際際滷

際際滷Share a Scribd company logo
Your Name
Address, phone, fax, email
David Johnstone (Dave)
121 Foxglov e Av enue, Needham Market, Ipswich IP68JJ. Mob:-07596076500. Djohnstone28@aol.com
Objective To deliver quality workmanship safely and competitively, within budget and on time and
to work with a mutual trust and co-operation. Safety is Paramount!
Experience
Clerk of Works/ Inspector of works/ Site supervisor
32 years experience in all aspects of construction fromhousing/industrial
units/hospitals/schools/Prisons and Infrastructure
Clerk of Works, Supervisor, Site Supervisor.
July 2010  Present.Workingwithin the Atkins Environment I had to Diversify my rolewithin the Atkins business
I have justfinished an NEC/ECC option 3 contract as Site supervisor.Ashort 4 month contractwhich was on the Tame
Valley Viaductin Birmingham.A Trial Span strengthening scheme within the box girder beams where the main aim
was to do the strengthening works but also to collateinformation movingforward for the major works.
Works included fabrication of new access hatches,welding and boltingof the strengthening, full shotblastof the
internals and new paint.
A11 fiveways to Thetford Improvement..
This contractis to convert a singlecarriageway section of road (17km) into a Dual carriageway,including7 Structures inc,
Bridges,Underpasses and junctions..Other works include,wildlifecrossings,drainage,communications installation and
Overhead Electrical diversions.The use of Hydraulically bound material (HBM) in road construction and heavy civils
plant/machinery,resurfacingworks alongwith full depth construction of new carriageway,waterproofingof structures
It is a very Environmental and Ecological sensitiveprojectthrough a green belt. The public has to be taken into
consideration and farmers,includingtheir crops.So dust activity needs to be kept to a minimum.
My role here is to auditthe contractor makingsure work is beingcarried out safely,I also monitor quality of materials and
workmanship,Environmental issues and Ecological issueson behalf of the client(Highways England)
Basically,our team are the eyes and ears for the clientduringthese works. Contract value贈110 million with 250 men on
site
I work with WS Atkins as a Clerk of Works on the Luton and Dunstableguided busway but previously with Atkins,i have
Your Name
Address, phone, fax, email
been required to superviseworks atIpswich and Bury St Edmonds hospitalsin theform of holiday/sicknesscover with the
type of works primarily beingextensions/refurbs/fitouts . Whilstin Luton, i am expected to visitnew school/college
projects from time to time to assistin the supervision of works as well as beinginvolved in the student accommodation
modules for the University..My duties include,Method statement approval,preparingrecords and reports on all
inspections and supervision carried out. Records includedetails of Progress and any delays The number and type of workers
employed Weather conditions Visitors to siteDeliveries InstructionsDetailsof any significantevents including any serious
deficiencies in quality and health and safety and report to Site supervisor/ProjectManager all relevantprojectinformation
to ensure they are kept up to date with siteactivities on a daily basis.
The contractincludes:- Demolition of existingStructures, Ecological and Environmental works,Deep Drainage,Muck
Shifting,Stats work includingdiversions,construction of new Structures and Junctions and the pre fabrication of concrete
sections for the busway. May I add that 90% of this project runs right through Luton and Dunstabletown centre. Contract
value贈90 million.
Duringthis contractmy record keeping and experience i helped savethe client贈1.2 million duringthethree years of works
with 200 men on site
Foreman
Jan 2008-July 2010 Interserve project services ltd, Dolphin bridge house, Uxbridge.
 My last job with this company was on an Environment Agency job in Barking and
Dagenham which involves the construction of 2# pumping stations adjacent to the
Thames. Included in the works are cofferdam construction, pipework support structures,
sheet piling, cfs piling, substation/generator rooms and the pump house structure itself.
Contract value 贈6.2 million and 60 men
 Previous works include:- A14 Milton-Fen ditton major resurfacing programme which
included drainage replacement, bridge deck waterproofing and reinstatement,
resurfacing, VRS inc P1 through to P4 terminals, box beam, corrugated beam both single
and double height barrier. Contract value 贈2.1 million and 80 men
 Foreman at rainham tidal sluice, an Environmental Agency job which included sheet
piling, and shuttering a capping beam along the top and painting operations and fixing of
picture frames as well as seating for the general public to the value of 贈500.000 and 40
men
 Foreman at Wisbech flood defence scheme for the Environment Agency which
included the management of sheet piling gangs, brickies, joiners, painters and sub
contract/direct labour, and the refurbishment of flood gates within the docks to protect
60000+ homes in the event of a flood, conract value 贈4.5 million and 70 men
 Foreman M3 j5-6 24/7 which included deep drainage, variable slipform barrier, VRS
inc double height beam, box beam, P1 to P4 terminals and major resurfacing works
20000+ tonnes of materials. Contract value 贈2.7 million and 80 men
 Foreman M11 j8-9 phase 2+3 major maintainance 24/7 crack & seat under
Your Name
Address, phone, fax, email
contraflow including extensive deep drainage, crack and seat, sawing, variable slipform
barrier, screw piles, VRS, planning operations and resurfacing approx 20000+ tones.
Contract value in the region of 贈3 million and 80 men

 My responsibilities inc:- site specific inductions, site set up and security, checking of
plant and labour certification, waste management, requisition of plant, labour and
materials and consumables, staff/labour/plant returns toolbox talks, briefings,
management of direct/sub contract labour and to liaise with the client/public as well as
implementing current HS&E procedures
Ganger/supervisor
May 2002- Jan 2008. J Breheny contractors, Needham market, Suffolk.
 I started with this company as a ground worker,, fully experienced in ALL aspects of
groundworks inc, drainage (deep), concreting, gabian baskets, kerbing, block paving,
duct work, laying, water, gas, electric, brickwork, blockwork, rendering, plastering, hotlay
and coldlay, footpaths, car parks, housing schemes, road crossings (also using a mole)
live drainage connections, traffic management, temporary and permanent works on
mainly A&B class roads, major roundabouts and junctions, site set up and security,
requisition of plant/labour and materials, management of plant and labour/sub contract
labour, toolbox talks, briefings and I was also involved in the Lowestoft relief road which
involved environmental issues through marshland and various woodlands. I was also
responsible for site safety
 This was small contract work varying from 贈40.000 to 贈100.000 and I had 40 men
under my supervision
Ganger
April 2001-May 2002. Concare ltd, Ipswich
This was just a small firm which employed 4-5 men and was all about teamwork, as is
any job!!
Our workload was all about concrete repairs and brickwork repairs to bridges and car
parks which primarily belonged to the rail network.. Mainly crack injection, rendering,
steel repairs
Ganger
March 1994-March 2001 A&L King builders, Auchterarder, Perthshire, Scotland
Your Name
Address, phone, fax, email
Started as a Telehandler operator/labourer doing all aspects of groundworks both hard
and soft landscaping on housing schemes and commercial new builds as well as
refurbishments, inc, shop fitting and flat convertions and progressed onto a ganger doing
the same works but with the added responsibilities off managing direct/sub contract
labour, requisition of plant, labour and materials, site set up and security
Concrete finisher/Ganger
March 1991-March 1994 Sub contractor to Balfour Beatty, Thornton Fife.
Worked on structures and sewage treatment plants primarily as a concrete finisher and
soon progressed onto a ganger, managing sections of works and answering to my
foreman.
Groundworker/Ganger
November 1988-March 1991. John Laing Construction, Glasgow
In charge of mainly groundworks, roads, drainage, lighting and all services on
commercial properties inc, superstores, extensions to distilleries, high court
refurbishments and social housing
Flexographic printer
Nov 1983-Nov 1988 Smith Anderson co ltd, Falkland Fife.
Served my time as a printer, setting up and running a 6 colour reversible printing press
Education Auchmuty High School, Glenrothes Fife
1978-1982
 Gained 5 O level passes in English, Mathematics. Technical Drawing, Woodwork,
Metalwork then moved onto Buckhaven technical college in Engineering for one year.
Interests I like architecture and old buildings as well as camping and walking, keeping fit,swimming
my family and I also like to attend and participate in various charity events and showing / building
motorcycles
Qualifications I hold a CPCS Telehandler (exc 360 slew), NRSWA ops and supervisors card inc hotlay
SMSTS, CSCS managers card (gold) full first aid training, COSHH co-ordinator, fire co-
ordinator, scaffold inspection, and continuous apdated in health and safety as well as
Environmental updates. I also have in house training with Breheny which includes:- ride
On roller, confined spaces,track machine (under 10 tonne), reversing vehicle controller,
Forward and side tipping dumpers
Your Name
Address, phone, fax, email
I have just recently completed HSEQ-Environmental and Quality Awareness along with
Risk Management (10/06/10) and SMSTS refresher (14+15/06/10)
References References are available on request

