Property assessment for new facility construction in Alberta is
based on actual construction costs which are to be reported
to the applicable assessing authority subsequent to facility
commissioning.
1 of 1
Download to read offline
More Related Content
Construction cost reporting | Black & White List
1. Alberta Construction Cost Reporting
The Black & White List of Non-Assessable Costs
P R O P E R T Y T A X C O N S U LT I N G
1.403.508.7770 Energy@altusgroup.com www.altusgroup.com
2020 4th Street SW, Suite 310,
Calgary, AB T2S 1W3 Canada
Our consultation services:
Lunch n Learns: Property Tax 101 Property Assessment & Taxation Estimates Other Resourceful Property Tax Documentation
Property assessment for new facility construction in Alberta is
based on actual construction costs which are to be reported
to the applicable assessing authority subsequent to facility
commissioning.
In accordance with the Construction Cost Reporting Guide
(CCRG) issued by Alberta Municipal Affairs, there are a
number of costs that are necessary for facility construction
which may be classified as non-assessable and therefore not
reported for property assessment/tax purposes. Proper
tracking, identification and quantification of construction
costs will assist in managing the future property tax liability of
capital projects.
1. Pre-construction / Post-construction Activity
a. Feasibility Study
b. Cancellation charges
c. Commissioning Costs, Pre-production runs & Start-up
d. Consumable Materials
2. Royalties, Operational Licenses, Patent fees, etc
3. Mobile Equipment
4. Spare Equipment (parts)
5. GST
6. Import Duty and Broker Fees
7. Any Bonuses Paid to Contractors for Early Completion
or Penalties
8. Computer Costs (non-process related)
9. Travel Costs
10. Transportation / Freight Costs (Edmonton Area to site)
11. Interest Costs During Construction
12. Owners Costs (non construction related)
13. Premium Portion of Overtime Paid
14. Property Taxes
Grey non-assessable costs include:
1. Design changes, alterations, and modifications
2. Interference costs
3. Abnormal costs of construction
Black & White of non-assessable costs include: