This document is a note from STUP Consultants Pvt. Ltd. regarding the design of pile foundations for piers along grids H and O of the elevated viaduct from CH:9500m to CH:15650m of the Chennai Metro Rail Phase 1 Corridor 2 project. The note was prepared on September 29, 2010 and revised based on modified loading details from the Chennai Metro Rail Limited. It contains details such as the project location, owner, contractor, and particulars of the note including the preparer and checker.
1 of 1
Download to read offline
More Related Content
COVER SHEET.doc
1. Post BagNo. 9994,1004-5, Raheja Chambers
213 NarimanPoint, Bombay 400021.
Phone: 2832334,2832371, 2832271
Cable: PostensionTelex: 011 85231 STUP IN
This note is the property of STUP CONSULTANTS P LTD., It should not be used, copied or reproduced
without their written permission.
OFFICE OF ORIGIN BENGALURU
OWNER CHENNAI METRO RAIL LIMITED PHASE -1 CORRIDOR - 2
CONTRACTOR M/S SOMA ENTERPRISE LIMITED.
PROJECT
PART DESIGN AND CONSTRUCTION OF ELEVATED
VIADUCT From CH:9500m (Including Ramp) To CH:15650m
(Excluding viaduct at stations at Koyambedu .CMBT,
Arumbakkam and Vadapalani for a length of 4528mt Plus Four
track , Three Track, Two track configuration and single track
shunting neck at Koyambedu station and Depot entry.
TITLE
Design Of Pile Foundation For the Piers Along Grids H & O
[Arumbakkam Station]
11/9/2010 NOTE NO. DN-300 JOB NO.10453/E SRK KNS
Date Sl. No. Particulars Prepared Checked
11/9/2010 R0 For Approval SRK KNS
29/9/2010 R1 Revised Based on the modified loading details from CCCL SRK KNS
PAGES 1 + APPROVED
NOS 1 TO CHECK CERTIFIED