More Related Content

What's hot (20)

DOC
Andrew Legg`s CV
Andrew Legg
DOC
Hartman, John - 2016 Resume
John Hartman
DOCX
resume Adam Dixon
Dixon (Becglng)
DOC
Sollie CV 25 June 2015 (4)_CHANGED
Sollie Van Nieuwenhuizen
DOCX
Thomas P Jameson CV 2015
Tom Jameson
PDF
BM Construction
Spinning Top
DOCX
WILLIAM^MBARSAMIAN
William. Barsamian
DOC
Gregory McDonald SR Resume Final 1 (1)
Macko mcdonald
DOC
MosesBroederlow-Res (1)
Mohi Broederlow
DOC
up to date cv
Colin nutt
PDF
Curriculum vitae 2016
Burger Rust
DOC
rgb up to date cv
malcolm fish
PDF
Angelo_Hellawell_CV_January 15
Angelo Hellawell
PDF
Clark Mulhern Construction - Sep 2016
Sean Clark
DOCX
Tim Ryan Resume
Timothy Ryan
DOC
Piotrowicz_Marcin_ CV
Marcin Piotrowicz
DOC
resume 2014
Pierre DuPont
PDF
Introduction
David Hayward
DOCX
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Pavel Babincak
Andrew Legg`s CV
Andrew Legg
Hartman, John - 2016 Resume
John Hartman
resume Adam Dixon
Dixon (Becglng)
Sollie CV 25 June 2015 (4)_CHANGED
Sollie Van Nieuwenhuizen
Thomas P Jameson CV 2015
Tom Jameson
BM Construction
Spinning Top
WILLIAM^MBARSAMIAN
William. Barsamian
Gregory McDonald SR Resume Final 1 (1)
Macko mcdonald
MosesBroederlow-Res (1)
Mohi Broederlow
up to date cv
Colin nutt
Curriculum vitae 2016
Burger Rust
rgb up to date cv
malcolm fish
Angelo_Hellawell_CV_January 15
Angelo Hellawell
Clark Mulhern Construction - Sep 2016
Sean Clark
Tim Ryan Resume
Timothy Ryan
Piotrowicz_Marcin_ CV
Marcin Piotrowicz
resume 2014
Pierre DuPont
Introduction
David Hayward
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Pavel Babincak

Viewers also liked (13)

