際際滷

際際滷Share a Scribd company logo
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 1 of 4
K. P. TOMY
E-Mail: tomykara@yahoo.com; pappu.k@petrofac.com
Contact number: India: +91 8606038942 OR +91 9947624193
Construction Management & Engineering Assignments
Over 25 years of cross-cultural experience in the areas of:
- Construction Management - Strategic Planning
- Civil work supervision - Structural Fabrication & erection
- Design Reviews - Resource Management
- Site Management - Shutdown Work Management
- Relationship Management - General Administration
- Commissioning - Survey of damaged foundations & repair
A Construction Engineer; adept in handling multi-discipline contracts involving Civil & structural,
and Equipment related Jobs.
Following all necessary SAFETY, HEALTH & ENVIRONMENT (SHE) Standards and ensuring
application of the same in all aspects of the work being carried out.
Scheduling and Monitoring of Construction activity, Progress Report, Preparation of Checklist, Client
measurement, and Reconciliation Statement and Supervision of all industrial construction activities.
Construction management of critical civil & structural works with adequate resource planning of
materials & manpower.
Site Procurement of civil work & structural materials and other construction consumables.
Conversant with all civil & structural drawings, standard codes, symbols, specifications and
international standards like ASTM, ACI, ISA, ASME, and API etc.
Conversant with MS Office ,MS Word, MS Excel & Power Point Presentations
Experience in preparation of Preparation of plot plans, necessary rebar detail drawings, structural
detail drawings and construction method of statement.. etc. required for site constructions)
Conversant with all safety requirements in industry as per OSHA standards.
Inspection of all -civil and structural materials and other witness of form work fabrication, installation,
rebar work, concrete pouring, structural fabrication, erection and alignment. Punch list liquidation
and pre-commissioning activities.
Position From September 5th
, 2012 to 5th
March 2015. Construction Engineer.
(Petrofac OPO Iraq. Rumaila for BP)
Responsibilities include:
Supervision of all civil and structural work with quality and safety measures.
Supervisions of lay outing, rebar and form fabrication & erection.
Review civil and structural IDC drawings and prepare comments.
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 2 of 4
Consolidate the findings, and prepare the reports with suitable solutions
Discuss with Project Manager and prepare a detailed scope of work.
Prepare the method of statement, select the appropriate materials from Vendor and supervise
the execution.
Thorough survey and evaluate the existing concrete foundations of static and rotating
equipment and prepare detailed reports.
Design the preliminary Civil Engineering drawings, prepare the plot plan and submit for final
approval.
KEY PROJECTS HANDLED
NITROGEN COMPRESSOR Installation, Project at NIGC Yanbu (As a CONSTRCTION
ENGINEER LEADER)
Review scope of work, Project coordination, progress reporting to Construction manager call
meeting for each disciplines supervisors and preparing minutes; Review IFC drawings, site
layout, excavation, lean concreting, preparation of construction method of statement,
construction supervision of compressor foundations, column foundations pipe rack foundations
and structural works, pipe rack structurals fabrication & erection, pre alignment and anchor bolt
setting and grouting, final alignment and base grouting, Nitrogen compressor Erection, cooler
erection, lube oil skid erection and Alignment & grouting.
OLEFINS RECOVERY PROJECT at YANPET POLYMER-I&II (As a CONSTRUCTION ENGINEER)
Project coordination and Review IFC drawings, site layout, excavation, lean concreting,
construction supervision of compressor foundations, membrane foundations, pipe supports and
structural support & Erection of structurals, membrane skid, alignment, grouting & pre
commissioning and pre commissioning.
GAN GOX CROSS COUNTRY PIPE LINE at NIGC Yanbu (As a IN CHARGE/ SUPERINTENDENT)
Project coordination, IFC Drawing review, supervision of Civil works, like layout, excavation,
lean concreting, pipe support construction, sleeper pre casting and erection, also Fabrication,
erection & welding, hydro testing and pre commissioning of 21 km pipe line from GAS/Yanbu to
Cristal Yanbu, and construction of related pipe supports.
SUMP PIT CONSTRUCTION in ARAMCO Ras Tanura Terminal (As a CONSTRUCTION
SUPERINTENDENT)
Project coordination and supervision of Sheet piling, well point installation, dewatering of
excavated trench, layout & lean concreting, supervision of rebar fabrication, prepare rebar
bending schedule, Construction supervision of sump pit, erection of sump Pump & alignments and
related pipe line works
SHELL PLATE, AND BOTTOM PLATE REPLACEMENT IN STORAGE TANK at ARAMCO Ras
Tanura Terminal.
