This curriculum vitae outlines the professional experience and qualifications of Dimitrakopoulos Charalambos, a Greek civil engineer. He has over 20 years of experience managing infrastructure projects in Greece and abroad. His areas of expertise include road construction, harbor works, and water treatment plants. He is proficient in English and French and has a strong track record of safely delivering projects on schedule and within budget.
1 of 25
Download to read offline
More Related Content
Cv & projects updated
1. CURRICULUM VITAE
FULL NAME: DIMITRAKOPOULOS CHARALAMBOS
NATIONALITY: GREEK
RESIDENCE: PYRGOS / Prefecture Of ILIAS / GREECE
FAMILY STATUS: MARRIED (2 CHILDREN)
DATE OF BIRTH: 8th of September 1973
PROFESSION: Civil Engineer
Contact: +30 6981031504 (mobile)
email: omilosdest@gmail.com
linkedin : Charalambos Dimitrakopoulos
Skype id: lambis_dimitrakopoulos
EDUCATION / SKILLS
University: Technological Educational Institution of Athens.
Specialty: CIVIL & INFRASTRUCTURE ENGINEERING (roads, highways,
harbors, retaining walls, hydraulic & irrigation works, sewage,
culverts, drainages, ect)
Year of graduation: 1998
Graduation Degree 6, 8
Member of the Project Management Institute (PMI).
Member ID: 2390919
Charteredmember of the Civil & infrastructure Technological
Engineers Greek Accosiation Member ID: 25323
Languages spoken: English (fluently) French (fluently)
Computer software: Office 2007 AutoCAD 2008/09 Primavera Project Planner
Driver License: Yes (international)
Equipment manipulation: Leica TS02 total station / Hitachi 106 crawler crane manipulation
/Cat 950H Wheel Loader manipulation.
INTERESTS - HOBBIES
Literature Computer hardware Photography Languages Classical Music Puzzles
Availability
Immediate (Notice period 15~30 days for relocation & visa arrangements)
2. EXPERIENCE
May 2014 ~ today (staff)
Municipality of Pyrgos Greece Lead Engineer of urban & rural road maintenance works.
Supervisor Engineer in significant Projects financed by the
Municipality of Pyrgos.
May 2013 ~ May 2014 (contract)
JP Contractors Nig. Ltd Site Engineer / foreman on road & infrastructure works at Imo State in
Nigeria.
Project Manager at the Company's asphalt plant.
Site Engineer-foreman on asphalt works
December 2009 ~ May 2013(staff)
Municipality of Pyrgos Greece Site engineer on road construction and infrastructure maintenance
works.
Cost engineer & Supervisor engineer in significant Projects financed by
the Municipality of Pyrgos.
Lead Engineer of urban & rural road works executed by the Municipality
of Pyrgos with its own fleet of heavy machinery.
July 2008 ~ December 2009 (contract)
Theodosis Constructions S.A. Construction Engineer , Cost Engineer & Quantity Surveyor for Private
Building Projects (turn key luxurious houses & blocks of flats) & Public
Projects (retaining walls optical fiber- schools- churches
earthworks-infrastructure)
Site engineer-foreman for frameworks & reinforced concrete works.
August 2005 ~ July 2008 (contract)
Egnatia Odos S.A. Supervisor Site Manager during the construction of
Komotini~Alexandroupoli Highway. Role: Quantity Surveyor Cost
Engineer Project Engineer
September 2004 ~ August 2005 (contract)
Ergodomiki S.A. Site Manager & Quantity Surveyor during the framework construction of
the main repair shop of KOSMOCAR S.A. & the framework
construction of the Head Office of EUROBANK ERGASIAS S.A. in
Athens
Site engineer-foreman for frameworks & reinforced concrete works.
December 2002 ~ September 2004 (staff)
Olympic Village 2004 S.A. Supervisor Engineer & Quantity Surveyor during the construction of the
athletes houses in the Olympic Village for the Olympic Games
of 2004 in Athens.
September 2001 ~ September 2002 (contract)
ERGODRAGAGE S.A. Site Manager of aggregates quarrying (sand & gravel) using dredge-
boat & drag line in TCHAD in Central Africa.
3. June 2000 ~ September 2001 (staff)
KLEARXOS ROUTSIS S.A. Construction engineer responsible of naval works during the
construction of the extension of Piraeus harbor (Queen Mary II dock
at Themistocles Pier)
March 1997~June 2000 (contract)
ELTER S.A. Construction engineer during the construction of natural gas pipe-line
(PE) network in Athens. Role: Quantity Surveyor Cost Engineer
Schedule control engineer
February 1995 ~ March 1997 (staff)
ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.
Office & technical assistant for the construction sites of sewage &
water treatment plants.