PPTX
Presentatie mobile marketing LN Beanies
SigridVanneste
PPTX
social media strategy aveve
SigridVanneste
PDF
Ricardo Hernandez Resume
Ricardo Hernandez
PDF
Portfolio pankaj sharma
Pankaj Sharma
PDF
Palavras e defini巽担es v2
ProCLAUDIA/LUCIANE MEIJON/SOARES
PDF
Psyching To Gain Power - published in IMA CFO Connect Jan 2016
Wisdom_Village_Publications
PPTX
Sekolah Wawasan Lingkungan
Ifan Unix
DOC
Welsh Resume
Berny Welsh
DOCX
Report
chloeesim
PPTX
Anderson Roa Devia
mauriciosastoque
PPTX
5 Body Parts That You Are Not Cleaning Properly
Health Care At Home India
PPTX
Vector P The paddle latch from Industrilas
Albert Jagger
PDF
Point Sum Average Peak Algorithm Detection of LTE
AM Publications
Presentatie mobile marketing LN Beanies
SigridVanneste
social media strategy aveve
SigridVanneste
Ricardo Hernandez Resume
Ricardo Hernandez
Portfolio pankaj sharma
Pankaj Sharma
Palavras e defini巽担es v2
ProCLAUDIA/LUCIANE MEIJON/SOARES
Psyching To Gain Power - published in IMA CFO Connect Jan 2016
Wisdom_Village_Publications
Sekolah Wawasan Lingkungan
Ifan Unix
Welsh Resume
Berny Welsh
Report
chloeesim
Anderson Roa Devia
mauriciosastoque
5 Body Parts That You Are Not Cleaning Properly
Health Care At Home India
Vector P The paddle latch from Industrilas
Albert Jagger
Point Sum Average Peak Algorithm Detection of LTE
AM Publications
Ad

Similar to Dave cv (20)

DOC
Leecvdoc
lee roberts
DOCX
Nick Kennedy cv
Nick Kennedy
DOC
Stephen parish c.v. 14 03-17
stephen parish
DOC
Philip_Murray_ CV 13-01-16
Phil Murray
DOCX
Current CV 23-6-16r2
Dan Brocklehurst MIET
DOCX
CV john Halpin 6.4latest 30-01-17
John William Halpin
DOC
Scott_Jefferies_CV new new
scott jefferies
DOC
Simon Murphy CV
Simon Murphy
DOC
Paul Hampshire Current C V
paul hampshire
DOC
New CV - Dec 14
LEE meechan
DOC
New CV - Dec 14
LEE meechan
DOCX
Colin Perryman CV[1] (1)
colin perryman
PDF
CV_Harry_Taylor
Harry Taylor
DOC
New CV - Feb 2015 (1)
LEE meechan
DOC
New CV - Feb 2015 (1)
LEE meechan
PDF
Endaf Glyn Jones CV
Endaf Glyn Jones
RTF
Updater CV
steven morrison
DOC
Raymond Pears.cv June 2015
raymond pears
PDF
CV 160105 Paul Magee
Paul Magee
DOC
ronald coventry cv n5
Ronald Coventry
Leecvdoc
lee roberts
Nick Kennedy cv
Nick Kennedy
Stephen parish c.v. 14 03-17
stephen parish
Philip_Murray_ CV 13-01-16
Phil Murray
Current CV 23-6-16r2
Dan Brocklehurst MIET
CV john Halpin 6.4latest 30-01-17
John William Halpin
Scott_Jefferies_CV new new
scott jefferies
Simon Murphy CV
Simon Murphy
Paul Hampshire Current C V
paul hampshire
New CV - Dec 14
LEE meechan
New CV - Dec 14
LEE meechan
Colin Perryman CV[1] (1)
colin perryman
CV_Harry_Taylor
Harry Taylor
New CV - Feb 2015 (1)
LEE meechan
New CV - Feb 2015 (1)
LEE meechan
Endaf Glyn Jones CV
Endaf Glyn Jones
Updater CV
steven morrison
Raymond Pears.cv June 2015
raymond pears
CV 160105 Paul Magee
Paul Magee
ronald coventry cv n5
Ronald Coventry
Ad

