Item Quantity Amount Total Cost Fund Sources
Paint 6 gal. P650.00 P3,900.00 Canteen
Lipak 100 pcs. P2.67 P267.00 Canteen
Steel Matting
Going to the
Office of the
PSDS (including
labor)
P7,000.00 Donated by
External
Stakeholders
Steel Matting
Front of the
Library Hub
(including labor)
P4,000.00 MOOE Fund
Tires 52 pcs. P150.00 P7,800 Donated by Engr.
Cobangbang
Total Amount P22,967.00
Prepared by:
MALCRISH L. SAAVEDRA
Adopt-A-School Coordinator Noted:
JOY S. APURADO
Principal II
Item Quantity Amount Total Cost Fund Sources
Paint 4 gal. P650.00 P2,600.00 Canteen
Lipak 300 pcs. P2.67 P801.00 Canteen
Steel Matting at
the Side of the
Library Hub
P3,500.00 Canteen
Labor P1,000 STEP Contribution
Total Amount P7,901.00
Prepared by:
MALCRISH L. SAAVEDRA
Adopt-A-School Coordinator Noted:
JOY S. APURADO
Principal II

More Related Content

Budget for eco club project sy 15-16

  • 1. Item Quantity Amount Total Cost Fund Sources Paint 6 gal. P650.00 P3,900.00 Canteen Lipak 100 pcs. P2.67 P267.00 Canteen Steel Matting Going to the Office of the PSDS (including labor) P7,000.00 Donated by External Stakeholders Steel Matting Front of the Library Hub (including labor) P4,000.00 MOOE Fund Tires 52 pcs. P150.00 P7,800 Donated by Engr. Cobangbang Total Amount P22,967.00 Prepared by: MALCRISH L. SAAVEDRA Adopt-A-School Coordinator Noted: JOY S. APURADO Principal II
  • 2. Item Quantity Amount Total Cost Fund Sources Paint 4 gal. P650.00 P2,600.00 Canteen Lipak 300 pcs. P2.67 P801.00 Canteen Steel Matting at the Side of the Library Hub P3,500.00 Canteen Labor P1,000 STEP Contribution Total Amount P7,901.00 Prepared by: MALCRISH L. SAAVEDRA Adopt-A-School Coordinator Noted: JOY S. APURADO Principal II