際際滷

際際滷Share a Scribd company logo
SAJITH KAKKIRIKKAN.
FAHAHEEL.KUWAIT.
Mob No.66148256.
E mail: junosajith004@yahoo.com
Junosajith004@gmail.com
Construction (Mechanical / Piping )
Objective:-
To work in an organization demonstrating the experience of Oil field and Power Plant
construction to deliver the best result.
Experience in brief:-
24 Years experience (2yrs in India and 22 yrs in Kuwait) in the Mechanical Piping
construction field.
Job Profile and Responsibilities under taken.
 Planning and scheduling of the construction activities as per sequential and priority
basis from site mobilization stage to handling over based on the total scope of work
and project technical specification.
 Manpower control and forecast distribute the duties and co ordinate among various
disciplines and monitor the work man ship. Lead the entire team to achieve the
progress as per schedule.
 Co ordination between client, consultant, vendors and sub contractors.
 Knowledge of reading Plan, Isometric, and P&ID Drawings.
 Fabrication and construction of skids/units with piping equipment in structures.
 Interpretation of drawings, welding terminologies.
 Fabrication and erection of on plot piping for equipments, Product transfer lines,
Utility lines etc inside oil field and power plants.
 Hydro testing, Pigging, Purging, and drying of pipelines.
 Preparation of Hydro test, Tie-in, Hot tape packages and final documentation of the
packages.
 Experience in Tie - in and hot taping works in crude lines.
 Preparing fit up, Welding, NDE, and Pre heating documentations.
 Installation and handling of fiber glass reinforced thermosetting resin pipe system
(RTRP) and Glass reinforced polyester piping system (GRP). (Lamination
/Coupler/key lock joints).
 Installation and handling of ductile iron piping ( Push on & Locking type)
 Experience in insulation, cladding, heat shrink, and painting works.
 Erection of Metering skids, Fire fighting main pumps, Valves, etc.
 Structure fabrication and erection.
 Making quantity surveys.
 Authorization to obtain Hot & Cold work permits of KOC & KNPC.
 Safety & Quality requirements for the Oil and power plant construction works.
Academic Qualification:-
 Passed JTSLC (junior technical school leaving certificate) from Board of technical
education, Kerala, India.
 Passed Diploma in Mechanical engineering from state board of technical education,
Kerala, India.
 Completed one year Apprentice ship training in Mechanical engineering conducted
by India government Human resource development.
Driving License:-
 Holder of Indian valid Light vehicle Driving license.
Personal Details:-
Permanent Address in India : KAKKIRIKKANS.
: P O.Chovva.Kannur Dt.
: Kerala. India.
Tel: 0091 497 2727452.
Nationality. : Indian.
Date of birth. : 05-03-1969.
Marital status. : Married.
Passport Details:-
Passport No. : J-0975833.
Place of issue. : Kuwait.
Date of issue & Expiry. : 15-02-2010 / 14-02- 2020.
Experience in India:-
 Working as a Technical assistant for the mechanical division of Kannur spinning and
weaving mills Ltd Kerala, India.
Experience in Kuwait:-
 Since 25th Jan 1993 to till working in Kuwait on various construction projects
as mentioned below.
 From Dec 2006 to present working with HYUNDAI HEAVY INDUSTRIES LTD.
KOREA. (EPC Contract at KOC/KNPC/MEW Kuwait)
 From 26th March 2014 to till now working as Mechanical Piping engineer in
HYUNDAI HEAVY INDUSTRIES LTD at Al zour north Independent Water and Power
Project.(1500MW gas fired combined cycle power plant and Desalination Plant).
Work involves in *Overall responsibility of fabrication and installation for the
underground piping work * Issue of drawing and documents to the Sub contractor
*Co ordination between the GRP/DIP pipe vendor*Coordinate with client for
inspection *Review of documentation prior to Hydro test and witnessing Hydro
testing activities*Expediting the whole underground piping activities for completing
the work as per project schedule*Follow up of clearing punch items.
 From 26th June 2011 to 25th March 2014: Working as Mechanical Piping Engineer
in HYUNDAI HEAVY INDUSTRIES LTD at KOC CEF Project. (Crude Export Facilities
at NTF/STF/MAA of Kuwait oil company which include the construction of 19
Tanks, Bunker fuel facilities, Metering system, New pump house and 56"/48" pipe
line approximate 100 KM).
Work involves in*Overall responsibility of fabrication and installation for the above
ground piping work* Issue of drawing and documents to the Sub contractor
*Material coordination *Fit up inspection* Co ordination between Client and Owner
*Metering skids and Valve installation * Tie-in preparation and Demolition of
existing crude lines *Review of documents prior to Hydro test and witnessing Hydro
testing activities* Sand blasting and painting*Expediting the whole piping activities
for completing the work as per project schedule* Follow up of clearing punch items.
