ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Muhammad Asim Akbar 
Contact No: +92-322- 5115160 
e-mail: asim_live09@yahoo.com 
House# DK 525-526, Dhoke Paracha, Rawalpindi, Pakistan. 
To work in a dynamic organization to enhance my exposure to practical work and polish my 
Technical and Communication skills 
? ZTE 4G LTE 
? ZTE 3G CDMA 
Designation : Engineer 
Company : ZTE HQ Islamabad. 
Duration : 23 December 2013 to Present 
Key Responsibilities : 
? Working as BSS Engineer 
? Commissioning of outdoor BTS SDR BS8900 
? Switch (VLAN) configuration 
? EISU configuration ZXM10 
? Provisional Acceptance Test (PAT) of Equipments with operator (PTCL). 
? Complete testing of systems ( Power, DRS link, EVDO services, 1x services and 
civil work quality check) 
? Throughing media from OFS to BTS through multiple links. 
? CDMA spare management. 
? CDMA site maintenance for Level 1,2 and 3 faults. 
? Working as RF Engineer. 
? Use of ZTE UniPOS CNP in 4G LTE and 3G CDMA Projects for site formation, 
Neighbouring and Frequency allocation and Simulation. 
? Hand on experience on Spectrum Analyzer Techtronics Y400. 
? Neighbour Plainning, Parameter Planning, PN Planning 
? Post DT Processing in ZXPOX CNA 7.05 for analysis. 
? Single sites and Cluster Optimization reports. 
? Post Processing of log files (both single site and Cluster sites). 
? Network Optimization of new, swapped and clusters sites through Soft and Hard 
parameters. 
? Physical Audit Report 
? Single site and cluster audit proposal ( bearing,MTILT, ETILT, antenna height) 
? RSSI, CDR and HOSR analysis of single and cluster sites 
? Working as Project Coordinator. 
? Office documentation relating CDMA and LTE Projects. 
? Coordination with PM & RPM regarding project documents and maintanance 
issues 
? Coordination with Operator relating Porject Documents (PAT, PAC, BoQ etc). 
? Maintaining record for whole project documents 
? Overall responsible for managing project documentation. 
? Responsible for the integrality and timeliness of document generation and 
archiving. 
OBJECTIVE 
PROJECT HISTORY 
PROFESSIONAL EXPERIENCE
? Labeling and array of document queue by site name or site I.D, keep in difference 
part of works or prepare and stick summary description of each cabinet. 
? CDMA faulty and new spare handling. 
? Coordination with RPM for Level 1,2 and 3 BTS fault handing documentation. 
? Reporting to APM & RPM for daily and weekly updates of poject documents 
? Visiting ZTE and PTCL warehouse for issuance of equipment 
? Coordination with Subcon teams for site installation and commissioning. 
Designation : INSTRUCTOR 
Company : Govt College of Technology, Taxila 
Duration : 03 September 2013 to 31 December 2013 
Key Responsibilities: 
? Following Subjects are assigned during tenure 
? Transmission System 
? Measuring Instruments 
? Construction Practices and Projects 
? Power Plant 
? Office management and documentation. 
Designation : INTERNEE 
Company : PTCL Exchange, Chakwal 
Duration : 17 July, 2012 to 28 August 2012 
Department : Switching 
Designation : SCIENCE TEACHER 
Company : Progressive Model School Chakwal 
Duration : 17 October 2008 to 17 January 2009 
FINAL YEAR PROJECT 
BTS Fuel Optimization 
To secure the fuel from theft on BTS sites, volumetric calculations are made 
by applying Ultrasonic sensors. Microcontroller is programmed to check the 
of status of AC, UPS and generator along with fuel level. This status tells 
whether fuel is being used or not at that time. 
At any time status on the server can be checked which is remotely located 
and connected to BTS site through GSM technology. 
SEMESTER PROJECTS 
? Developed GSM based DC motor 
? Implementation of Channel Coding using MATLAB 
? Implementation of VLAN and inter -VLAN routing using Cisco 
packet tracer . 
? Implemented UWB Dielectric resonator Antenna using HFSS 
? Implemented RADAR Simulation using MATLAB 
? Developed Mobile interface using C++ (Turbo C) 
? Mini projects (Charger, Emergency light, polarity detector ) 
? Res earc h Paper on ¡°W hy Private Sec tors are leading in Pakis tan¡±.
TRAININGS & CERTIFICATIONS 
? CCNA Cisco Certified Network Associate (Year 2013) 
University of Engineering and Technology, Taxila. 
? CAD Computer Aided Drawing (Year 2009) 
University of Engineering and Technology Taxila Sub-Campus Chakwal 
EDUCATION 
? B.Sc Telecom Engineering (CGPA 3.32) 
University of Engineering and Technology, Taxila, (Year 2013) 
? F.Sc Pre-Engineering (80.18%) 
Govt. Degree College, Chakwal, (Year 2009) 
? SSC (81.81%) 
Govt. High School No.1, Chakwal, (Year 2006) 
TECHNICAL SKILLS 
? CNA(ZTE Analyzer tool) for CDMA 2000 1x RTT & EVDO(Rev A& Rev B) 
? CNP(ZTE Planner tool) for LTE and CDMA 
? Google Earth, Global Mapper v12, MapInfo Professional 8.5 SCP, Cisco 
Packet Tracer, Auto CAD, MS OFFICE, MATLAB, Ansoft HFSS, VERILOG 
HDL,C++ (Turbo C), PSPISE and Orcade 
PERSONAL INFORMATION 
Father Name : Muhammad Akbar 
Birth Date : 29 May, 1989 
Domicile : Chakwal 
Province : Punjab 
Nationali ty : Pakistani

