The document discusses allocating classrooms, laboratories, and faculty rooms in a new polytechnic building according to AICTE norms. An inspection found some rooms were deficient in area. To address this, aluminum partitions will be installed in larger rooms where brick and flooring work is complete. Modifications to labs for certain departments cannot be proposed until room allocation to individual departments/sections is done. The letter requests allocating rooms to departments so they can plan necessary alterations.
1 of 1
More Related Content
Civil work
1. Subject C Allocation of Class Rooms, Rooms for Laboratories and Faculty
Rooms for individual departments/sections
Dear Sir,
Adverting to the aforementioned subject it submitted that the proposed
building for Polytechnic kadapa was inspected in detail with reference to AICTE
2020 C 2021 area norms by the undersigned and other faculty members of
polytechnic kadapa.
Upon Inspection, it was found that rooms were deficient. In order to overcome
the deficiency, the matter was discussed in detail and was decided to go for
Aluminum partition works in rooms whose area is more than the AICTE
requirement, as the brick and flooring work has been complected.
In this regard, a proposalfor the Aluminum Partition works and other necessary
alterations & modifications works (excluding labs for Civil Engineering,
Mechanical Engineering, Electrical Engineering and Apparel Technology) with
supporting drawings was also submitted. It is pertinent to inform that the
aforementioned work would have been avoided if the inspection would have
been done before brick work.
Modifications, Alterations & Aluminum Partition works in Civil Engineering
Laboratories, Mechanical Engineering Laboratories and Apparel Technology
can be proposed only after the allocation of Lab/Workshops/Class
Room/Faculty Rooms to individual departments/Sections.
Inview of the aforesaid it is requested to allocate the rooms to the
departments/Sectionssuchthat they can proposefor necessary Modifications,
Alterations & Aluminum Partition works in the respective rooms.