Leighton Qatar  Al Jaber Engineering JV
Leighton Qatar  Al Jaber Engineering JV
NEW ORBITAL HIGHWAY CONTRACT 3
Leighton Qatar  Al Jaber Engineering JV
NEW ORBITAL HIGHWAY CONTRACT 3
Junction 7
2*5 (2+3) Main Bridges:
700m total length,
16 spans,
2 Ramp Bridges:
1 450m total length,
35 spans,
Leighton Qatar  Al Jaber Engineering JV
NEW ORBITAL HIGHWAY CONTRACT 3
2 Ramp Bridges:
780m total length,
18 spans,
Junction 8
Leighton Qatar  Al Jaber Engineering JV
NEW ORBITAL HIGHWAY CONTRACT 3
2*6 (3+3) Main Bridges:
620m total length,
16 spans,
2 Ramp Bridges:
1 400m total length,
34 spans,
Junction 9
Leighton Qatar  Al Jaber Engineering JV
Junction 10
2 *1 Main Bridges:
260m total length,
8 spans,
2 Ramp Bridges:
1 280m total length,
33 spans,
Leighton Qatar  Al Jaber Engineering JV
Junction 11
2 *2 (3+3) Main Bridges:
520m total length,
16 spans,
Leighton Qatar  Al Jaber Engineering JV
Ramp Bridges Typical Details
Plan, Elevation and Cross section of typical module (Junction 7)
Constant width (13.60m) and
constant depth (2.60m) for
all ramp bridge boxes
Weight between 55 & 87tons
Leighton Qatar  Al Jaber Engineering JV
Main Bridges Typical Details
Segments stitched together transversely to
create varying widths required for each Main
Bridge
Constant width (7,00m) and
constant depth (2.35m) for all
main bridge boxes
Weight between 48 & 69 tons
Plan, Elevation and Cross section of typical module (Junction 9)
Leighton Qatar  Al Jaber Engineering JV
Precast Yard Location
Leighton Qatar  Al Jaber Engineering JV
Precast Yard Decomposition
PRODUCTIONDIRECTION
REBAR AREA
CASTING AREA
FINISHING AREA
STORAGE AREA
Leighton Qatar  Al Jaber Engineering JV
Stage of Precasting
oRebar  Cage Assembly
oSegment Casting & Curing
oSegment Finishing
oSegment Storage
Leighton Qatar  Al Jaber Engineering JV
WHAT IS NEEDED?
 Materials
 Manpower
Special Team for Civil & PT Works
 Rebar & Formwork Shop Drawing
 Equipment:
Gantry Crane 100t 3u
Tower Crane 8,2t @ 40m 2u
Regar Jig 8u* 3 lines
Rebar-Cage Lifting Beam
Segment Steel Skeleton
Leighton Qatar  Al Jaber Engineering JV
Segment Casting & Curing
1. Rebar  Cage Positioning in
Casting cell
2. Adjustment cover, insert,
opening PT items,
3. Close Formwork,
4. Order & Delivery of Concrete,
5. Concrete placement,
6. Curing Compound:
a) 12 hours water curing,
b) After 12 hours Application of
Curing Compound application,
7. Stripping Formwork after12
hours  shift mash-cast
segment with manipulator,
8. After 36hours lifting Segment,
Leighton Qatar  Al Jaber Engineering JV
Segment Finishing
1. Curing Compound
application on Segment
Bottom Slab,
2. Segment Finishing,
3. Segment lifting,
Leighton Qatar  Al Jaber Engineering JV
Segment Storage
1. Segment Storage,
2 layers,
2. Storage 28days,
3. Segment Lifting to
trailer for erection
site,
Leighton Qatar  Al Jaber Engineering JV
Precast Yard  Moulds & Production Rate
Moulds
Ramp Bridges: 1 434 Segments
 No. of Moulds = 8
 6 Field Segments + 1 Pier + 1 Expansion Joint
For all Casting Cells the installation & commissioning are done
Main Bridges: 846 Segments
 No of Moulds = 5
 2 Field Segment + 1 Deviator + 1 Pier + 1 Expansion Joint
1 Field Segment casting cell Installation & commissioning done
The other casting cells the installation is ongoing
Production Rate:
Field and Deviator segment = 1 segment per mould per day 9 Segments/Day
Pier and Expansion Joint = 1 segment per mould every 2 days 2 Segments/Day
Transportation of Segments:
Ramp Bridges:
 6 Trucks * 2 trips/ day by 2 shifts 24 Segments/Day
Main Bridges:
 6 Trucks * 2 trips / day 12 Segments/Day
Leighton Qatar  Al Jaber Engineering JV
Erection Segments  Ramps Bridges
Segments are transported one by one to site and lifted to their final position.
This erection process will involve:
1.Lifting the segment off the transport truck using special equipment or crane to place them to their
final position in the superstructure.
2.Temporarily hanging or supporting the segment from temporary works
3.Once all the segments are in the final position, they are joined and post-stressed to form the
permanent monolithic superstructure
For NOH Contract 3 - The most effective method to construct the ramps with precast segments is to
use the:
Span by Span Method with an Underslung Launching Gantry
The first launching girder is under delivery at Ramp Bridges Junction 8
The second are under fabrication delivery planned before the end of this year
.
Leighton Qatar  Al Jaber Engineering JV
Erection Sequence  Ramps Bridges
Launching Gantry
Underslung
Precast segments
Typical span by span erection with
Underslung Launching Gantry
And crawler cranes 2 units of 220tns
Supplier of Crawler Crane AERTSSEN
Production Rate: 2,5 days by span
Leighton Qatar  Al Jaber Engineering JV
Erection Sequence  Ramps Bridges
Leighton Qatar  Al Jaber Engineering JV
Erection Sequence  Main Bridges
Segment placement by use of
crawler cranes of 200 tons
Main Bridge Erection
works on Falsework
Production Rate: 5 days by line
Leighton Qatar  Al Jaber Engineering JV
Erection Sequence  Main Bridges
Erection over Salwa Road with 2 x Portals
Leighton Qatar  Al Jaber Engineering JV
NEW ORBITAL HIGHWAY CONTRACT 3
Thank you for yourThank you for your
attentionattention