 From 24th July 2010 to 25th June 2011 : Working as Mechanical Piping Engineer in
HYUNDAI HEAVY INDUSTRIES LTD at Subiya Power Plant project.( 1000MW Gas
fired combined cycle power plant).
Work involved in *Document/Punch clearing the plant piping system*Pre
commissioning the piping system*Coordination between Owner and Client.
 From 10th Dec 2006 to 23rd July 2010 : Working as Mechanical Piping Engineer in
HYUNDAI HEAVY INDUSTRIES LTD at KOC CEF Project. (Crude Export Facilities at
NTF/STF/MAA of Kuwait oil company which include the construction of 19 Tanks,
Bunker fuel facilities, Metering system, New pump house and 56"/48" pipe line
approximate 100 KM).
Work involves in*Overall responsibility of fabrication and installation for the above
ground & Underground piping works* Issue of drawing and documents to the Sub
contractor *Material coordination *Fit up inspection* Co ordination between Client
and Owner *Pumps and Valve installation* Tie-in preparation and Demolition of
existing crude lines * *Review of documents prior to Hydro test & Pigging*
Witnessing Hydro testing, Pigging, Swabbing activities* Sand blasting and
painting*Heat shrink sleeve application and holiday testing*Expediting the whole
piping activities for completing the work as per project schedule* Follow up of
clearing punch items.
 From Jan 1993 to Nov 2006:-Working with AL METRICK & SONS GENERAL
TRADING CO KUWAIT. For their different construction projects mentioned as
below.
 From Aug 2005 to Nov 2006:- Working as Mechanical supervisor in NBTC at their
KNPC Project ( Tail Gas Treatment Plant KNPC Shuaiba Kuwait).
Work involves in *Fabrication and installation of above ground plant piping
work*Material coordination*Coordination between client and owner for the daily
site inspection*
 From April 2004 to March 2005:- Working as Mechanical supervisor in KFF
International co at Al zour gas turbine Project.
Work involves in *Fabrication and installation of underground piping
work*Erection of fire fighting pumps*Material coordination*Coordination between
client and owner for the daily site inspection*
 From Aug 2002 to Dec 2003:- Working as Mechanical supervisor in Boodai
Construction co at Cost Guard Head Quarters Building Projects.
Work involves in *Fabrication and installation of above ground chiller unit piping
work*Installation of Chiller units* Material coordination * Hydro testing
*Coordination between client and for the daily site inspection*
 From Aug 2000 to Jan 2002:- Working as Mechanical supervisor in Al Metrick &
Sons Co (Mina Al zour South Distillation Stage 111).
Work involves in*Overall responsibility of fabrication and installation for the above
ground piping works *Material coordination *Fit up inspection* Co ordination
between Client *Field final painting & Insulation/cladding for the piping system*
 From March 1998 to Jan 2000:- Working as Mechanical supervisor in Mitsubishi
Heavy Industries, LTD (Assigned by UB Engineering 8x300 MW Sabiya Power
Station Project).
Work involves in*Overall responsibility of installation for the Boiler structure and
field modification *Material coordination *Field inspection* Co ordination between
Client *Field final painting*
 From May 1997 to Jan 1998:- Working as Mechanical supervisor in M/S Toyo
Engineering LTD (Equate 100,000 TPA Kuwait Polypropylene Project ).
Work involves in*Overall responsibility of above ground Piping system Insulation
/Cladding works *Material coordination *Field inspection* Co ordination between
Client *Manpower control and distribution*
 From Jan 1996 to April 1997:- Working as Mechanical supervisor in Al metrick and
sons co. (Head office)
Work involves in*Supporting to project quotation team*Quantity survey*
*Man power mobilization*
 From Jan 1995 to Dec 1995:- Working as Welding Coordinator in Parsons
Engineering Co, (KOC GC 15 Extension of 12 Header).
Work involves in *Daily welding and Preheating documentation* Review of
documentation prior to Hydro test and witnessing Hydro test* Field inspection* Co
ordination between Client *Manpower distribution*
 From Oct 1993 to Dec 1994:- Working as Mechanical supervisor in M/S Almetric
and sons Co, (MEW/MPW Head quarters building Project).
Works Involves in *Above ground fire fighting system piping installation* *Fire
alarm piping works* Installation Fire fighting pumps * Material coordination *Field
inspection* Co ordination between Client *Manpower control and distribution*
 From Jan 1993 to July1993:- Working as Junior Engineer M/S Babcock Engineering
Co (Doha East Power station Maintenance Project).
Work involves in *Daily welding and Preheating documentation* Field inspection*
Co ordination between Client *Manpower distribution*
I hereby declared that the above statements are true and correct. I assure you if I am
appointed to the post. I shall do my best to discharge my duties satisfactorily.
Date: Yours Faithfully.
Place: Kuwait. Sajith Kakkirikkan.