Major Public Projects (in Greece & abroad)
Harbor of Piraeus
Olympic Village
Komotini Alexandoupolis Highway Egnatia Odos subsector Mesti-Makri 15.4
Construction of the Creche Building Complex at Karatoula Ilias financed by the Church
of Cyprus
The expansion of the MGBEE road from Olru to Ideato South at Imo State (Nigeria)
Projects Certifications available upon request
REFERENCES
Upon Request
4. PROJECTS INDEX
May 2014 ~ today (stuff)
Municipality of Pyrgos Greece
Lead Engineer of urban & rural road maintenance works.
Supervisor Engineer in significant Projects financed by the Municipality of Pyrgos.
5. May 2013 ~ May 2014 (contract)
JP Contractors Nig. Ltd
Thiswas myrecent international positionasSite Engineer,workingforan IrishContractor.
The Projecttitle wasthe Expansionof the MGBEE road fromOrlu toIdeatoSouthincludingthe anti-
erosionworks.The budgetof the Projectwas2.602.414.000 (12.333.715)
My salaryagreementwasat40.000 annually(notincludingaccommodation,transport,flightticketsevery3
months)
My responsibilitywasthe organizationof the groupof labors& the machines, in orderto achieve the
maximumproductivity.
Brief ProjectDescription:
Constructionof the drainage system(1mwidth&1m height) onbothsidesof the road& connection
withthe natural water-sources
Excavationof the extensionof the road(double sideexpansion)
Backfillingwithlaterite.
Constructionof the infrastructure of the road(30 cm of stone base)
6. Constructionof the roaddemarcation
Constructionof the asphaltlayer(5cmcompacted)
Duringthe rainyseason,Iconstructedthe AsphaltPlantof the Company&I trainedthe AsphaltOperator,the
loaderoperator,the mechanic&the labors.
The manufacturerof the plantwasthe IndianCompanyCapiousandthe model of the plantwasthe
DM 60-90
7. December 2009 ~ May 2013(stuff)
Municipality of Pyrgos Greece
As Lead Engineer of Urban & Rural Road works, I was responsible of evaluating the citizens requests,
scheduling & monitoring the daily plan using the Municipalitys fleet of heavy machinery (1 loader, 1
Crawler Excavator, 6 JCB loader backhoes, 8 trucks, 2 graders )
8. As Supervisor Engineer I was responsible for the onsite construction of the Public Projects financed by
the Municipality. My additional role was to monitor the implementation of the quality tests and the
inspection of the safety measures. I was also responsible for the Cost Control of the Projects & for the
compliance with the Time-Schedule.
Major Public Projects
1. Solid Waste Management Budget: 550.000
2. Erosion Control project at St. Georgios Budget: 203.000
3. Erosion control project at Skafidia Budget: 300.000
4. Restoration of the old hospital Manolopoulio
after the earthquakes on 1993 & 2008 Budget: 1.200.000
5. 2nd project of permanent Traffic interventions
at Pyrgos town. Budget: 320.000
6. Construction of the Skourochori Skafidia
intersection Budget: 114.000
7. Redevelopment of the old square at EleonasBudjet: 128.000
9. As site Engineer, I was charged of the construction of multiples urban road works executed by the
labors and the machinery of the Municipality of Pyrgos. The projects were supervised by the Technical
Department of the Municipality. The budget was ~ 750.000
10. July 2008 ~ December 2009 (contract)
Theodosis Constructions S.A.
Construction Engineer , Cost Engineer & Quantity Surveyor for Private Building Projects (turn key
luxurious houses & blocks of flats) & Public Projects (retaining walls optical fiber- schools- churches
Public buildings - earthworks-infrastructure)
Site superintendent on frameworks & reinforced concrete works.
My salaryagreementwas2.000 monthly
13. August 2005 ~ July 2008 (contract)
Egnatia Odos S.A.
14. The 1st Project subject was:
the expansion of the old National road from Komotini to Alexandroupoli ,
Subsector Mesti~Makri (17Km)
the expansion of the Motorway from Komotini to Alexandroupoli ,
Subsector Mesti Makri (14.7 Km)
The Project budget was 21.000.000
The 2nd Project subject was:
The construction of the slip resistance asphalt layer from New Karvali to Xrisoupoli (14.5 Km)
>> >> >> of the Alexandroupolis Ring Road (20,5 Km)
>> of the remaining asphalt works from New Karvali to Alexandroupolis
The Project budget was 24.000.000
My salaryagreementwas27.000 annually(includingaccommodation,transport and life-assurance)
My role, as a member of the supervising team, considering the field works, was the daily monitoring of the
executed earthworks & the concrete works (extensions of existing culverts & retaining walls), the monitoring of
the explosions, the inspection of the safety measures, the control of the infrastructure construction, the
implementation of the quality tests , the monitoring of the asphalt works & the control of the safety barrier
installation works.