Supervision of Tank shell extension, bottom plate replacement including oil sand sand
replacement, sand blasting & painting, Nozzle welding, tank hydro testing..etc
Styrene-ll Project in SADAF Jubail (As a CONSTRUCTION SUPERINTENDENT)
Coordination the project and Supervision of Erection of structural pipe rack, construction of tank
ring wall, sump pit, pipe rack foundations, pipe sleepers,..etc
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 3 of 4
HIGH PRESSURE & LOW PRESSURE BOILER, AND FLASH EVAPORATOR SHUT DOWN WORKS at
ARAMCO Ras Tanura Refinery ( As a CONSTRUCTION SUPERVISOR)
Boiler tube replacement & Hydro testing, refractory repairing and Steam drum demister pads
replacement, Heat exchanger tube bundle replacement & hydro testing, Pie line fabrication,
erection an, hydro testing and pre commissioning, Valve hydro testing,
Column shut down like Isolation, blinding, filter replacement, Nozzle weldingetc
SPC Plant Shut down Jubail (2004)
Supervision of Heat Exchanger Bundle Tube replacement & hydro test of newly installed tubes.
Erection and replacement of pipe lines, Boiler Steam Drum internal demister pads replacement,
valves erection
Community Maintenance Project at Dhahran  Saudi Aramco (1995-1998)
Supervision of construction works for the 10 floored two apartment major renovation and different
house renovation, offices and Hospital renovations in project complex.
CAREER CONTOUR
Since Oct2008 to Aug 2012: SABIC (Saudi Basic Industries Corporation/DAR)
Construction Engineer
Accountabilities:
Construction Management including scheduling the construction activities for civil, mechanical &
piping disciplines supervision of contractor jobs, ensuring the work completion as per the schedule
and Quality and Safety standards.
Reporting Progress reports (Actual Vs Plan) to the Management and scheduling the critical activities,
managing recovery plans to avoid delays in schedules.
Reviewing of ITPs, Method of Statement, Job procedures, Construction Check lists, Lifting Plans,
Equipment Erection Schemes and preparation of Punch lists and carryout the safety and project
walkthrough.
Assistance in commissioning and start up of the projects to rectify any construction backlogs in
priority wise.
Inspection of materials, package items, consumables and other construction tools and tackles.
Review and certifying of contractor progress versus billing submissions.
Review the Issued for Construction packages and to support engineering team to finalize the
packages in execution based on actual site conditions.
Major Projects Handled :
Nitrogen Compressor Installation, Associated Piping & Instrumentation
Olefins Recovery Project at Yanpet Polymer-I&II
API/CPI Odor Control System Project
PCVs and PSVs for YANPET-I
PDS valves & related piping at Polymer Unit.
Upgrading Sump Pumps
Quench Oil Pump Upgrading
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 4 of 4
PREVIOUS ASSIGNMENTS
H K Al-Sadiq Sons, Saudi Arabia Project In charge/Suptd Mar 91  Dec 07
GBT Engineering Works, Kerala, India Construction Engineer Feb 88  Jul 90
Since Mar 91 Till Dec 07: H K Al-Sadiq Sons, Saudi Arabia
Project Superintendent
Accountabilities:
Construction Management & Supervision of all the works at site.
Generating progress reports and scheduling day to day construction activities to meet the schedule.
Distribution of labors and workmen to achieve maximum output and optimize cost control.
Conducting site visits, review the engineering packages on site conditions and raising technical
queries to cater the best engineering and industrial practice of construction.
Attending meetings with clients and discussing project progress and take steps to improve technical
quality and safety measures continuously as per client requirements.
Arranging Manpower and Tools & Tackles Deployment, Monitoring the critical paths.
Data collection & Constructions sketches, Client Measurements to assist the planning team in raising
billing progress.
Material and Consumables procurement for the construction activities
Ensuring the construction as per safety practices and client standards, conducting Tool Box meeting,
Safety presentations, empowering workmen for using PPE.