Dave cv

  • 1. Your Name Address, phone, fax, email David Johnstone (Dave) 121 Foxglov e Av enue, Needham Market, Ipswich IP68JJ. Mob:-07596076500. Djohnstone28@aol.com Objective To deliver quality workmanship safely and competitively, within budget and on time and to work with a mutual trust and co-operation. Safety is Paramount! Experience Clerk of Works/ Inspector of works/ Site supervisor 32 years experience in all aspects of construction fromhousing/industrial units/hospitals/schools/Prisons and Infrastructure Clerk of Works, Supervisor, Site Supervisor. July 2010 Present.Workingwithin the Atkins Environment I had to Diversify my rolewithin the Atkins business I have justfinished an NEC/ECC option 3 contract as Site supervisor.Ashort 4 month contractwhich was on the Tame Valley Viaductin Birmingham.A Trial Span strengthening scheme within the box girder beams where the main aim was to do the strengthening works but also to collateinformation movingforward for the major works. Works included fabrication of new access hatches,welding and boltingof the strengthening, full shotblastof the internals and new paint. A11 fiveways to Thetford Improvement.. This contractis to convert a singlecarriageway section of road (17km) into a Dual carriageway,including7 Structures inc, Bridges,Underpasses and junctions..Other works include,wildlifecrossings,drainage,communications installation and Overhead Electrical diversions.The use of Hydraulically bound material (HBM) in road construction and heavy civils plant/machinery,resurfacingworks alongwith full depth construction of new carriageway,waterproofingof structures It is a very Environmental and Ecological sensitiveprojectthrough a green belt. The public has to be taken into consideration and farmers,includingtheir crops.So dust activity needs to be kept to a minimum. My role here is to auditthe contractor makingsure work is beingcarried out safely,I also monitor quality of materials and workmanship,Environmental issues and Ecological issueson behalf of the client(Highways England) Basically,our team are the eyes and ears for the clientduringthese works. Contract value贈110 million with 250 men on site I work with WS Atkins as a Clerk of Works on the Luton and Dunstableguided busway but previously with Atkins,i have
  • 2. Your Name Address, phone, fax, email been required to superviseworks atIpswich and Bury St Edmonds hospitalsin theform of holiday/sicknesscover with the type of works primarily beingextensions/refurbs/fitouts . Whilstin Luton, i am expected to visitnew school/college projects from time to time to assistin the supervision of works as well as beinginvolved in the student accommodation modules for the University..My duties include,Method statement approval,preparingrecords and reports on all inspections and supervision carried out. Records includedetails of Progress and any delays The number and type of workers employed Weather conditions Visitors to siteDeliveries InstructionsDetailsof any significantevents including any serious deficiencies in quality and health and safety and report to Site supervisor/ProjectManager all relevantprojectinformation to ensure they are kept up to date with siteactivities on a daily basis. The contractincludes:- Demolition of existingStructures, Ecological and Environmental works,Deep Drainage,Muck Shifting,Stats work includingdiversions,construction of new Structures and Junctions and the pre fabrication of concrete sections for the busway. May I add that 90% of this project runs right through Luton and Dunstabletown centre. Contract value贈90 million. Duringthis contractmy record keeping and experience i helped savethe client贈1.2 million duringthethree years of works with 200 men on site Foreman Jan 2008-July 2010 Interserve project services ltd, Dolphin bridge house, Uxbridge. My last job with this company was on an Environment Agency job in Barking and Dagenham which involves the construction of 2# pumping stations adjacent to the Thames. Included in the works are cofferdam construction, pipework support structures, sheet piling, cfs piling, substation/generator rooms and the pump house structure itself. Contract value 贈6.2 million and 60 men Previous works include:- A14 Milton-Fen ditton major resurfacing programme which included drainage replacement, bridge deck waterproofing and reinstatement, resurfacing, VRS inc P1 through to P4 terminals, box beam, corrugated beam both single and double height barrier. Contract value 贈2.1 million and 80 men Foreman at rainham tidal sluice, an Environmental Agency job which included sheet piling, and shuttering a capping beam along the top and painting operations and fixing of picture frames as well as seating for the general public to the value of 贈500.000 and 40 men Foreman at Wisbech flood defence scheme for the Environment Agency which included the management of sheet piling gangs, brickies, joiners, painters and sub contract/direct labour, and the refurbishment of flood gates within the docks to protect 60000+ homes in the event of a flood, conract value 贈4.5 million and 70 men Foreman M3 j5-6 24/7 which included deep drainage, variable slipform barrier, VRS inc double height beam, box beam, P1 to P4 terminals and major resurfacing works 20000+ tonnes of materials. Contract value 贈2.7 million and 80 men Foreman M11 j8-9 phase 2+3 major maintainance 24/7 crack & seat under
  • 3. Your Name Address, phone, fax, email contraflow including extensive deep drainage, crack and seat, sawing, variable slipform barrier, screw piles, VRS, planning operations and resurfacing approx 20000+ tones. Contract value in the region of 贈3 million and 80 men My responsibilities inc:- site specific inductions, site set up and security, checking of plant and labour certification, waste management, requisition of plant, labour and materials and consumables, staff/labour/plant returns toolbox talks, briefings, management of direct/sub contract labour and to liaise with the client/public as well as implementing current HS&E procedures Ganger/supervisor May 2002- Jan 2008. J Breheny contractors, Needham market, Suffolk. I started with this company as a ground worker,, fully experienced in ALL aspects of groundworks inc, drainage (deep), concreting, gabian baskets, kerbing, block paving, duct work, laying, water, gas, electric, brickwork, blockwork, rendering, plastering, hotlay and coldlay, footpaths, car parks, housing schemes, road crossings (also using a mole) live drainage connections, traffic management, temporary and permanent works on mainly A&B class roads, major roundabouts and junctions, site set up and security, requisition of plant/labour and materials, management of plant and labour/sub contract labour, toolbox talks, briefings and I was also involved in the Lowestoft relief road which involved environmental issues through marshland and various woodlands. I was also responsible for site safety This was small contract work varying from 贈40.000 to 贈100.000 and I had 40 men under my supervision Ganger April 2001-May 2002. Concare ltd, Ipswich This was just a small firm which employed 4-5 men and was all about teamwork, as is any job!! Our workload was all about concrete repairs and brickwork repairs to bridges and car parks which primarily belonged to the rail network.. Mainly crack injection, rendering, steel repairs Ganger March 1994-March 2001 A&L King builders, Auchterarder, Perthshire, Scotland
  • 4. Your Name Address, phone, fax, email Started as a Telehandler operator/labourer doing all aspects of groundworks both hard and soft landscaping on housing schemes and commercial new builds as well as refurbishments, inc, shop fitting and flat convertions and progressed onto a ganger doing the same works but with the added responsibilities off managing direct/sub contract labour, requisition of plant, labour and materials, site set up and security Concrete finisher/Ganger March 1991-March 1994 Sub contractor to Balfour Beatty, Thornton Fife. Worked on structures and sewage treatment plants primarily as a concrete finisher and soon progressed onto a ganger, managing sections of works and answering to my foreman. Groundworker/Ganger November 1988-March 1991. John Laing Construction, Glasgow In charge of mainly groundworks, roads, drainage, lighting and all services on commercial properties inc, superstores, extensions to distilleries, high court refurbishments and social housing Flexographic printer Nov 1983-Nov 1988 Smith Anderson co ltd, Falkland Fife. Served my time as a printer, setting up and running a 6 colour reversible printing press Education Auchmuty High School, Glenrothes Fife 1978-1982 Gained 5 O level passes in English, Mathematics. Technical Drawing, Woodwork, Metalwork then moved onto Buckhaven technical college in Engineering for one year. Interests I like architecture and old buildings as well as camping and walking, keeping fit,swimming my family and I also like to attend and participate in various charity events and showing / building motorcycles Qualifications I hold a CPCS Telehandler (exc 360 slew), NRSWA ops and supervisors card inc hotlay SMSTS, CSCS managers card (gold) full first aid training, COSHH co-ordinator, fire co- ordinator, scaffold inspection, and continuous apdated in health and safety as well as Environmental updates. I also have in house training with Breheny which includes:- ride On roller, confined spaces,track machine (under 10 tonne), reversing vehicle controller, Forward and side tipping dumpers
  • 5. Your Name Address, phone, fax, email I have just recently completed HSEQ-Environmental and Quality Awareness along with Risk Management (10/06/10) and SMSTS refresher (14+15/06/10) References References are available on request