More Related Content

What's hot (20)

Project mgmt set up of cement plant
Project mgmt set up of cement plantProject mgmt set up of cement plant
Project mgmt set up of cement plant
Nihar Routray
Resume-1 (1) (1)
Resume-1 (1) (1)Resume-1 (1) (1)
Resume-1 (1) (1)
Ashish Gupta
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
Sunil Pillai
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
SAJJAD KHUDHUR ABBAS
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
Adeel Shaikh
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
Vinodg Kumar
Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
Syed Owais Ahmed
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
bill ure
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
Mahmoud El-badawy
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
Alaa Ammar
Projects Annex
Projects AnnexProjects Annex
Projects Annex
Bardhyl Leka
CV for J. Moloney
CV for J. MoloneyCV for J. Moloney
CV for J. Moloney
Jack Moloney
Resume Acc
Resume AccResume Acc
Resume Acc
mohammed yousuf
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
aqeel ahmed
Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1
janarthana raja
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
ranganathan shankar
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
Ponraj Ramaswamy
Manimaran
ManimaranManimaran
Manimaran
Manimaran M
Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanical
dineshnandhu007
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
Tata
Project mgmt set up of cement plant
Project mgmt set up of cement plantProject mgmt set up of cement plant
Project mgmt set up of cement plant
Nihar Routray
Resume-1 (1) (1)
Resume-1 (1) (1)Resume-1 (1) (1)
Resume-1 (1) (1)
Ashish Gupta
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
Sunil Pillai
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
PROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECTPROJECT MANAGEMENT PLAN OF  WHITE PORTLAND CEMENT  PLANT PROJECT
PROJECT MANAGEMENT PLAN OF WHITE PORTLAND CEMENT PLANT PROJECT
SAJJAD KHUDHUR ABBAS
Adeel Shaikh CV
Adeel Shaikh CVAdeel Shaikh CV
Adeel Shaikh CV
Adeel Shaikh
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
Vinodg Kumar
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
bill ure
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
Alaa Ammar
CV for J. Moloney
CV for J. MoloneyCV for J. Moloney
CV for J. Moloney
Jack Moloney
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
aqeel ahmed
Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1
janarthana raja
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
ranganathan shankar
Dinesh Kumar S Mechanical
Dinesh Kumar S MechanicalDinesh Kumar S Mechanical
Dinesh Kumar S Mechanical
dineshnandhu007
Mech cv 1
Mech cv 1Mech cv 1
Mech cv 1
Tata

Viewers also liked (6)

Bio Data..NEW
Bio Data..NEWBio Data..NEW
Bio Data..NEW
saiful mohammed
JK FLEET 2015
JK FLEET 2015JK FLEET 2015
JK FLEET 2015
jk Autoengineer
SPOOLMAN-ERMAN
SPOOLMAN-ERMANSPOOLMAN-ERMAN
SPOOLMAN-ERMAN
Parascadd Private Limited
Resume For Linkedin
Resume For LinkedinResume For Linkedin
Resume For Linkedin
Peter Varga
00 introduc-to piping
00 introduc-to piping00 introduc-to piping
00 introduc-to piping
anwar ahmed
ENT300 Business Proposal
ENT300 Business ProposalENT300 Business Proposal
ENT300 Business Proposal
Alia Najiha

Similar to bio data 1 (20)

Mohamed kamal cv2018
Mohamed kamal cv2018Mohamed kamal cv2018
Mohamed kamal cv2018
MOHAMED KAMAL
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
Mohamed Hashim
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
Ahmed Youssef
CV Updated
CV UpdatedCV Updated
CV Updated
akhlaq ahmad
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
AHMED EL-KHOLY
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
Mostafa Omar
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
sagar kumar Behera
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
Ritu kumar mishra
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
Anil Singh
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
Engr. Jerome Lantot
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
TREVOR KEMP
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
Mohammad Arif uzair
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
Ahmad Hadi
Resume
ResumeResume
Resume
Winifredo Piller
CV
CVCV
CV
Sivakumar Natarajan
SABER CV
SABER CVSABER CV
SABER CV
Saber Muallem
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
Hassan Ali(BOP)
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
Toni AZAR