Projects Handled:
1) Erection of Packaging Conveyor System at Polymer Unit Dry End at Yanpet, SABIC (2007)
a) Erection and Alignment of Beumer Bagging Machine ,Conveyors ,Palletizing Units, Stretching Units
and related all kinds of Platform Erections .
b) Commissioning Assistance for the project and supervision of Pre-commissioning Activities like
hydro and leak tests of pipe and instrument utility lines.
c) Cabling & Terminations of Bagging Machine Interfacing to Control Systems.
2) Upgrading of PSVs in U#10 at Yanpet. (2006)
a) Inlet and Outlet pipe lines of PSV (8x10, 10x12 Anderson Greenwood) Fabrication and
Erection.
b) Columns and Drum Erection, New Platform Fabrication and Erection for PSV Accessibility.
3) Gan Gox pipeline Project from Gas Yanbu to Cristal Yanbu (2006-2007)
a) New pipeline installation from Gas Company to Cristal Company (21 Km Cross Country ) including
pipe support and sleepers .The line was Oxygen Service and supervised the pneumatic testing and
inner blasting of the pipe lines.
4) SPC Plant Shut down Jubail (2004)
a) Supervision of Heat Exchanger Bundle Tube replacement & hydro test of newly installed tubes.
Erection and replacement of pipe lines, Boiler Steam Drum internal demister pads replacement,
valves erection.
CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 5 of 4
5) Pipe line and Civil Works at PetroKemya plant in various units.(2003-2005)
a) Replacement of underground pipe lines.
b) Construction of tank ring wall, fire wall and dike wall.
c) Construction and Erection of pipe supports & packaging conveyor system.
6) Styrene II project in Sadaf Jubail (1998-2000)
a) Construction of various concrete skids like column foundations compressor foundations pipe
supports pipe sleepers pipe rack foundations.
b) Structural Erection, supervision of critical welding of exchanger bundle tubes.
7) Tank Farm and Pipe line Execution with Gulf Arabia Jubail Corridor (2000-2002)
a) Pipe Sleeper foundation construction, Concrete foundations for structural pipe rack structural
erection, pipe line fabrication erection done.
b) Procurement assistance in collecting data and comparing and finalizing Material Take-offs as per
actual site conditions.
8) Community Maintenance Project at Dhahran  Saudi Aramco (1995-1998)
a) Supervision of construction works for the 10 floored two apartment major renovation and
different house renovation, offices and Hospital renovations in project complex.
9) Saudi Aramco (1991-1995)
a) Supervised different shutdown works like boiler ,flash evaporator ,exchanger bundle tube
replacement including hydro testing ,valve hydro testing and installation, pipe line fabrication &
erection, nozzle welding ,column erection ,storage tank shell welding ,Tank bottom plate
replacement and repair ,Tank sand blasting ,Painting & Hydro testing . Sheet piling and
construction of sump pits et
SCHOLASTICS
Civil Engineering in 1987.
ITI in FITTER in 1983.
PERSONAL PROFILE
Date of Birth : 01st
June 1963
Address : Petrofac International Limited
Offshore Project & Operations
Rumaila Field,
Basra, Iraq.
Nationality : Indian
Marital Status : Married
Passport Number : Z1971919

More Related Content

What's hot (20)

Tracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing Engineer
Tracy Brooks
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
Sankar Sundaram PMP
HARDEO SAFI Resume 1
HARDEO SAFI Resume 1HARDEO SAFI Resume 1
HARDEO SAFI Resume 1
hardeo safi
cv
cvcv
cv
Saed Salem
Sami resume new
Sami resume newSami resume new
Sami resume new
samiuae
Engr ilyas cv new
Engr ilyas cv newEngr ilyas cv new
Engr ilyas cv new
Malik Ilyas KHATTAK
Planning Engineer _CV
Planning Engineer _CVPlanning Engineer _CV
Planning Engineer _CV
Sajith Nair
Sachin parab
Sachin parabSachin parab
Sachin parab
SACHIN PARAB
Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
Nawaz Shiraz
CV.
CV.CV.
CV.
