  BASICS

Corrective vs. Preventive Action
       by Russ Westcott




Q
        uality professionals frequently     mented as a preventive action).                  so you can wait and see progress
        express confusion as to the dif-    Consider the examples in Table 1. (Go            and results.
        ference between corrective and      to www.asq.org, and click on the              ? Use a variety of appropriate dis-
preventive action. A corrective action      cover of Quality Progress.)                      ciplines at different times during
deals with a nonconformity that has                                                          the project.
occurred, and a preventive action           Corrective Action Process                     ? Establish a means for communi-
addresses the potential for a noncon-         ? Locate and document the root                 cating what has been done and
formity to occur. Many ISO 9000 regis-          cause of the nonconformity.                  what has to be done to facilitate
trar auditors tell their clients to use                                                      communication about changes to
separate procedures and forms to doc-                                                        project team members.
ument each type of action. Nothing in                                                     ? Include a clear trail of actions
the standard says this must be done,
                                            Knowing the                                      taken and decisions made to sub-
but p. 13 includes the word ¡°prevent¡±       difference could make                            stantiate the decision to proceed,
in the clauses on corrective and pre-                                                        document lessons learned and
ventive action.                             all the difference.                              avoid needless reinvention on
  On closer reading, however, section                                                        future similar projects.
8.5.2 says corrective action eliminates                                                   Documenting and controlling cor-
the cause of nonconformities to prevent       ? Scan the entire system to ensure        rective and preventive actions ensure
recurrence, and section 8.5.3 says pre-         no other similar nonconformity          appropriate action is taken within a
ventive action determines and elimi-            could occur.                            reasonable timeframe and the result-
nates the causes of potential noncon-         ? Analyze the effect such a noncon-       ing changes work.
formities ¡­ to prevent occurrence. See,         formity may have had on a prod-
there is a difference!                          uct or service produced before the      BIBLIOGRAPHY

                                                nonconformity was discovered,           ANSI/ISO/ASQ Q9001-2000 Quality Man-
Common Misconceptions                           and take action appropriate to the        agement Systems¡ªRequirements, ANSI/
  There are three common misconcep-             severity of the situation by either       ASQ, 2001.
tions about corrective and preventive           recalling the product, notifying        Robitaille, Denise, The Corrective Action
action:                                         the customer, downgrading or              Handbook, Paton Press, 2002.
                                                                                        Stamatis, D.H., Failure Mode Effect Analysis:
   1. The standard calls for document-          scrapping product.
                                                                                          FMEA From Theory to Execution, second
      ing every occurrence of a non-          ? Establish thorough follow-up to           edition, ASQ Quality Press, 2003.
      conformity.                               ensure the correction is effective
   2. A preventive action is really just        and recurrence has been prevented.      RUSS WESTCOTT is president of R.T. Westcott
      calling a corrective action some-                                                 & Associates, Old Saybrook, CT. He is a Fellow
      thing different.                      Preventive Action Process                   of ASQ and an ASQ certified quality auditor and
   3. The major reengineering of a            ? Take proactive steps to ensure a        quality manager. Westcott serves on several com-
      process, product or service, or the       potential nonconformity does not        mittees of ASQ¡¯s Quality Management Division
      introduction of a new process or          occur.                                  and is a certified quality manager refresher course
      equipment, is not a candidate for       ? Employ process and system analy-        instructor. He is co-editor of several Quality
      preventive action documentation.          sis to determine how to build in        Press books, including The Certified Quality
                                                                                        Manager Handbook and The Quality
  One way to dispel these is by sepa-           safeguards and process changes to
                                                                                        Improvement Handbook, and author of
rating situations into what I call a            prevent nonconformance. For             Simplified Project Management for Quality
patch (a single occurrence of a noncon-         example, use a failure mode and         Professionals.
formity that involves little risk and           effects analysis to identify risks
needs not be recorded), a corrective            and potential deficiencies and to
action (a more serious nonconformity            set priorities for improvement.           Please
involving some risk that requires                                                           comment
action to prevent recurrence and must       Developmental Action Process
                                            (Treated as Preventive Actions)                 If you would like to comment on
be recorded), a preventive action (a
                                                                                          this article, please post your remarks
process that can be improved to pre-          ? Initiate an improvement project,
                                                                                          on the Quality Progress Discussion
vent occurrence of a nonconformity              with project plans, justification for
and is to be documented) or a develop-          planned expenditures, resource            Board at www.asq.org, or e-mail
mental action (a planned change to              controls and evaluation.                  them to editor@asq.org.
introduce a new process or product in         ? Contain a related series of actions,
response to strategic objectives, docu-         often separated by long periods

