Mohamed Azzam
PPTX
Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech
PDF
Bim Facades.Final
friscozephyr
PDF
Flevy.com - Collaborative Process Mapping
David Tracy
PDF
Au 09 Bi Mmeans Business.1.05.10
friscozephyr
PPS
Anthony N Dauginas
dauginas
PPTX
Communication & Coordination on a Construction Project Through Building I...
muhammad87
PPTX
Reducing Risk with BIM
The Design Partnership
PPTX
Trusted BIM: Accurate As-Builts for Project Coordination
ClearEdge3D Inc
PPT
Bim101 Aec
marybk
PPT
BIM and the drywall cover up - A case for division 9
StrucSoft Solutions
PPTX
A Team Plumbing and Drainage Systems
Godwin2012
PPTX
Revit for Small Projects: Is it worth the effort?
Eric Peabody
PDF
081204 Virtual Design & Construction
Rocio Gonzalez
PPTX
Stages In Construction
AB MAKASANA
PPT
BIM, Prefabrication & Design Build
Southern Piping Company
PPTX
HKIBIM Building Information Modelling (BIM) awareness Seminar
The Hong Kong Institute of Building Information Modelling (HKIBIM)
Haram complementary projects temporary feeding proposals
Mohamed Azzam
Pinnacle Infotech partaking at 2017 PCI Convention
Pinnacle Infotech
Bim Facades.Final
friscozephyr
Flevy.com - Collaborative Process Mapping
David Tracy
Au 09 Bi Mmeans Business.1.05.10
friscozephyr
Anthony N Dauginas
dauginas
Communication & Coordination on a Construction Project Through Building I...
muhammad87
Reducing Risk with BIM
The Design Partnership
Trusted BIM: Accurate As-Builts for Project Coordination
ClearEdge3D Inc
Bim101 Aec
marybk
BIM and the drywall cover up - A case for division 9
StrucSoft Solutions
A Team Plumbing and Drainage Systems
Godwin2012
Revit for Small Projects: Is it worth the effort?
Eric Peabody
081204 Virtual Design & Construction
Rocio Gonzalez
Stages In Construction
AB MAKASANA
BIM, Prefabrication & Design Build
Southern Piping Company
HKIBIM Building Information Modelling (BIM) awareness Seminar
The Hong Kong Institute of Building Information Modelling (HKIBIM)

Similar to BIM COORDINATION PORTOFOLIOOO (12)

PDF
Introduction to BIM
Ronda Miranda
PPTX
Revit BIM Coordination: Streamlining Collaboration & Efficiency
BarbaraParrish3
PDF
Role of BIM Coordination in Preventing Construction Delays
Top BIM Company
PDF
Importance of bim coordination and clash detection services in the field of e...
Building Information Modelling
PPTX
BIM Usage in Construction Industry and An application of Clash Detection and ...
Ravindra SSK Medicharla
PDF
Seamless MEP Integration with BIM Coordination Services | Tesla Outsourcing S...
Tesla Outsourcing Services
PDF
Seamless MEP Integration with BIM Coordination Services | Tesla Outsourcing S...
Tesla Outsourcing Services
PDF
7 Pro Tips To Perform Crossdisciplinary BIM Coordination
iFieldsmart Technologies
PDF
惘愆悸 悋愀惘 悒 悋惡 惘愆悸 悋愀惘 悒 悋惡
OmarSelim27
PPTX
Ensure Clash-Free Construction with 3D BIM Coordination
Top BIM Company
PDF
Cost and Time Optimization for Construction of Residential Building by Clash ...
IRJET Journal
PPT
The Information Challenge Managing Construction with BIM
CCT International
Introduction to BIM
Ronda Miranda
Revit BIM Coordination: Streamlining Collaboration & Efficiency
BarbaraParrish3
Role of BIM Coordination in Preventing Construction Delays
Top BIM Company
Importance of bim coordination and clash detection services in the field of e...
Building Information Modelling
BIM Usage in Construction Industry and An application of Clash Detection and ...
Ravindra SSK Medicharla
Seamless MEP Integration with BIM Coordination Services | Tesla Outsourcing S...
Tesla Outsourcing Services
Seamless MEP Integration with BIM Coordination Services | Tesla Outsourcing S...
Tesla Outsourcing Services
7 Pro Tips To Perform Crossdisciplinary BIM Coordination
iFieldsmart Technologies
惘愆悸 悋愀惘 悒 悋惡 惘愆悸 悋愀惘 悒 悋惡
OmarSelim27
Ensure Clash-Free Construction with 3D BIM Coordination
Top BIM Company
Cost and Time Optimization for Construction of Residential Building by Clash ...
IRJET Journal
The Information Challenge Managing Construction with BIM
CCT International
Ad