Awais Ahmad
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
Tarun Behera
CV-ARUN SAMANT
CV-ARUN SAMANTCV-ARUN SAMANT
CV-ARUN SAMANT
ARUN SAMANT
Dec14CV
Dec14CVDec14CV
Dec14CV
Baron Bennington
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normal
Dhakshina murthy
Bill resume
Bill resumeBill resume
Bill resume
Awili Bill
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
Mahendharan Palani
Resume Gp
Resume GpResume Gp
Resume Gp
gabrielpuerta
Raman K Gupta ,QC Engr
Raman K Gupta ,QC EngrRaman K Gupta ,QC Engr
Raman K Gupta ,QC Engr
Raman K Gupta
CV _Rajasekhar- Project Management
CV _Rajasekhar- Project ManagementCV _Rajasekhar- Project Management
CV _Rajasekhar- Project Management
SUDARSAN RAJASEKHAR PASUMARTHI
Santhan CV-2016
Santhan CV-2016Santhan CV-2016
Santhan CV-2016
Jeevanantham Santha Kumar

Similar to CV of KP Tomy (20)

Shoaib Resume
Shoaib ResumeShoaib Resume
Shoaib Resume
shoaib mustafa
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy - 26th May 2016
Raja Rama Mohan Roy Kakollu
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
Diosdado Dolocanog
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
Ghullam Murtaza Dahri
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
NOORUDDIN SHAIKH
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
Mahmoud Azab
My Fresh Cv.pdf
My Fresh Cv.pdfMy Fresh Cv.pdf
My Fresh Cv.pdf
tauqeerarain9211
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
Sajjad Ali
Updated CV
Updated CVUpdated CV
Updated CV
Arun Kumar Gupta
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
mohammed aijaz hussain
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
Muneer Barbar Askar
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
Royce Brown
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
hamdi khalefa
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
John Mark S Jandoc
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
Azem Al Kurdi
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
MALIK NADEEM
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
Saqib Shahzad
Sheraz Mahdi New CV
Sheraz Mahdi New CVSheraz Mahdi New CV
Sheraz Mahdi New CV
Sheeraz Mahdi
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
Waell Azmy

CV of KP Tomy

  • 1. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 1 of 4 K. P. TOMY E-Mail: tomykara@yahoo.com; pappu.k@petrofac.com Contact number: India: +91 8606038942 OR +91 9947624193 Construction Management & Engineering Assignments Over 25 years of cross-cultural experience in the areas of: - Construction Management - Strategic Planning - Civil work supervision - Structural Fabrication & erection - Design Reviews - Resource Management - Site Management - Shutdown Work Management - Relationship Management - General Administration - Commissioning - Survey of damaged foundations & repair A Construction Engineer; adept in handling multi-discipline contracts involving Civil & structural, and Equipment related Jobs. Following all necessary SAFETY, HEALTH & ENVIRONMENT (SHE) Standards and ensuring application of the same in all aspects of the work being carried out. Scheduling and Monitoring of Construction activity, Progress Report, Preparation of Checklist, Client measurement, and Reconciliation Statement and Supervision of all industrial construction activities. Construction management of critical civil & structural works with adequate resource planning of materials & manpower. Site Procurement of civil work & structural materials and other construction consumables. Conversant with all civil & structural drawings, standard codes, symbols, specifications and international standards like ASTM, ACI, ISA, ASME, and API etc. Conversant with MS Office ,MS Word, MS Excel & Power Point Presentations Experience in preparation of Preparation of plot plans, necessary rebar detail drawings, structural detail drawings and construction method of statement.. etc. required for site constructions) Conversant with all safety requirements in industry as per OSHA standards. Inspection of all -civil and structural materials and other witness of form work fabrication, installation, rebar work, concrete pouring, structural fabrication, erection and alignment. Punch list liquidation and pre-commissioning activities. Position From September 5th , 2012 to 5th March 2015. Construction Engineer. (Petrofac OPO Iraq. Rumaila for BP) Responsibilities include: Supervision of all civil and structural work with quality and safety measures. Supervisions of lay outing, rebar and form fabrication & erection. Review civil and structural IDC drawings and prepare comments.
