際際滷

際際滷Share a Scribd company logo
Jared Z. Manzano
Address : Daisy St. Brgy. Inchican, Silang, Cavite
Contact No. : +639239057428
E-mail Adrress : jewzbed_jzm@yahoo.com
CAREER OBJECTIVE:
To secure a challenging position where I can effectively contribute my talent and skills, and enabling me to
grow while meeting the corporations goals.
SUMMARY OF QUALIFICATIONS
 RND
 Conduct RF survey for new sites.
 Coverage plot for BTS antenna.
 Conducts site survey, (LOS) line of sight for Microwave Radio Transmission System for new and
existing sites.
 Conduct Radio Frequency Interference (RFI) Investigation.
 Collecting Stats using F-Secure (SSH Client)
 Collect CDD and MO
 Conduct Drive Test
 Process Log Files using TEMS Discovery
 Responsible in Tilting of BTS antenna
 Knowledge in basic Optimization
 Preparing RF acceptance report
 Prepare Cell Data Design (CDD) for new sites
 Experience in using TCPU (Plotting)
EMPLOYMENT HISTORY:
October 2007 to February 2014 MCS Construction and Development Corp.
February 2014 to Present TPS Builders Inc.
PROJECT INVOLVED:
1. Ericsson / SMC Project  PAMBATS (August 2014  Present)
TPS Builders Inc.
RF Engineer
Responsibilities:
 Conduct survey for RF data.
 Proposed BTS Orientation during survey.
 Prepare TSSR.
 Lay out Asbuilt Photos.
 Plot RF Coverage using Atool Software.
2. Ericsson / SMC Project  NCR (November 2013  Present)
TPS Builders Inc.
RF Engineer
Responsibilities:
 Conduct survey for RF data.
 Proposed BTS Orientation during survey.
 Prepare TSSR.
 Lay out Asbuilt Photos.
 Plot RF Coverage using Atool Software.
3. Ericsson / Smart Phase 1 Project  North Luzon (September 2011  November 2013)
MCS Construction and Development Corporation
Responsibilities:
 Prepare RF Acceptance Report
 Conduct Functionality
 Drive tester / Coordinate to Smart ROMC and ENP/RND about Drive test
 Preparing Drive test Report
 Uptilt / Downtilt of BTS antenna
 Preparing CDD for new sites / Assigns TG
 Coordinate to ENP and Telecom Installer about RBLT assignment
 Planning Antenna Orientation
 Conduct RFI (Radio Frequency Interference)
 Site Justification
 RND (Radio Network Design)
4. Ericsson / Digitel Phase 8B Project  VisMin (March 2010  May 2011) Ericsson Base
MCS Construction and Development Corporation
Responsibilities:
 Prepare RF Acceptance Report
 Collect Stats per BSC and KPI results per site
 Dump CDD & MO
 Responsible in plotting using TCPU
 Drive tester
 Prepare CDD for new sites
5. Ericsson / Digitel Phase 8A Project  VisMin (November 2008  February 2010)
MCS Construction and Development Corporation
Responsibilities:
 Documentation
 Prepare General Mux plan, Individual Mux Plan
 Conduct Radio Frequency Interference (RFI)
 Update NET plan and NMS plan
6. Globe Phase 14 Capacity and Coverage Enhancement Program (March 2008  April 2010)
MCS Construction and Development Corporation
Responsibilities:
 Prepare survey report for new site and Link-up site
 Coordinate with site Engineer regarding punchlist
 Prepare documents for FAC
7. Globe Phase 13 Capacity and Coverage Enhancement Program (June 2007  March 2010)
MCS Construction and Development Corporation
Responsibilities:
 Prepare Survey report for new site and Link-up site
 Coordinate with site Engineer regarding punchlist
 Prepare documents for FAC
 Conduct survey for link-up site
 Programming and Testing of Environmental Alarm System (EAS)
8. DMPI GSM 1800 PHASE 6A PROJECT (April 2006  May 2008)
MCS Construction and Development Corporation
Responsibilities:
 Prepare Civil and Telecom Works Documents
 Prepare documents for FAC
June  August 2007 On - the - Job Trainee - MCS Construction and Development Corp.