More Related Content

What's hot (18)

Project details
Project detailsProject details
Project details
Sunil Das
CURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir BagioCURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir Bagio
NASIR BAGIO
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
Vedam design & Techincal Consultancy Pvt Ltd.
MOHD NAZRUL CV
MOHD NAZRUL CVMOHD NAZRUL CV
MOHD NAZRUL CV
nazrul razak
Container terminal handling equipment
Container terminal handling equipmentContainer terminal handling equipment
Container terminal handling equipment
Ahmed Tohamy
SHIP PHOTO
SHIP PHOTOSHIP PHOTO
SHIP PHOTO
sabhajit yadav
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
Hank Rawlins
QP_Presentation_20151027
QP_Presentation_20151027QP_Presentation_20151027
QP_Presentation_20151027
Ian Kelly
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
Vedam design & Techincal Consultancy Pvt Ltd.
Curriculum Vita Of Moeed Bin Saeed
Curriculum Vita Of Moeed Bin SaeedCurriculum Vita Of Moeed Bin Saeed
Curriculum Vita Of Moeed Bin Saeed
Moeed Saeed
RusselSmith Group Service Portfolio
RusselSmith Group Service PortfolioRusselSmith Group Service Portfolio
RusselSmith Group Service Portfolio
Ryan Gillespie
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel isiwu
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
Vedam design & Techincal Consultancy Pvt Ltd.
Syed Waqar Ali Shah
Syed Waqar Ali ShahSyed Waqar Ali Shah
Syed Waqar Ali Shah
waqar kazmi
Papilla Company Introduction
Papilla Company IntroductionPapilla Company Introduction
Papilla Company Introduction
Mohd Rizalman
Psn resume
Psn   resume Psn   resume
Psn resume
PramodShankarNair
selfcv NEw
selfcv NEwselfcv NEw
selfcv NEw
Bhaskar Bhattacharjee
BMT VESSEL DESIGN PORTFOLIO
BMT VESSEL DESIGN PORTFOLIOBMT VESSEL DESIGN PORTFOLIO
BMT VESSEL DESIGN PORTFOLIO
Ralph Duncan, P.E.
Project details
Project detailsProject details
Project details
Sunil Das
CURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir BagioCURRICULUM VITAE Nasir Bagio
CURRICULUM VITAE Nasir Bagio
NASIR BAGIO
Container terminal handling equipment
Container terminal handling equipmentContainer terminal handling equipment
Container terminal handling equipment
Ahmed Tohamy
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
Hank Rawlins
QP_Presentation_20151027
QP_Presentation_20151027QP_Presentation_20151027
QP_Presentation_20151027
Ian Kelly
Curriculum Vita Of Moeed Bin Saeed
Curriculum Vita Of Moeed Bin SaeedCurriculum Vita Of Moeed Bin Saeed
Curriculum Vita Of Moeed Bin Saeed
Moeed Saeed
RusselSmith Group Service Portfolio
RusselSmith Group Service PortfolioRusselSmith Group Service Portfolio
RusselSmith Group Service Portfolio
Ryan Gillespie
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel isiwu
Syed Waqar Ali Shah
Syed Waqar Ali ShahSyed Waqar Ali Shah
Syed Waqar Ali Shah
waqar kazmi
Papilla Company Introduction
Papilla Company IntroductionPapilla Company Introduction
Papilla Company Introduction
Mohd Rizalman
BMT VESSEL DESIGN PORTFOLIO
BMT VESSEL DESIGN PORTFOLIOBMT VESSEL DESIGN PORTFOLIO
BMT VESSEL DESIGN PORTFOLIO
Ralph Duncan, P.E.