  • 2. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 2 of 4 Consolidate the findings, and prepare the reports with suitable solutions Discuss with Project Manager and prepare a detailed scope of work. Prepare the method of statement, select the appropriate materials from Vendor and supervise the execution. Thorough survey and evaluate the existing concrete foundations of static and rotating equipment and prepare detailed reports. Design the preliminary Civil Engineering drawings, prepare the plot plan and submit for final approval. KEY PROJECTS HANDLED NITROGEN COMPRESSOR Installation, Project at NIGC Yanbu (As a CONSTRCTION ENGINEER LEADER) Review scope of work, Project coordination, progress reporting to Construction manager call meeting for each disciplines supervisors and preparing minutes; Review IFC drawings, site layout, excavation, lean concreting, preparation of construction method of statement, construction supervision of compressor foundations, column foundations pipe rack foundations and structural works, pipe rack structurals fabrication & erection, pre alignment and anchor bolt setting and grouting, final alignment and base grouting, Nitrogen compressor Erection, cooler erection, lube oil skid erection and Alignment & grouting. OLEFINS RECOVERY PROJECT at YANPET POLYMER-I&II (As a CONSTRUCTION ENGINEER) Project coordination and Review IFC drawings, site layout, excavation, lean concreting, construction supervision of compressor foundations, membrane foundations, pipe supports and structural support & Erection of structurals, membrane skid, alignment, grouting & pre commissioning and pre commissioning. GAN GOX CROSS COUNTRY PIPE LINE at NIGC Yanbu (As a IN CHARGE/ SUPERINTENDENT) Project coordination, IFC Drawing review, supervision of Civil works, like layout, excavation, lean concreting, pipe support construction, sleeper pre casting and erection, also Fabrication, erection & welding, hydro testing and pre commissioning of 21 km pipe line from GAS/Yanbu to Cristal Yanbu, and construction of related pipe supports. SUMP PIT CONSTRUCTION in ARAMCO Ras Tanura Terminal (As a CONSTRUCTION SUPERINTENDENT) Project coordination and supervision of Sheet piling, well point installation, dewatering of excavated trench, layout & lean concreting, supervision of rebar fabrication, prepare rebar bending schedule, Construction supervision of sump pit, erection of sump Pump & alignments and related pipe line works SHELL PLATE, AND BOTTOM PLATE REPLACEMENT IN STORAGE TANK at ARAMCO Ras Tanura Terminal. Supervision of Tank shell extension, bottom plate replacement including oil sand sand replacement, sand blasting & painting, Nozzle welding, tank hydro testing..etc Styrene-ll Project in SADAF Jubail (As a CONSTRUCTION SUPERINTENDENT) Coordination the project and Supervision of Erection of structural pipe rack, construction of tank ring wall, sump pit, pipe rack foundations, pipe sleepers,..etc
  • 3. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 3 of 4 HIGH PRESSURE & LOW PRESSURE BOILER, AND FLASH EVAPORATOR SHUT DOWN WORKS at ARAMCO Ras Tanura Refinery ( As a CONSTRUCTION SUPERVISOR) Boiler tube replacement & Hydro testing, refractory repairing and Steam drum demister pads replacement, Heat exchanger tube bundle replacement & hydro testing, Pie line fabrication, erection an, hydro testing and pre commissioning, Valve hydro testing, Column shut down like Isolation, blinding, filter replacement, Nozzle weldingetc SPC Plant Shut down Jubail (2004) Supervision of Heat Exchanger Bundle Tube replacement & hydro test of newly installed tubes. Erection and replacement of pipe lines, Boiler Steam Drum internal demister pads replacement, valves erection Community Maintenance Project at Dhahran Saudi Aramco (1995-1998) Supervision of construction works for the 10 floored two apartment major renovation and different house renovation, offices and Hospital renovations in project complex. CAREER CONTOUR Since Oct2008 to Aug 2012: SABIC (Saudi Basic Industries Corporation/DAR) Construction Engineer Accountabilities: Construction Management including scheduling the construction activities for civil, mechanical & piping disciplines supervision of contractor jobs, ensuring the work completion as per the schedule and Quality and Safety standards. Reporting Progress reports (Actual Vs Plan) to the Management and scheduling the critical activities, managing recovery plans to avoid delays in schedules. Reviewing of ITPs, Method of Statement, Job procedures, Construction Check lists, Lifting Plans, Equipment Erection Schemes and preparation of Punch lists and carryout the safety and project walkthrough. Assistance in commissioning and start up of the projects to rectify any construction backlogs in priority wise. Inspection of materials, package items, consumables and other construction tools and tackles. Review and certifying of contractor progress versus billing submissions. Review the Issued for Construction packages and to support engineering team to finalize the packages in execution based on actual site conditions. Major Projects Handled : Nitrogen Compressor Installation, Associated Piping & Instrumentation Olefins Recovery Project at Yanpet Polymer-I&II API/CPI Odor Control System Project PCVs and PSVs for YANPET-I PDS valves & related piping at Polymer Unit. Upgrading Sump Pumps Quench Oil Pump Upgrading