bio data 1

  • 1. SAJITH KAKKIRIKKAN. FAHAHEEL.KUWAIT. Mob No.66148256. E mail: junosajith004@yahoo.com Junosajith004@gmail.com Construction (Mechanical / Piping ) Objective:- To work in an organization demonstrating the experience of Oil field and Power Plant construction to deliver the best result. Experience in brief:- 24 Years experience (2yrs in India and 22 yrs in Kuwait) in the Mechanical Piping construction field. Job Profile and Responsibilities under taken. Planning and scheduling of the construction activities as per sequential and priority basis from site mobilization stage to handling over based on the total scope of work and project technical specification. Manpower control and forecast distribute the duties and co ordinate among various disciplines and monitor the work man ship. Lead the entire team to achieve the progress as per schedule. Co ordination between client, consultant, vendors and sub contractors. Knowledge of reading Plan, Isometric, and P&ID Drawings. Fabrication and construction of skids/units with piping equipment in structures. Interpretation of drawings, welding terminologies. Fabrication and erection of on plot piping for equipments, Product transfer lines, Utility lines etc inside oil field and power plants. Hydro testing, Pigging, Purging, and drying of pipelines. Preparation of Hydro test, Tie-in, Hot tape packages and final documentation of the packages. Experience in Tie - in and hot taping works in crude lines. Preparing fit up, Welding, NDE, and Pre heating documentations. Installation and handling of fiber glass reinforced thermosetting resin pipe system (RTRP) and Glass reinforced polyester piping system (GRP). (Lamination /Coupler/key lock joints). Installation and handling of ductile iron piping ( Push on & Locking type)
  • 2. Experience in insulation, cladding, heat shrink, and painting works. Erection of Metering skids, Fire fighting main pumps, Valves, etc. Structure fabrication and erection. Making quantity surveys. Authorization to obtain Hot & Cold work permits of KOC & KNPC. Safety & Quality requirements for the Oil and power plant construction works. Academic Qualification:- Passed JTSLC (junior technical school leaving certificate) from Board of technical education, Kerala, India. Passed Diploma in Mechanical engineering from state board of technical education, Kerala, India. Completed one year Apprentice ship training in Mechanical engineering conducted by India government Human resource development. Driving License:- Holder of Indian valid Light vehicle Driving license. Personal Details:- Permanent Address in India : KAKKIRIKKANS. : P O.Chovva.Kannur Dt. : Kerala. India. Tel: 0091 497 2727452. Nationality. : Indian. Date of birth. : 05-03-1969. Marital status. : Married. Passport Details:- Passport No. : J-0975833. Place of issue. : Kuwait. Date of issue & Expiry. : 15-02-2010 / 14-02- 2020. Experience in India:- Working as a Technical assistant for the mechanical division of Kannur spinning and weaving mills Ltd Kerala, India. Experience in Kuwait:- Since 25th Jan 1993 to till working in Kuwait on various construction projects as mentioned below. From Dec 2006 to present working with HYUNDAI HEAVY INDUSTRIES LTD. KOREA. (EPC Contract at KOC/KNPC/MEW Kuwait)
  • 3. From 26th March 2014 to till now working as Mechanical Piping engineer in HYUNDAI HEAVY INDUSTRIES LTD at Al zour north Independent Water and Power Project.(1500MW gas fired combined cycle power plant and Desalination Plant). Work involves in *Overall responsibility of fabrication and installation for the underground piping work * Issue of drawing and documents to the Sub contractor *Co ordination between the GRP/DIP pipe vendor*Coordinate with client for inspection *Review of documentation prior to Hydro test and witnessing Hydro testing activities*Expediting the whole underground piping activities for completing the work as per project schedule*Follow up of clearing punch items. From 26th June 2011 to 25th March 2014: Working as Mechanical Piping Engineer in HYUNDAI HEAVY INDUSTRIES LTD at KOC CEF Project. (Crude Export Facilities at NTF/STF/MAA of Kuwait oil company which include the construction of 19 Tanks, Bunker fuel facilities, Metering system, New pump house and 56"/48" pipe line approximate 100 KM). Work involves in*Overall responsibility of fabrication and installation for the above ground piping work* Issue of drawing and documents to the Sub contractor *Material coordination *Fit up inspection* Co ordination between Client and Owner *Metering skids and Valve installation * Tie-in preparation and Demolition of existing crude lines *Review of documents prior to Hydro test and witnessing Hydro testing activities* Sand blasting and painting*Expediting the whole piping activities for completing the work as per project schedule* Follow up of clearing punch items. From 24th July 2010 to 25th June 2011 : Working as Mechanical Piping Engineer in HYUNDAI HEAVY INDUSTRIES LTD at Subiya Power Plant project.