BIM COORDINATION PORTOFOLIOOO

  • 1. BIM COORDINATION PORTOFOLIO Architect BIM Coordinator : Mohab Magdy Mohamed M:0097430327104 Email: Mohab.magdy87@gmail.com
  • 3. 2-Sample for Central Files Hirecahy :
  • 4. SOME SAMPLE FOR PERVIOUS MODELS.
  • 5. Sample For Discrepancy Flag Inside The model To Detect the Clash Easily Through The Filters.
  • 6. 1-Sample For Discrepancy Status Inside The Schedule With Discrepancy ID to Detect and Modify The Clashes Easily Through Discrepancy Flag.
  • 7. 2-Documentation For The Clashes Inside Excel sheet.
  • 8. SAMPLE FOR INTERFERNCE CHECK REPORT BY REVIT & NAVISWORKS
  • 10. Interference Report By Navisworks:
  • 12. SAMPLES FOR BIM COORDINATED 2D&3D CLASHES & DISCREPENCIES And COORDINATION MEETINGS ASUMPTIONS WITH STAKEHOLDERS.
  • 13. BIM Discrepancy Description: References: Status There is a conflict in the location of (BWO) at the structure drawings (SM.103A.18) and the arch. Ceiling (CLG-02) at the Arch. drawings (AM1.413.18) in (MC.18.03.B21). SM.103A.18 AM1.413.18 Revit Model New ID: AR-FF-347 Page 1/1 Active-BOJV D Active-BIM Zone: MU_L3 Active-PMC Resolved Stage Description By Date BIM Team Assumption: Postponed Michael 16-Jul-2013 Coordination Meeting Action 1: Refer to dwg no. 280136 Silvia (TO) - Enji 25-Feb-2014 Coordination Meeting Action 2: Coordination Meeting Action 3: .
  • 14. Stage Description By Date BIM Team Assumption: Follow arch drawing and reduce the height of the structural beam. MOHAB MAGDY 20-Nov-2013 Coordination Meeting Action 1: Follow RFI no. (405076-1750) Ashraf Mounir - Enji 15-Jan-2014 Coordination Meeting Action 2: Refer to RFI 405076-1750 rev A Abram Mohsen 17-Sep-2014
  • 15. BIM Discrepancy Description: References: Status Conflict Between Arch DWG AM1.103.13 And Structural DWG SM1.103.13 in (MS.13.03.001) AM1.103.13 SM1.103.13 New ID: C0-CD- Page1 Active-BOJV Active-BIM D Zon MU-L3 Active-PMC Resolved Stage Description By Date BIM Team Assumption: mohab 05-Dec-2014 Coordination Meeting Action 1: Issue to be solved between HVAC & Structure as discussed with Francois and Juan. surnda-TO 26-Nov-2014 Coordination Meeting Action 2: Check the openings with MEP since we will maintain only the ones needed (and in reasonable locations). Ahmed amin .
  • 16. BIM Discrepancy Description: References: Status conflict between the structure drawings (SM2.322.03) and the roller shutter detail (AM6.955) at MP.12.03.002 , MP.13.03.003 , MP.13.03.001 SM2.322.03 SM2.324.03 AM6.955 AM6.954 New ID: C0-CD-310 Page1 Active-BOJV TO D Active-BIM Team Zon MU-L3 Active-PMC Resolved Stage Description By Date BIM Team Assumption: Postponed mohab 24-Feb-2013 Coordination Meeting Action 1: - - The actual concrete beam
  • 17. BIM Discrepancy Description: References: Status Conflict in concrete level between structural plan DWG ( SM1.103)(+47.4) with the arch section (AM2.344)(+49.4)At the gridline ( S23) ( fall arrest missing in design ) AM1.103 SM1.103 AM2.344 New ID: C0-CD-308 Page2/2 Active-BOJV TO Active-BIM Team Zone MU-L3 Active-PMC D Resolved Stage Description By Date BIM Team Assumption: Follow structural Level and if follow arch DWG we must put handrail in N elev. because different level 1.50m M.Magdy 29-Nov-2013 Coordination Meeting Action 1: RFI-285062-1926 Dina Salam Mary (TO) 07-Jan-2015 Coordination Meeting Action 2: .
  • 19. Coding Discrepancy Description: References: Status Missing item in BOQ No foundation with 700mm thickness in the BOQ Book 2A Bill 2 Part 1 - 2/1/2 SM1.10G.19 Element ID: 4045565 New ID: 001 Pag e Active-BOJV Active-BIM Zone : BOQ Active-PMC Resolved Stage Description By Date BIM Team Assumption: Assumed to be classified as pad foundation (2/1/2/M) mohab 30-Apr-2013 Coordination Meeting Action 1: Confirmed samer 13-Jun-2014 Coordination Meeting Action 2: - Coordination Meeting Action 3: -
  • 20. Coding Discrepancy Description: References: Status Missing item in BOQ No foundation with 2000mm thickness in BOQ Book 2A Bill 2 Part 1 - 2/1/2 SM5.451 Revit Element ID: 3632958 New ID: 002 Pag e Active-BOJV Active-BIM Zone : BOQ Active-PMC Resolved Stage Description By Date BIM Team Assumption: Assumed to be mat foundationof 1900mm (2/1/2/L) Mariam 30-Apr-2012 Coordination Meeting Action 1: Confirmed MOHAB 13-Jun-2014 Coordination Meeting Action 2: - Coordination Meeting Action 3: -
  • 21. SAMPLES FOR MANUAL COORDINATION USING 2D COORDINATION TECHINQUE USING XREF FILES IN AUTOCAD AND LINKED TO REVIT.
  • 23. The Progress Modeling & Coordination Status: