3. STEP 1: Erect your BWX Steel Frame
Frames will be available at major centres around the country
4. STEP 2: Level Ground, Mark and Dig
Holes
Once leveled, the frame is fixed in the holes
5. STEP 3: Cast Foundation and Floor
Fit frame into holes and lay foundation
6. STEP 4: Bond Bottles to Frame
The bottles are designed to offer a tight fit into each other, similar to building
blocks. This ensures a sturdy and durable wall.
7. STEP 5: Fix Roof, Plaster and Finish
The roof is then fixed, and the bottles plastered with our special BWX plaster
mix to ensure a solid structure. The building can then be painted and finished
8. AUTHORISED AGENT FOR WESTERN CAPE
Charlie du Plessis
CELL: +27 (0)82 932 3724
EMAIL: charlie@buildingbottles.co.za
WEB: www.buildingbottles.co.za