( 1000MW Gas fired combined cycle power plant). Work involved in *Document/Punch clearing the plant piping system*Pre commissioning the piping system*Coordination between Owner and Client. From 10th Dec 2006 to 23rd July 2010 : Working as Mechanical Piping Engineer in HYUNDAI HEAVY INDUSTRIES LTD at KOC CEF Project. (Crude Export Facilities at NTF/STF/MAA of Kuwait oil company which include the construction of 19 Tanks, Bunker fuel facilities, Metering system, New pump house and 56"/48" pipe line approximate 100 KM). Work involves in*Overall responsibility of fabrication and installation for the above ground & Underground piping works* Issue of drawing and documents to the Sub contractor *Material coordination *Fit up inspection* Co ordination between Client and Owner *Pumps and Valve installation* Tie-in preparation and Demolition of existing crude lines * *Review of documents prior to Hydro test & Pigging* Witnessing Hydro testing, Pigging, Swabbing activities* Sand blasting and painting*Heat shrink sleeve application and holiday testing*Expediting the whole
  • 4. piping activities for completing the work as per project schedule* Follow up of clearing punch items. From Jan 1993 to Nov 2006:-Working with AL METRICK & SONS GENERAL TRADING CO KUWAIT. For their different construction projects mentioned as below. From Aug 2005 to Nov 2006:- Working as Mechanical supervisor in NBTC at their KNPC Project ( Tail Gas Treatment Plant KNPC Shuaiba Kuwait). Work involves in *Fabrication and installation of above ground plant piping work*Material coordination*Coordination between client and owner for the daily site inspection* From April 2004 to March 2005:- Working as Mechanical supervisor in KFF International co at Al zour gas turbine Project. Work involves in *Fabrication and installation of underground piping work*Erection of fire fighting pumps*Material coordination*Coordination between client and owner for the daily site inspection* From Aug 2002 to Dec 2003:- Working as Mechanical supervisor in Boodai Construction co at Cost Guard Head Quarters Building Projects. Work involves in *Fabrication and installation of above ground chiller unit piping work*Installation of Chiller units* Material coordination * Hydro testing *Coordination between client and for the daily site inspection* From Aug 2000 to Jan 2002:- Working as Mechanical supervisor in Al Metrick & Sons Co (Mina Al zour South Distillation Stage 111). Work involves in*Overall responsibility of fabrication and installation for the above ground piping works *Material coordination *Fit up inspection* Co ordination between Client *Field final painting & Insulation/cladding for the piping system* From March 1998 to Jan 2000:- Working as Mechanical supervisor in Mitsubishi Heavy Industries, LTD (Assigned by UB Engineering 8x300 MW Sabiya Power Station Project). Work involves in*Overall responsibility of installation for the Boiler structure and field modification *Material coordination *Field inspection* Co ordination between Client *Field final painting* From May 1997 to Jan 1998:- Working as Mechanical supervisor in M/S Toyo Engineering LTD (Equate 100,000 TPA Kuwait Polypropylene Project ).
  • 5. Work involves in*Overall responsibility of above ground Piping system Insulation /Cladding works *Material coordination *Field inspection* Co ordination between Client *Manpower control and distribution* From Jan 1996 to April 1997:- Working as Mechanical supervisor in Al metrick and sons co. (Head office) Work involves in*Supporting to project quotation team*Quantity survey* *Man power mobilization* From Jan 1995 to Dec 1995:- Working as Welding Coordinator in Parsons Engineering Co, (KOC GC 15 Extension of 12 Header). Work involves in *Daily welding and Preheating documentation* Review of documentation prior to Hydro test and witnessing Hydro test* Field inspection* Co ordination between Client *Manpower distribution* From Oct 1993 to Dec 1994:- Working as Mechanical supervisor in M/S Almetric and sons Co, (MEW/MPW Head quarters building Project). Works Involves in *Above ground fire fighting system piping installation* *Fire alarm piping works* Installation Fire fighting pumps * Material coordination *Field inspection* Co ordination between Client *Manpower control and distribution* From Jan 1993 to July1993:- Working as Junior Engineer M/S Babcock Engineering Co (Doha East Power station Maintenance Project). Work involves in *Daily welding and Preheating documentation* Field inspection* Co ordination between Client *Manpower distribution* I hereby declared that the above statements are true and correct. I assure you if I am appointed to the post. I shall do my best to discharge my duties satisfactorily. Date: Yours Faithfully. Place: Kuwait. Sajith Kakkirikkan.