際際滷

際際滷Share a Scribd company logo
SE Binak
Lead A
Kutah
Asan
Buzpar
(Helleh) Gisakan
Char Pir
(Leads B&C)
(Bushehr)
Bushehr Area Joint Study
I. AGHA JARI
MISHAN
GACHSARAN
I. GACHSARAN
ASMARI
SARVAK
DARIYAN
NEYRIZ
Line 78327A migration Datum 1600m ASL NE>Southeast Binak Line 78302 migration Datum 1600m ASL
SE BINAK
SE Binak Lead  Top Asmari Depth Map
0.584 TCFGas
363 MMbblsOilPossible Volumes in place:
Por=7%; Sw=20%; N:G=80%
1,416.17623.629-3,500-5,100
540.41712.269-3,450-5,050
112.4404.862-3,400-5,000
0.0020.007-3,350-4,950
0.0000.000-3,349-4,949
Gross Rock Volume
(MM cu. m.)
Area
(sq. km.)
Depth
(mss)
Depth
(1,600 masl)
N
Length: 9.2 km Width: 4.0 km Vertical closure: 151 m
Lead A Line R-367 stack Datum 1600m ASL
I. AGHA JARI
MISHAN
GACHSARAN
I. GACHSARAN
ASMARI
SARVAK
DARIYAN
NEYRIZ
NE>
NARGESI TREND
SURFACE
LEAD A
Lead A  Top Neyriz Depth Map
N
Length: 20.4 km Width: 8.4 km Vertical closure: 353 m
7.347 TCFGas
3,086 MMbblsOilPossible Volumes in place:
Por=5%; Sw=20%; N:G=80%
16,863.332120.143-6,200-7,800
16,270.56596.476-6,150-7,750
14,634.78574.741-6,100-7,700
11,798.43352.353-6,050-7,650
7,655.84028.520-6,000-7,600
5,104.50817.171-5,950-7,550
2,470.3607.596-5,900-7,500
119.3200.339-5,850-7,450
0.0000.000-5,847-7,447
Gross Rock Volume
(MM cu. m.)
Area
(sq. km.)
Depth
(mss)
Depth
(1,600 masl)
Gisakan  Topography, Surface Geology and Seismic Coverage
INTRA AGHA JARI
MISHAN
GACHSARAN
INTRA GACHSARAN
ASMARI
SARVAK
DARIYAN
NEYRIZ
E>Lead C and B Line 78322 migration Datum 1600m ASL
LEAD C
LEAD B
Leads B & C  Top Sarvak Depth Map Perspectives
N
Kutah
Lead A
Leads B&C
Leads B & C  Top Sarvak Depth Map Perspectives
N
KUTAH Line 78334 migration-reprocessed Datum 1600m ASL
I. AGHA JARI
MISHAN
GACHSARAN
I. GACHSARAN
ASMARI
SARVAK
DARIYAN
NEYRIZ
NE>
KUTAH-1
Kutah  Top Sarvak Depth Map Perspectives
Kutah
Kutah-1
N
Seismic Reprocessing  overlay on Asmari depth
Kesht/Gisakan detailing
SE Binak  Lead A  Kesht ties
Lead A detailing
SE Binak detailing
Helleh detailing
Structural detail
Total to reprocess = 491 km (409 km onshore + 82 km offshore)
Kesht/Northern Gisakan Detail
Kesht-1
Nargesi-1N
Kesht/Northern Gisakan Detail
Kesht-1
Nargesi-1
N
Maturation Modelling
Binak Helleh Char Pir Khurmuj
Sea Level
Maturity zones schematic only
Immature for hydrocarbon generation?
Mature for significant oil generation?
Mature for mainly gas generation?
Useful gases for soft-drinks and global warming?
Basin Modelling & Prospect Ranking
Structural models
Maturation &
migration models
Reservoir & seal models
Seismic interpretation
RANKING OF LEADS &
PROSPECTS

More Related Content

Bushehr Joint Study Blocks

  • 1. SE Binak Lead A Kutah Asan Buzpar (Helleh) Gisakan Char Pir (Leads B&C) (Bushehr) Bushehr Area Joint Study
  • 2. I. AGHA JARI MISHAN GACHSARAN I. GACHSARAN ASMARI SARVAK DARIYAN NEYRIZ Line 78327A migration Datum 1600m ASL NE>Southeast Binak Line 78302 migration Datum 1600m ASL SE BINAK
  • 3. SE Binak Lead Top Asmari Depth Map 0.584 TCFGas 363 MMbblsOilPossible Volumes in place: Por=7%; Sw=20%; N:G=80% 1,416.17623.629-3,500-5,100 540.41712.269-3,450-5,050 112.4404.862-3,400-5,000 0.0020.007-3,350-4,950 0.0000.000-3,349-4,949 Gross Rock Volume (MM cu. m.) Area (sq. km.) Depth (mss) Depth (1,600 masl) N Length: 9.2 km Width: 4.0 km Vertical closure: 151 m
  • 4. Lead A Line R-367 stack Datum 1600m ASL I. AGHA JARI MISHAN GACHSARAN I. GACHSARAN ASMARI SARVAK DARIYAN NEYRIZ NE> NARGESI TREND SURFACE LEAD A
  • 5. Lead A Top Neyriz Depth Map N Length: 20.4 km Width: 8.4 km Vertical closure: 353 m 7.347 TCFGas 3,086 MMbblsOilPossible Volumes in place: Por=5%; Sw=20%; N:G=80% 16,863.332120.143-6,200-7,800 16,270.56596.476-6,150-7,750 14,634.78574.741-6,100-7,700 11,798.43352.353-6,050-7,650 7,655.84028.520-6,000-7,600 5,104.50817.171-5,950-7,550 2,470.3607.596-5,900-7,500 119.3200.339-5,850-7,450 0.0000.000-5,847-7,447 Gross Rock Volume (MM cu. m.) Area (sq. km.) Depth (mss) Depth (1,600 masl)
  • 6. Gisakan Topography, Surface Geology and Seismic Coverage
  • 7. INTRA AGHA JARI MISHAN GACHSARAN INTRA GACHSARAN ASMARI SARVAK DARIYAN NEYRIZ E>Lead C and B Line 78322 migration Datum 1600m ASL LEAD C LEAD B
  • 8. Leads B & C Top Sarvak Depth Map Perspectives N Kutah Lead A Leads B&C
  • 9. Leads B & C Top Sarvak Depth Map Perspectives N
  • 10. KUTAH Line 78334 migration-reprocessed Datum 1600m ASL I. AGHA JARI MISHAN GACHSARAN I. GACHSARAN ASMARI SARVAK DARIYAN NEYRIZ NE> KUTAH-1
  • 11. Kutah Top Sarvak Depth Map Perspectives Kutah Kutah-1 N
  • 12. Seismic Reprocessing overlay on Asmari depth Kesht/Gisakan detailing SE Binak Lead A Kesht ties Lead A detailing SE Binak detailing Helleh detailing Structural detail Total to reprocess = 491 km (409 km onshore + 82 km offshore)
  • 15. Maturation Modelling Binak Helleh Char Pir Khurmuj Sea Level Maturity zones schematic only Immature for hydrocarbon generation? Mature for significant oil generation? Mature for mainly gas generation? Useful gases for soft-drinks and global warming?
  • 16. Basin Modelling & Prospect Ranking Structural models Maturation & migration models Reservoir & seal models Seismic interpretation RANKING OF LEADS & PROSPECTS