Considering the office job, I was the Lead Quantity Surveyor with extra duties as Cost Controller assistant.
16. September 2004 ~ August 2005 (contract)
Ergodomiki S.A.
The Projectsubjectwasthe constructionof the concrete structure of:
The main work-shopof KosmocarS.A.(2.200 m2 surface,2 floors+ 1 basement) atElefsina
The constructionof EUROBANK ERGASIAS S.A. mainoffice(4.300m2 surface,6 floors+ 4 basements+
treasury) inAthens
My salaryagreementwas1.800 monthly
My responsibilityassite Engineer wasthe dailyschedulingof the works(frameworkssetting concrete casting
frameworksstriping),the guidance of the craftsmenandthe labors,the qualitytests,the monitoringof the
workprogress.
Consideringthe paperwork,Iwasincharge of the QuantitySurveillanceandthe verificationof the
subcontractorspayrolls.
18. December 2002 ~ September 2004 (staff)
Olympic Village 2004 S.A.
The Project subject was:
The construction of the athletes houses in the Olympic Village for the Olympic Games of 2004 in
Athens
The construction of the roads and the roads infrastructure inside the Olympic Village
The construction of the connecting roads
The project Budget was 100.000.000
Additional projects:
The construction of the athletic compound (1 football stadium, 2 indoor multipurpose gymnasiums, 1
swimming pool constructed according to the Olympic standards, 4 tennis playgrouns).
Budget: 4.500.000
The construction of the main Fire Station of Parnitha Mountain. Budget: 600.000
My responsibility as Site Engineer Foreman, was to monitor the works progress, to ensure the safety & the
quality, and make sure that everything was executed according to the regulations and the instructions of the
Olympic Committee.
Considering the office work, my duty was the Quality and the Quantity surveillance.
My salary agreement was 1.500 monthly, including assurance.
Athletic
compound
Main Fire
Station
Olympic
village
20. September 2001 ~ September 2002 (contract)
ERGODRAGAGE S.A.
This is my first attempt to work abroad, so I came to an agreement with a Greek Contractor who was planning
to construct a quarry.
My responsibilities in Greece:
I was responsible to choose the appropriate machinery, (1 crawler crane Hitachi of 40tn, 1 truck
Mercedes 2626, 1 vibrating screen).
I was monitoring the construction of the screen, & the maintenance of the crane and the truck.
I was trained to operate the crawler crane as drag-line
I organized the custom-clearance, the shipping and the expedition.
My responsibilities in Chad
I organized the custom clearance and the transport from Duala (the Cameroonian harbor) to
NDjamena.
I assembled the vibrating screen and I trained the mechanic, the operators & the labors.
My salary agreement was 1.500 monthly in Greece during the fabrication and the expedition & 3000 in Africa
21. June 2000 ~ September 2001 (staff)
KLEARXOS ROUTSIS S.A.
Brief Project description:
Silt dredging from the sea bottom
Underwater drilling and placement of the explosives
Underwater explosions
Underwater excavations with clamshells and floating excavator
Construction of the concrete blocks
Construction of the underwater infrastructure
Positioning of the blocks
Construction of the upper structure
The budget of the Project was 16.727.806
My responsibility as naval Engineer was the daily measurement of the depth of the sea bottom, the scheduling
and the monitoring of the underwater blasts, the guidance of the clamshells and the floating excavator,, the
scheduling of the blocks positioning and the surveillance of the immersion.
24. March 1997~June 2000 (contract)
ELTER S.A.
The Project was the construction of natural gas pipe-line (PE) basic network of 4bars pressure, in the
sectors 16,17,18,21,22,68,71,73 & 83 of Attika
The budget of the Project was 5.282.465
My responsibilityasjuniorsite Engineerwasthe dailyschedulingof the works(machines&labors),the
inspectionof the safetymeasures,the qualitytests&the monitoringof the pipe welders.
Consideringthe paperwork,Iwasincharge of the Quantity& CostSurveillance aswell asthe time-scheduling
usingPrimaverasoftware.
25. February 1995 ~ March 1997 (staff)
ANTONIOS ZACHAROPOULOS S.A. & KRUGER A.S.
I started working on 1995 at a reputed Contractor, specialized on water treatment plants, during my early years
as a student. I had the chance to work side by side with very experienced Engineers and that was the source of
my passion for the constructions.
Slowly slowly from a shy office assistant I was transformed to a useful cadre and I took in charge the office
support of the working sites.
The support was:
Correspondence with the authorities
Control of the subcontractors payrolls
Detailed construction drawings according to tech. specifications
Sincerely yours
Lambis Dimitrakopoulos
Civil & infrastructure Engineer
Projects certifications officially translated, available upon request
Additional documentary (passport - degree - yellow cart e.c.t) available upon request