  • 4. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 4 of 4 PREVIOUS ASSIGNMENTS H K Al-Sadiq Sons, Saudi Arabia Project In charge/Suptd Mar 91 Dec 07 GBT Engineering Works, Kerala, India Construction Engineer Feb 88 Jul 90 Since Mar 91 Till Dec 07: H K Al-Sadiq Sons, Saudi Arabia Project Superintendent Accountabilities: Construction Management & Supervision of all the works at site. Generating progress reports and scheduling day to day construction activities to meet the schedule. Distribution of labors and workmen to achieve maximum output and optimize cost control. Conducting site visits, review the engineering packages on site conditions and raising technical queries to cater the best engineering and industrial practice of construction. Attending meetings with clients and discussing project progress and take steps to improve technical quality and safety measures continuously as per client requirements. Arranging Manpower and Tools & Tackles Deployment, Monitoring the critical paths. Data collection & Constructions sketches, Client Measurements to assist the planning team in raising billing progress. Material and Consumables procurement for the construction activities Ensuring the construction as per safety practices and client standards, conducting Tool Box meeting, Safety presentations, empowering workmen for using PPE. Projects Handled: 1) Erection of Packaging Conveyor System at Polymer Unit Dry End at Yanpet, SABIC (2007) a) Erection and Alignment of Beumer Bagging Machine ,Conveyors ,Palletizing Units, Stretching Units and related all kinds of Platform Erections . b) Commissioning Assistance for the project and supervision of Pre-commissioning Activities like hydro and leak tests of pipe and instrument utility lines. c) Cabling & Terminations of Bagging Machine Interfacing to Control Systems. 2) Upgrading of PSVs in U#10 at Yanpet. (2006) a) Inlet and Outlet pipe lines of PSV (8x10, 10x12 Anderson Greenwood) Fabrication and Erection. b) Columns and Drum Erection, New Platform Fabrication and Erection for PSV Accessibility. 3) Gan Gox pipeline Project from Gas Yanbu to Cristal Yanbu (2006-2007) a) New pipeline installation from Gas Company to Cristal Company (21 Km Cross Country ) including pipe support and sleepers .The line was Oxygen Service and supervised the pneumatic testing and inner blasting of the pipe lines. 4) SPC Plant Shut down Jubail (2004) a) Supervision of Heat Exchanger Bundle Tube replacement & hydro test of newly installed tubes. Erection and replacement of pipe lines, Boiler Steam Drum internal demister pads replacement, valves erection.
  • 5. CONSTRUCTION MANAGEMENT & ENGINEERING P a g e | 5 of 4 5) Pipe line and Civil Works at PetroKemya plant in various units.(2003-2005) a) Replacement of underground pipe lines. b) Construction of tank ring wall, fire wall and dike wall. c) Construction and Erection of pipe supports & packaging conveyor system. 6) Styrene II project in Sadaf Jubail (1998-2000) a) Construction of various concrete skids like column foundations compressor foundations pipe supports pipe sleepers pipe rack foundations. b) Structural Erection, supervision of critical welding of exchanger bundle tubes. 7) Tank Farm and Pipe line Execution with Gulf Arabia Jubail Corridor (2000-2002) a) Pipe Sleeper foundation construction, Concrete foundations for structural pipe rack structural erection, pipe line fabrication erection done. b) Procurement assistance in collecting data and comparing and finalizing Material Take-offs as per actual site conditions. 8) Community Maintenance Project at Dhahran Saudi Aramco (1995-1998) a) Supervision of construction works for the 10 floored two apartment major renovation and different house renovation, offices and Hospital renovations in project complex. 9) Saudi Aramco (1991-1995) a) Supervised different shutdown works like boiler ,flash evaporator ,exchanger bundle tube replacement including hydro testing ,valve hydro testing and installation, pipe line fabrication & erection, nozzle welding ,column erection ,storage tank shell welding ,Tank bottom plate replacement and repair ,Tank sand blasting ,Painting & Hydro testing . Sheet piling and construction of sump pits et SCHOLASTICS Civil Engineering in 1987. ITI in FITTER in 1983. PERSONAL PROFILE Date of Birth : 01st June 1963 Address : Petrofac International Limited Offshore Project & Operations Rumaila Field, Basra, Iraq. Nationality : Indian Marital Status : Married Passport Number : Z1971919