September  October 2007 On - the  Job Trainee  Sports Radio (DZSR)
WORKSHOP & SEMINAR ATTENDED:
1. RBS 3206 and RBS 3418 BASIC
INSTALLATION, TESTING and
COMMISSIONING
Conducted by: Yves Rilloraza & Robenald
Ganace
Training Officer
April 20, 2009
7/F NetSquare 3rd
Avenue, cor. 28th
Crescent
Park West
Bonifacio Global City 1634
Taguig Metro Manila, Philippines
2. MINI-LINK TN R4 O&M
Conducted by: Cecille R. Basera
Training Officer
Ericsson Education
Philippines
June 5, 6, 8, 2009
20/F NetSquare 3rd
Avenue, cor. 28th
Crescent
Park West
Bonifacio Global City 1634
Taguig Metro Manila, Philippines
3. Workshop / Orientation: Upgrade / Downgrade
and Trouble Shooting
Conducted by: Albert Madriaga
RAN (Head Implementation) April 20, 2009
20/F NetSquare 3rd
Avenue, cor. 28th
Crescent Park
West Bonifacio Global City 1634 Taguig Metro Manila,
Philippines
4. TVSS INSTALLATION
Conducted by:
FMIDC
February 23, 2009
5/F BPI Buendia Center Bldg.
Gil Puyat Ave. Makati City
5. ENVIRONMENTAL ALARM SYSTEM
Actual Training and Seminar
Conducted by: Eric Amparo
Head Engineering Dept.
Alarm System Corporation
June 19, 2008
PASIG BLVD. EXTENSION Globe Phase 13
Cellsite, 390 Dr. Sixto Antonio Ave., Maybunga,
Pasig City
ORGANIZATION
 Member, Philippines Public Safety and Order Support Group (PPSOSG)
Rank  Chief Supervisor
September 2012 - Present
EDUCATIONAL BACKGROUND
College : University of Antique 2002 - 2007
Sibalom, Antique
BSECE
Secondary : Polytechnic State College of Antique 1998 - 2002
Sibalom, Antique
PERSONAL INFORMATION
Birth Date: January 9, 1985
Citizenship: Filipino
Birth Place: Sibalom, Antique
Age: 31 yrs. Old
Gender: Male
Civil Status: Married
Height: 53
Weight: 139 lbs.
Present Address: Daisy St. Brgy. Inchican, Silang, Cavite
Nationality: Filipino
Language: English, Pilipino, Kinaray-a, Ilonggo
Education: Polytechnic State College of Antique
Bachelor of Science in Electronics and Communications Engineering
Batch 2007
CHARACTER REFERENCE
Rona Jane Santos Beato
Project Manager
TPS Builders Inc.
1404 Galleria Corporate Center Edsa Cor. Ortigas Ave. Quezon City.
Contact info E-mail: diane_03jane@yahoo.com.ph
Mobile no. PH +63 999 992 9752
Dr. Israel N. Virgines, LIB, MBA, Phd , Lt. Col.
Director
Philippine Public Safety and Order Support Group
KM. 50 Aguinaldo Highway, Lalaan 2, Silang, Cavite, 4118
Mobile : 0923-9844-603
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
Jared Z. Manzano
Applicant

More Related Content

What's hot (20)

Odediran david adewale_resume
Odediran david adewale_resumeOdediran david adewale_resume
Odediran david adewale_resume
Adewale Odediran
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
Aslam Fahmi
RF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docxRF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docx
Monsuru Okekunle
Resume_(2)
Resume_(2)Resume_(2)
Resume_(2)
Vengatesh Prabhu
SKernan Telecommunications Technician
SKernan Telecommunications TechnicianSKernan Telecommunications Technician
SKernan Telecommunications Technician
Scott Kernan
cv2016
cv2016cv2016
cv2016
Neil Westerman
James Barker Resume Rev11.19.15
James Barker Resume Rev11.19.15James Barker Resume Rev11.19.15
James Barker Resume Rev11.19.15
James Barker
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
sunil Saini
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
Ahmad Hedib
Tasev, Risto Chris - January 2016
Tasev, Risto Chris - January 2016Tasev, Risto Chris - January 2016
Tasev, Risto Chris - January 2016
Risto, (Chris) Tasev PEng.
