This document discusses roads in Pakistan, including CPEC roads, motorways, and national highways. It provides details on 5 CPEC road projects costing over $5 billion that are planned or under construction. It also lists 14 existing and under construction motorways running over 5,000 km, as well as over 20 national highways spanning the country and totaling nearly 20,000 km. The motorways and national highways facilitate domestic and international transportation across Pakistan.
4. Sign Project Length (km)
Estimated
Cost(US$ M)
Completion Year
1 KKH Phase II (Thakot -Havelian Section 118 1,366 March 2020.
2 Peshawar-Karachi Motorway (Multan-Sukkur Section) 392 2,980
Aug 2019
3 Khuzdar-Basima Road N-30 (110 km) 110 80
ECNEC approved the projects in
May 2017)
4 Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km) 210 195
PC-I Approved by ECNEC on 12th
April, 2017.
5 KKH Thakot-Raikot N35 remaining portion (136 Km) 136 719.8
Procedural formalities to be
completed shortly
CPEC Highways of Pakistan
6. Sign Course Length (km) Lanes
Completion
Year
Status Remarks
M-1 Peshawar–Islamabad 155 6 2007 Operational Hazara Expressway interchange
completed in 2018.
M-2 Islamabad–Lahore 367 6 1997 Operational Repaved in 2016[8]
M-3
Lahore–Abdul
Hakeem
230 6 2018 Sharqpur Rajana Section
complete.Under
Construction
Construction began in December
2015.
M-4 Pindi Bhattian–Multan 309 4 2018
Sections 1, 2, 5 Operational
Construction began in 2009.
Sections 3, 4 Under
Construction
M-5 Multan–Sukkur 387 6 2019
Sections 1 from Multan
Shuja'abad Operational.
Under Construction
Construction began in May 2016.
M-6 Sukkur–Hyderabad 296 6 2020 Contract Awarded
Construction not yet started. Only
Missing vital link of North to south
connectivity.
Motorways of Pakistan
7. M-7 Dadu–Hub 270 4 Proposed Proposed
M-8 Ratodero–Gwadar 892 2
Partially
Operational
Partially operational
Under Construction
M-9 Hyderabad–Karachi 136 6 2018
Partially
Operational Construction began in
September 2015.
Under Construction
M-10
Karachi Northern
Bypass
57 2 2007 Operational
Proposed 4 lane
expansion.
M-11 Sialkot–Lahore 89 4 2018 Under Construction
Construction began in
April 2017.
M-14 Hakla–D.I Khan 280 4 2019 Under Construction
Construction began in
May 2016.
Hazara Motorway
Hasan Abdal–
Mansehra
180 6 2019
Partially
Operational
Partially operational