104   I MARCH 2005 I www.asq.org
BACK TO
  BASICS

 TABLE 1            Four Types of Action


Situation            Frequency         Suggested action     Type                  Comment
Final inspection     Single occur-     Rework, repair.      Patch.                May not need to
returns part to      rence before                                                 record; depends on
operator to cor-     shipment.                                                    magnitude of risk
rect. Corrected                                                                   and frequency.
part returned to
original lot.
Item or work unus- Single occur-       Scrap.               Patch.                May not need to
able.              rence before                                                   record; depends on
                   shipment.                                                      magnitude of risk and
                                                                                  frequency.
Item or service      Serious.          Assign for action    Corrective action.
does not meet        Occurred more     (and contact
customer require-    than once and     customer, as
ments.               after shipment.   appropriate):
                                       ? Find root cause.
                                       ? Correct.
                                       ? Document.
                                       ? Evaluate
                                         effectiveness.
Situation that     Nothing has         Assign for action: Preventive action.      May require long-
could potentially  occurred, yet.      ? Analyze what ifs.                        term follow-up to
affect process,                        ? Evaluate poten-                          ensure effectiveness.
product or service                       tial effects of
is found.                                failure.
                                       ? Identify solution.
                                       ? Implement
                                         solution.
                                       ? Document.
                                       ? Evaluate
                                         effectiveness.
Desire to improve    No nonconfor-     Assign project:      Developmental         Organizations fre-
the process, prod-   mance exists,     ? Analyze present    action. Use preven-   quently forget to take
uct or service for   and no poten-       process.           tive action system    credit for this type of
reasons other than   tial for one is   ? Reengineer         with project man-     breakthrough pro-
nonconformance.      detected.           process.           agement.              ject.
                                       ? Document
                                         process.
                                       ? Evaluate effec-
                                         tiveness of
                                         reengineered
                                         process.




00   I MARCH 2005 I www.asq.org                                                                             QUALITY PROGRESS   I MARCH 2005 I 00