Resume_RF_Engineer
Resume_RF_EngineerResume_RF_Engineer
Resume_RF_Engineer
subodh shishodia
Arnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF OptimizationArnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF Optimization
Arnab Ganguly
Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16
Abhishek Anand
Ahmet_Ondortoglu Resume
Ahmet_Ondortoglu ResumeAhmet_Ondortoglu Resume
Ahmet_Ondortoglu Resume
Ahmet Ondortoglu
Mr Kong DeSheng CV Up to Now
Mr Kong DeSheng CV   Up to NowMr Kong DeSheng CV   Up to Now
Mr Kong DeSheng CV Up to Now
Desheng Kong
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
Marvani M. GT Estrella
Cris Jayson Baluyut CV
Cris Jayson Baluyut CVCris Jayson Baluyut CV
Cris Jayson Baluyut CV
Cris Jayson Baluyut
Blocker cv 2012-12-15
Blocker cv 2012-12-15Blocker cv 2012-12-15
Blocker cv 2012-12-15
efb112763
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
Mydel Berdin
Sandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_ExpSandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_Exp
Sandeep Maurya
Odediran david adewale_resume
Odediran david adewale_resumeOdediran david adewale_resume
Odediran david adewale_resume
Adewale Odediran
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
Aslam Fahmi
RF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docxRF Optimization Engineer Resume.docx
RF Optimization Engineer Resume.docx
Monsuru Okekunle
SKernan Telecommunications Technician
SKernan Telecommunications TechnicianSKernan Telecommunications Technician
SKernan Telecommunications Technician
Scott Kernan
James Barker Resume Rev11.19.15
James Barker Resume Rev11.19.15James Barker Resume Rev11.19.15
James Barker Resume Rev11.19.15
James Barker
Sunil saini rf engineer updated resume
Sunil saini rf engineer updated resumeSunil saini rf engineer updated resume
Sunil saini rf engineer updated resume
sunil Saini
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
Ahmad Hedib
Arnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF OptimizationArnab-Ganguly cv RF Optimization
Arnab-Ganguly cv RF Optimization
Arnab Ganguly
Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16
Abhishek Anand
Ahmet_Ondortoglu Resume
Ahmet_Ondortoglu ResumeAhmet_Ondortoglu Resume
Ahmet_Ondortoglu Resume
Ahmet Ondortoglu
Mr Kong DeSheng CV Up to Now
Mr Kong DeSheng CV   Up to NowMr Kong DeSheng CV   Up to Now
Mr Kong DeSheng CV Up to Now
Desheng Kong
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
Marvani M. GT Estrella
Blocker cv 2012-12-15
Blocker cv 2012-12-15Blocker cv 2012-12-15
Blocker cv 2012-12-15
efb112763
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
Mydel Berdin
Sandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_ExpSandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_Exp
Sandeep Maurya

Viewers also liked (18)

Schoology
SchoologySchoology
Schoology
Sara Brooks
RSW TECHNOLOGY
RSW TECHNOLOGYRSW TECHNOLOGY
RSW TECHNOLOGY
RSW Technology
Philinter brochure 2013
Philinter brochure 2013Philinter brochure 2013
Philinter brochure 2013
unleash alba
Solana vista pp final
Solana vista pp finalSolana vista pp final
Solana vista pp final
Steve Huffman
Comm201 presentation dewar
Comm201 presentation dewarComm201 presentation dewar
Comm201 presentation dewar
Tristen Dewar
Mobile Marketing Techniques to Jumpstart your Business
Mobile Marketing Techniques to Jumpstart your BusinessMobile Marketing Techniques to Jumpstart your Business
Mobile Marketing Techniques to Jumpstart your Business
Michelle Hummel
View
ViewView
View
Brijesh Chaudhary
Philosophy
PhilosophyPhilosophy
Philosophy
Protip Bose
Mate3Mate3
Mate3
Lacey De la Oliva
Premiazione 2014 I.C., S.M.S. e Scuole Elementari
Premiazione 2014 I.C., S.M.S. e Scuole ElementariPremiazione 2014 I.C., S.M.S. e Scuole Elementari
Premiazione 2014 I.C., S.M.S. e Scuole Elementari
allfrct
