ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Case Study
Talha Saeed
General Info
Initiated Construction in 2014
Construction Completed in 2017
Architect: AAMIR
Consultant Architect: Design Wing Firm
Area:
Site Area: 101863 sqft
Building Area: 42,897 sqft
Cinemas: 2
(Gold and Red )
Capacity:
Red-
Gold-
Location and
Surroundings
Parking
Layout
Ticket Booth,
Entrances
Plans for Ticket Booth, Entrances
Main Hall, Waiting
Areas and Snacks
Bar
Main Hall
Plans for
Main
Hall,
Waiting
Areas
and
Snacks
Bar
Red Cinema Plans
Red
Cinema
Stairs, Entrances/Exits, Lighting and Ceiling
Red Cinema
Gallery/Box
Seats
Entrance+Exit
1 & 2
Theatre Plan
1
2
Entrance 1
Washrooms
Washroom
Plans
Elevator
Shaft
First Floor
View From
First Floor
First Floor
Plan
First Floor
Plan
GROUND FLOOR PLAN
FIRST FLOOR PLAN
Case study cinema complex Architecture
Case study cinema complex Architecture
Case study cinema complex Architecture
Case study cinema complex Architecture
Thank You!

More Related Content

Case study cinema complex Architecture