More Related Content

Corrective vs-preventive-action

  • 1. BACK TO BASICS Corrective vs. Preventive Action by Russ Westcott Q uality professionals frequently mented as a preventive action). so you can wait and see progress express confusion as to the dif- Consider the examples in Table 1. (Go and results. ference between corrective and to www.asq.org, and click on the ? Use a variety of appropriate dis- preventive action. A corrective action cover of Quality Progress.) ciplines at different times during deals with a nonconformity that has the project. occurred, and a preventive action Corrective Action Process ? Establish a means for communi- addresses the potential for a noncon- ? Locate and document the root cating what has been done and formity to occur. Many ISO 9000 regis- cause of the nonconformity. what has to be done to facilitate trar auditors tell their clients to use communication about changes to separate procedures and forms to doc- project team members. ument each type of action. Nothing in ? Include a clear trail of actions the standard says this must be done, Knowing the taken and decisions made to sub- but p. 13 includes the word ¡°prevent¡± difference could make stantiate the decision to proceed, in the clauses on corrective and pre- document lessons learned and ventive action. all the difference. avoid needless reinvention on On closer reading, however, section future similar projects. 8.5.2 says corrective action eliminates Documenting and controlling cor- the cause of nonconformities to prevent ? Scan the entire system to ensure rective and preventive actions ensure recurrence, and section 8.5.3 says pre- no other similar nonconformity appropriate action is taken within a ventive action determines and elimi- could occur. reasonable timeframe and the result- nates the causes of potential noncon- ? Analyze the effect such a noncon- ing changes work. formities ¡­ to prevent occurrence. See, formity may have had on a prod- there is a difference! uct or service produced before the BIBLIOGRAPHY nonconformity was discovered, ANSI/ISO/ASQ Q9001-2000 Quality Man- Common Misconceptions and take action appropriate to the agement Systems¡ªRequirements, ANSI/ There are three common misconcep- severity of the situation by either ASQ, 2001. tions about corrective and preventive recalling the product, notifying Robitaille, Denise, The Corrective Action action: the customer, downgrading or Handbook, Paton Press, 2002. Stamatis, D.H., Failure Mode Effect Analysis: 1. The standard calls for document- scrapping product. FMEA From Theory to Execution, second ing every occurrence of a non- ? Establish thorough follow-up to edition, ASQ Quality Press, 2003. conformity. ensure the correction is effective 2. A preventive action is really just and recurrence has been prevented. RUSS WESTCOTT is president of R.T. Westcott calling a corrective action some- & Associates, Old Saybrook, CT. He is a Fellow thing different. Preventive Action Process of ASQ and an ASQ certified quality auditor and 3. The major reengineering of a ? Take proactive steps to ensure a quality manager. Westcott serves on several com- process, product or service, or the potential nonconformity does not mittees of ASQ¡¯s Quality Management Division introduction of a new process or occur. and is a certified quality manager refresher course equipment, is not a candidate for ? Employ process and system analy- instructor. He is co-editor of several Quality preventive action documentation. sis to determine how to build in Press books, including The Certified Quality Manager Handbook and The Quality One way to dispel these is by sepa- safeguards and process changes to Improvement Handbook, and author of rating situations into what I call a prevent nonconformance. For Simplified Project Management for Quality patch (a single occurrence of a noncon- example, use a failure mode and Professionals. formity that involves little risk and effects analysis to identify risks needs not be recorded), a corrective and potential deficiencies and to action (a more serious nonconformity set priorities for improvement. Please involving some risk that requires comment action to prevent recurrence and must Developmental Action Process (Treated as Preventive Actions) If you would like to comment on be recorded), a preventive action (a this article, please post your remarks process that can be improved to pre- ? Initiate an improvement project, on the Quality Progress Discussion vent occurrence of a nonconformity with project plans, justification for and is to be documented) or a develop- planned expenditures, resource Board at www.asq.org, or e-mail mental action (a planned change to controls and evaluation. them to editor@asq.org. introduce a new process or product in ? Contain a related series of actions, response to strategic objectives, docu- often separated by long periods 104 I MARCH 2005 I www.asq.org
  • 2. BACK TO BASICS TABLE 1 Four Types of Action Situation Frequency Suggested action Type Comment Final inspection Single occur- Rework, repair. Patch. May not need to returns part to rence before record; depends on operator to cor- shipment. magnitude of risk rect. Corrected and frequency. part returned to original lot. Item or work unus- Single occur- Scrap. Patch. May not need to able. rence before record; depends on shipment. magnitude of risk and frequency. Item or service Serious. Assign for action Corrective action. does not meet Occurred more (and contact customer require- than once and customer, as ments. after shipment. appropriate): ? Find root cause. ? Correct. ? Document. ? Evaluate effectiveness. Situation that Nothing has Assign for action: Preventive action. May require long- could potentially occurred, yet. ? Analyze what ifs. term follow-up to affect process, ? Evaluate poten- ensure effectiveness. product or service tial effects of is found. failure. ? Identify solution. ? Implement solution. ? Document. ? Evaluate effectiveness. Desire to improve No nonconfor- Assign project: Developmental Organizations fre- the process, prod- mance exists, ? Analyze present action. Use preven- quently forget to take uct or service for and no poten- process. tive action system credit for this type of reasons other than tial for one is ? Reengineer with project man- breakthrough pro- nonconformance. detected. process. agement. ject. ? Document process. ? Evaluate effec- tiveness of reengineered process. 00 I MARCH 2005 I www.asq.org QUALITY PROGRESS I MARCH 2005 I 00