Nang at ng
Nang at ngNang at ng
Nang at ng
Jik Bucol
Taules estad鱈stiques -738 (1)
Taules estad鱈stiques -738 (1)Taules estad鱈stiques -738 (1)
Taules estad鱈stiques -738 (1)
Manuel Benito
Chapter 2-beginning-spatial-with-sql-server-2008-pt-i
Chapter 2-beginning-spatial-with-sql-server-2008-pt-iChapter 2-beginning-spatial-with-sql-server-2008-pt-i
Chapter 2-beginning-spatial-with-sql-server-2008-pt-i
Juber Palomino Campos
Discover the Mircom FleX-Net system
Discover the Mircom FleX-Net systemDiscover the Mircom FleX-Net system
Discover the Mircom FleX-Net system
Michael Baker
Philinter brochure with adjustment layout
Philinter brochure with adjustment layoutPhilinter brochure with adjustment layout
Philinter brochure with adjustment layout
unleash alba
Autohelp Presentation
Autohelp PresentationAutohelp Presentation
Autohelp Presentation
Stanislav Fadeyev
Veh des portfolio v3
Veh des portfolio v3Veh des portfolio v3
Veh des portfolio v3
Jon Albert
Philinter brochure 2013
Philinter brochure 2013Philinter brochure 2013
Philinter brochure 2013
unleash alba
Solana vista pp final
Solana vista pp finalSolana vista pp final
Solana vista pp final
Steve Huffman
Comm201 presentation dewar
Comm201 presentation dewarComm201 presentation dewar
Comm201 presentation dewar
Tristen Dewar
Mobile Marketing Techniques to Jumpstart your Business
Mobile Marketing Techniques to Jumpstart your BusinessMobile Marketing Techniques to Jumpstart your Business
Mobile Marketing Techniques to Jumpstart your Business
Michelle Hummel
Premiazione 2014 I.C., S.M.S. e Scuole Elementari
Premiazione 2014 I.C., S.M.S. e Scuole ElementariPremiazione 2014 I.C., S.M.S. e Scuole Elementari
Premiazione 2014 I.C., S.M.S. e Scuole Elementari
allfrct
Nang at ng
Nang at ngNang at ng
Nang at ng
Jik Bucol
Taules estad鱈stiques -738 (1)
Taules estad鱈stiques -738 (1)Taules estad鱈stiques -738 (1)
Taules estad鱈stiques -738 (1)
Manuel Benito
Chapter 2-beginning-spatial-with-sql-server-2008-pt-i
Chapter 2-beginning-spatial-with-sql-server-2008-pt-iChapter 2-beginning-spatial-with-sql-server-2008-pt-i
Chapter 2-beginning-spatial-with-sql-server-2008-pt-i
Juber Palomino Campos
Discover the Mircom FleX-Net system
Discover the Mircom FleX-Net systemDiscover the Mircom FleX-Net system
Discover the Mircom FleX-Net system
Michael Baker
Philinter brochure with adjustment layout
Philinter brochure with adjustment layoutPhilinter brochure with adjustment layout
Philinter brochure with adjustment layout
unleash alba
Veh des portfolio v3
Veh des portfolio v3Veh des portfolio v3
Veh des portfolio v3
Jon Albert

Similar to CV_Jared Manzano (20)

CV_Achmad Solah Hudin_15 FEB 2016
CV_Achmad Solah Hudin_15 FEB 2016CV_Achmad Solah Hudin_15 FEB 2016
CV_Achmad Solah Hudin_15 FEB 2016
Achmad Solah Hudin
Reden_CV
Reden_CVReden_CV
Reden_CV
reden caadan
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
swatantra tripathi
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
Anthony Fan
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
Navdeep Thaman
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)
John Greenwood
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
Bharath Rathnam
Resume_Imamshavali Shaik
Resume_Imamshavali ShaikResume_Imamshavali Shaik
Resume_Imamshavali Shaik
Imam Sha vali
Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015
wan azri
My CV
My CVMy CV
My CV
stephen racoma
CV_Febrinaldi
CV_FebrinaldiCV_Febrinaldi
CV_Febrinaldi
febri naldi
CV~Bayu Maindonald20150221
CV~Bayu Maindonald20150221CV~Bayu Maindonald20150221
CV~Bayu Maindonald20150221
Bayu Maindonald
Resume (1)
Resume (1)Resume (1)
Resume (1)
Anil Mehulia
suresh resume
suresh resumesuresh resume
suresh resume
Suresh sekar
CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
Yudi Syah Putra
Curriculum vitae_Anas Ijaz
Curriculum vitae_Anas IjazCurriculum vitae_Anas Ijaz