Similar to DATA2015-12-06 Ashghal Presentation 2 (6)

Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
mukul srivastava
Segmental bridge constructin techniques
Segmental bridge constructin techniquesSegmental bridge constructin techniques
Segmental bridge constructin techniques
jose bonifacio de souza leite cuadros
Viaduct
Viaduct Viaduct
Viaduct
Dincer Dogan
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
Sravan Kumar
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridges
Civil Engineers
Rohleder_presentation.pdf
Rohleder_presentation.pdfRohleder_presentation.pdf
Rohleder_presentation.pdf
walid691760
Precast segmental construction of bridges
Precast segmental construction of bridgesPrecast segmental construction of bridges
Precast segmental construction of bridges
mukul srivastava
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
Sravan Kumar
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridges
Civil Engineers
Rohleder_presentation.pdf
Rohleder_presentation.pdfRohleder_presentation.pdf
Rohleder_presentation.pdf
walid691760

DATA2015-12-06 Ashghal Presentation 2

  • 1. Leighton Qatar Al Jaber Engineering JV
  • 2. Leighton Qatar Al Jaber Engineering JV NEW ORBITAL HIGHWAY CONTRACT 3
  • 3. Leighton Qatar Al Jaber Engineering JV NEW ORBITAL HIGHWAY CONTRACT 3 Junction 7 2*5 (2+3) Main Bridges: 700m total length, 16 spans, 2 Ramp Bridges: 1 450m total length, 35 spans,
  • 4. Leighton Qatar Al Jaber Engineering JV NEW ORBITAL HIGHWAY CONTRACT 3 2 Ramp Bridges: 780m total length, 18 spans, Junction 8
  • 5. Leighton Qatar Al Jaber Engineering JV NEW ORBITAL HIGHWAY CONTRACT 3 2*6 (3+3) Main Bridges: 620m total length, 16 spans, 2 Ramp Bridges: 1 400m total length, 34 spans, Junction 9
  • 6. Leighton Qatar Al Jaber Engineering JV Junction 10 2 *1 Main Bridges: 260m total length, 8 spans, 2 Ramp Bridges: 1 280m total length, 33 spans,
  • 7. Leighton Qatar Al Jaber Engineering JV Junction 11 2 *2 (3+3) Main Bridges: 520m total length, 16 spans,
  • 8. Leighton Qatar Al Jaber Engineering JV Ramp Bridges Typical Details Plan, Elevation and Cross section of typical module (Junction 7) Constant width (13.60m) and constant depth (2.60m) for all ramp bridge boxes Weight between 55 & 87tons
  • 9. Leighton Qatar Al Jaber Engineering JV Main Bridges Typical Details Segments stitched together transversely to create varying widths required for each Main Bridge Constant width (7,00m) and constant depth (2.35m) for all main bridge boxes Weight between 48 & 69 tons Plan, Elevation and Cross section of typical module (Junction 9)
  • 10. Leighton Qatar Al Jaber Engineering JV Precast Yard Location
  • 11. Leighton Qatar Al Jaber Engineering JV Precast Yard Decomposition PRODUCTIONDIRECTION REBAR AREA CASTING AREA FINISHING AREA STORAGE AREA
  • 12. Leighton Qatar Al Jaber Engineering JV Stage of Precasting oRebar Cage Assembly oSegment Casting & Curing oSegment Finishing oSegment Storage
  • 13. Leighton Qatar Al Jaber Engineering JV WHAT IS NEEDED? Materials Manpower Special Team for Civil & PT Works Rebar & Formwork Shop Drawing Equipment: Gantry Crane 100t 3u Tower Crane 8,2t @ 40m 2u Regar Jig 8u* 3 lines Rebar-Cage Lifting Beam Segment Steel Skeleton