More Related Content

CV_ASIM_11_2014

  • 1. Muhammad Asim Akbar Contact No: +92-322- 5115160 e-mail: asim_live09@yahoo.com House# DK 525-526, Dhoke Paracha, Rawalpindi, Pakistan. To work in a dynamic organization to enhance my exposure to practical work and polish my Technical and Communication skills ? ZTE 4G LTE ? ZTE 3G CDMA Designation : Engineer Company : ZTE HQ Islamabad. Duration : 23 December 2013 to Present Key Responsibilities : ? Working as BSS Engineer ? Commissioning of outdoor BTS SDR BS8900 ? Switch (VLAN) configuration ? EISU configuration ZXM10 ? Provisional Acceptance Test (PAT) of Equipments with operator (PTCL). ? Complete testing of systems ( Power, DRS link, EVDO services, 1x services and civil work quality check) ? Throughing media from OFS to BTS through multiple links. ? CDMA spare management. ? CDMA site maintenance for Level 1,2 and 3 faults. ? Working as RF Engineer. ? Use of ZTE UniPOS CNP in 4G LTE and 3G CDMA Projects for site formation, Neighbouring and Frequency allocation and Simulation. ? Hand on experience on Spectrum Analyzer Techtronics Y400. ? Neighbour Plainning, Parameter Planning, PN Planning ? Post DT Processing in ZXPOX CNA 7.05 for analysis. ? Single sites and Cluster Optimization reports. ? Post Processing of log files (both single site and Cluster sites). ? Network Optimization of new, swapped and clusters sites through Soft and Hard parameters. ? Physical Audit Report ? Single site and cluster audit proposal ( bearing,MTILT, ETILT, antenna height) ? RSSI, CDR and HOSR analysis of single and cluster sites ? Working as Project Coordinator. ? Office documentation relating CDMA and LTE Projects. ? Coordination with PM & RPM regarding project documents and maintanance issues ? Coordination with Operator relating Porject Documents (PAT, PAC, BoQ etc). ? Maintaining record for whole project documents ? Overall responsible for managing project documentation. ? Responsible for the integrality and timeliness of document generation and archiving. OBJECTIVE PROJECT HISTORY PROFESSIONAL EXPERIENCE
  • 2. ? Labeling and array of document queue by site name or site I.D, keep in difference part of works or prepare and stick summary description of each cabinet. ? CDMA faulty and new spare handling. ? Coordination with RPM for Level 1,2 and 3 BTS fault handing documentation. ? Reporting to APM & RPM for daily and weekly updates of poject documents ? Visiting ZTE and PTCL warehouse for issuance of equipment ? Coordination with Subcon teams for site installation and commissioning. Designation : INSTRUCTOR Company : Govt College of Technology, Taxila Duration : 03 September 2013 to 31 December 2013 Key Responsibilities: ? Following Subjects are assigned during tenure ? Transmission System ? Measuring Instruments ? Construction Practices and Projects ? Power Plant ? Office management and documentation. Designation : INTERNEE Company : PTCL Exchange, Chakwal Duration : 17 July, 2012 to 28 August 2012 Department : Switching Designation : SCIENCE TEACHER Company : Progressive Model School Chakwal Duration : 17 October 2008 to 17 January 2009 FINAL YEAR PROJECT BTS Fuel Optimization To secure the fuel from theft on BTS sites, volumetric calculations are made by applying Ultrasonic sensors. Microcontroller is programmed to check the of status of AC, UPS and generator along with fuel level. This status tells whether fuel is being used or not at that time. At any time status on the server can be checked which is remotely located and connected to BTS site through GSM technology. SEMESTER PROJECTS ? Developed GSM based DC motor ? Implementation of Channel Coding using MATLAB ? Implementation of VLAN and inter -VLAN routing using Cisco packet tracer . ? Implemented UWB Dielectric resonator Antenna using HFSS ? Implemented RADAR Simulation using MATLAB ? Developed Mobile interface using C++ (Turbo C) ? Mini projects (Charger, Emergency light, polarity detector ) ? Res earc h Paper on ¡°W hy Private Sec tors are leading in Pakis tan¡±.
  • 3. TRAININGS & CERTIFICATIONS ? CCNA Cisco Certified Network Associate (Year 2013) University of Engineering and Technology, Taxila. ? CAD Computer Aided Drawing (Year 2009) University of Engineering and Technology Taxila Sub-Campus Chakwal EDUCATION ? B.Sc Telecom Engineering (CGPA 3.32) University of Engineering and Technology, Taxila, (Year 2013) ? F.Sc Pre-Engineering (80.18%) Govt. Degree College, Chakwal, (Year 2009) ? SSC (81.81%) Govt. High School No.1, Chakwal, (Year 2006) TECHNICAL SKILLS ? CNA(ZTE Analyzer tool) for CDMA 2000 1x RTT & EVDO(Rev A& Rev B) ? CNP(ZTE Planner tool) for LTE and CDMA ? Google Earth, Global Mapper v12, MapInfo Professional 8.5 SCP, Cisco Packet Tracer, Auto CAD, MS OFFICE, MATLAB, Ansoft HFSS, VERILOG HDL,C++ (Turbo C), PSPISE and Orcade PERSONAL INFORMATION Father Name : Muhammad Akbar Birth Date : 29 May, 1989 Domicile : Chakwal Province : Punjab Nationali ty : Pakistani