Curriculum vitae_Anas Ijaz
Anas Ijaz
Rassell Domnic Go - updated
Rassell Domnic Go - updatedRassell Domnic Go - updated
Rassell Domnic Go - updated
Rassell Domnic Go
CV K
CV KCV K
CV K
Yvon kalombo
resume
resumeresume
resume
VIMAL KUMAR CHENGALVARAYAN
Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari
Fidri Hultari
CV_Achmad Solah Hudin_15 FEB 2016
CV_Achmad Solah Hudin_15 FEB 2016CV_Achmad Solah Hudin_15 FEB 2016
CV_Achmad Solah Hudin_15 FEB 2016
Achmad Solah Hudin
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
swatantra tripathi
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
Anthony Fan
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
Navdeep Thaman
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)
John Greenwood
Resume_Imamshavali Shaik
Resume_Imamshavali ShaikResume_Imamshavali Shaik
Resume_Imamshavali Shaik
Imam Sha vali
Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015
wan azri
CV_Febrinaldi
CV_FebrinaldiCV_Febrinaldi
CV_Febrinaldi
febri naldi
CV~Bayu Maindonald20150221
CV~Bayu Maindonald20150221CV~Bayu Maindonald20150221
CV~Bayu Maindonald20150221
Bayu Maindonald
CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
Yudi Syah Putra
Curriculum vitae_Anas Ijaz
Curriculum vitae_Anas IjazCurriculum vitae_Anas Ijaz
Curriculum vitae_Anas Ijaz
Anas Ijaz
Rassell Domnic Go - updated
Rassell Domnic Go - updatedRassell Domnic Go - updated
Rassell Domnic Go - updated
Rassell Domnic Go
Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari Curriculum Vitae Fidri Hultari
Curriculum Vitae Fidri Hultari
Fidri Hultari

CV_Jared Manzano

  • 1. Jared Z. Manzano Address : Daisy St. Brgy. Inchican, Silang, Cavite Contact No. : +639239057428 E-mail Adrress : jewzbed_jzm@yahoo.com CAREER OBJECTIVE: To secure a challenging position where I can effectively contribute my talent and skills, and enabling me to grow while meeting the corporations goals. SUMMARY OF QUALIFICATIONS RND Conduct RF survey for new sites. Coverage plot for BTS antenna. Conducts site survey, (LOS) line of sight for Microwave Radio Transmission System for new and existing sites. Conduct Radio Frequency Interference (RFI) Investigation. Collecting Stats using F-Secure (SSH Client) Collect CDD and MO Conduct Drive Test Process Log Files using TEMS Discovery Responsible in Tilting of BTS antenna Knowledge in basic Optimization Preparing RF acceptance report Prepare Cell Data Design (CDD) for new sites Experience in using TCPU (Plotting) EMPLOYMENT HISTORY: October 2007 to February 2014 MCS Construction and Development Corp. February 2014 to Present TPS Builders Inc. PROJECT INVOLVED: 1. Ericsson / SMC Project PAMBATS (August 2014 Present) TPS Builders Inc. RF Engineer Responsibilities: Conduct survey for RF data. Proposed BTS Orientation during survey. Prepare TSSR. Lay out Asbuilt Photos. Plot RF Coverage using Atool Software. 2. Ericsson / SMC Project NCR (November 2013 Present) TPS Builders Inc. RF Engineer Responsibilities:
  • 2. Conduct survey for RF data. Proposed BTS Orientation during survey. Prepare TSSR. Lay out Asbuilt Photos. Plot RF Coverage using Atool Software. 3. Ericsson / Smart Phase 1 Project North Luzon (September 2011 November 2013) MCS Construction and Development Corporation Responsibilities: Prepare RF Acceptance Report Conduct Functionality Drive tester / Coordinate to Smart ROMC and ENP/RND about Drive test Preparing Drive test Report Uptilt / Downtilt of BTS antenna Preparing CDD for new sites / Assigns TG Coordinate to ENP and Telecom Installer about RBLT assignment Planning Antenna Orientation Conduct RFI (Radio Frequency Interference) Site Justification RND (Radio Network Design) 4. Ericsson / Digitel Phase 8B Project VisMin (March 2010 May 2011) Ericsson Base MCS Construction and Development Corporation Responsibilities: Prepare RF Acceptance Report Collect Stats per BSC and KPI results per site Dump CDD & MO Responsible in plotting using TCPU Drive tester Prepare CDD for new sites 5. Ericsson / Digitel Phase 8A Project VisMin (November 2008 February 2010) MCS Construction and Development Corporation Responsibilities: Documentation Prepare General Mux plan, Individual Mux Plan Conduct Radio Frequency Interference (RFI) Update NET plan and NMS plan 6. Globe Phase 14 Capacity and Coverage Enhancement Program (March 2008 April 2010) MCS Construction and Development Corporation Responsibilities: Prepare survey report for new site and Link-up site Coordinate with site Engineer regarding punchlist Prepare documents for FAC 7. Globe Phase 13 Capacity and Coverage Enhancement Program (June 2007 March 2010) MCS Construction and Development Corporation Responsibilities:
  • 3. Prepare Survey report for new site and Link-up site Coordinate with site Engineer regarding punchlist Prepare documents for FAC Conduct survey for link-up site Programming and Testing of Environmental Alarm System (EAS) 8. DMPI GSM 1800 PHASE 6A PROJECT (April 2006 May 2008) MCS Construction and Development Corporation Responsibilities: Prepare Civil and Telecom Works Documents Prepare documents for FAC June August 2007 On - the - Job Trainee - MCS Construction and Development Corp. September October 2007 On - the Job Trainee Sports Radio (DZSR) WORKSHOP & SEMINAR ATTENDED: 1. RBS 3206 and RBS 3418 BASIC INSTALLATION, TESTING and COMMISSIONING Conducted by: Yves Rilloraza & Robenald Ganace Training Officer April 20, 2009 7/F NetSquare 3rd Avenue, cor. 28th Crescent Park West Bonifacio Global City 1634 Taguig Metro Manila, Philippines 2. MINI-LINK TN R4 O&M Conducted by: Cecille R. Basera Training Officer Ericsson Education Philippines June 5, 6, 8, 2009 20/F NetSquare 3rd Avenue, cor. 28th Crescent Park West Bonifacio Global City 1634 Taguig Metro Manila, Philippines 3. Workshop / Orientation: Upgrade / Downgrade and Trouble Shooting Conducted by: Albert Madriaga RAN (Head Implementation) April 20, 2009 20/F NetSquare 3rd Avenue, cor. 28th Crescent Park West Bonifacio Global City 1634 Taguig Metro Manila, Philippines 4. TVSS INSTALLATION Conducted by: FMIDC February 23, 2009 5/F BPI Buendia Center Bldg. Gil Puyat Ave. Makati City 5. ENVIRONMENTAL ALARM SYSTEM Actual Training and Seminar Conducted by: Eric Amparo Head Engineering Dept. Alarm System Corporation June 19, 2008 PASIG BLVD. EXTENSION Globe Phase 13 Cellsite, 390 Dr. Sixto Antonio Ave., Maybunga, Pasig City
  • 4. ORGANIZATION Member, Philippines Public Safety and Order Support Group (PPSOSG) Rank Chief Supervisor September 2012 - Present EDUCATIONAL BACKGROUND College : University of Antique 2002 - 2007 Sibalom, Antique BSECE Secondary : Polytechnic State College of Antique 1998 - 2002 Sibalom, Antique PERSONAL INFORMATION Birth Date: January 9, 1985 Citizenship: Filipino Birth Place: Sibalom, Antique Age: 31 yrs. Old Gender: Male Civil Status: Married Height: 53 Weight: 139 lbs. Present Address: Daisy St. Brgy. Inchican, Silang, Cavite Nationality: Filipino Language: English, Pilipino, Kinaray-a, Ilonggo Education: Polytechnic State College of Antique Bachelor of Science in Electronics and Communications Engineering Batch 2007 CHARACTER REFERENCE Rona Jane Santos Beato Project Manager TPS Builders Inc. 1404 Galleria Corporate Center Edsa Cor. Ortigas Ave. Quezon City. Contact info E-mail: diane_03jane@yahoo.com.ph Mobile no. PH +63 999 992 9752 Dr. Israel N. Virgines, LIB, MBA, Phd , Lt. Col. Director Philippine Public Safety and Order Support Group KM. 50 Aguinaldo Highway, Lalaan 2, Silang, Cavite, 4118 Mobile : 0923-9844-603 I hereby certify that the above information is true and correct to the best of my knowledge and belief. Jared Z. Manzano Applicant