  • 14. Leighton Qatar Al Jaber Engineering JV Segment Casting & Curing 1. Rebar Cage Positioning in Casting cell 2. Adjustment cover, insert, opening PT items, 3. Close Formwork, 4. Order & Delivery of Concrete, 5. Concrete placement, 6. Curing Compound: a) 12 hours water curing, b) After 12 hours Application of Curing Compound application, 7. Stripping Formwork after12 hours shift mash-cast segment with manipulator, 8. After 36hours lifting Segment,
  • 15. Leighton Qatar Al Jaber Engineering JV Segment Finishing 1. Curing Compound application on Segment Bottom Slab, 2. Segment Finishing, 3. Segment lifting,
  • 16. Leighton Qatar Al Jaber Engineering JV Segment Storage 1. Segment Storage, 2 layers, 2. Storage 28days, 3. Segment Lifting to trailer for erection site,
  • 17. Leighton Qatar Al Jaber Engineering JV Precast Yard Moulds & Production Rate Moulds Ramp Bridges: 1 434 Segments No. of Moulds = 8 6 Field Segments + 1 Pier + 1 Expansion Joint For all Casting Cells the installation & commissioning are done Main Bridges: 846 Segments No of Moulds = 5 2 Field Segment + 1 Deviator + 1 Pier + 1 Expansion Joint 1 Field Segment casting cell Installation & commissioning done The other casting cells the installation is ongoing Production Rate: Field and Deviator segment = 1 segment per mould per day 9 Segments/Day Pier and Expansion Joint = 1 segment per mould every 2 days 2 Segments/Day Transportation of Segments: Ramp Bridges: 6 Trucks * 2 trips/ day by 2 shifts 24 Segments/Day Main Bridges: 6 Trucks * 2 trips / day 12 Segments/Day
  • 18. Leighton Qatar Al Jaber Engineering JV Erection Segments Ramps Bridges Segments are transported one by one to site and lifted to their final position. This erection process will involve: 1.Lifting the segment off the transport truck using special equipment or crane to place them to their final position in the superstructure. 2.Temporarily hanging or supporting the segment from temporary works 3.Once all the segments are in the final position, they are joined and post-stressed to form the permanent monolithic superstructure For NOH Contract 3 - The most effective method to construct the ramps with precast segments is to use the: Span by Span Method with an Underslung Launching Gantry The first launching girder is under delivery at Ramp Bridges Junction 8 The second are under fabrication delivery planned before the end of this year .
  • 19. Leighton Qatar Al Jaber Engineering JV Erection Sequence Ramps Bridges Launching Gantry Underslung Precast segments Typical span by span erection with Underslung Launching Gantry And crawler cranes 2 units of 220tns Supplier of Crawler Crane AERTSSEN Production Rate: 2,5 days by span
  • 20. Leighton Qatar Al Jaber Engineering JV Erection Sequence Ramps Bridges
  • 21. Leighton Qatar Al Jaber Engineering JV Erection Sequence Main Bridges Segment placement by use of crawler cranes of 200 tons Main Bridge Erection works on Falsework Production Rate: 5 days by line
  • 22. Leighton Qatar Al Jaber Engineering JV Erection Sequence Main Bridges Erection over Salwa Road with 2 x Portals
  • 23. Leighton Qatar Al Jaber Engineering JV NEW ORBITAL HIGHWAY CONTRACT 3 Thank you for yourThank you for your attentionattention