狠狠撸

狠狠撸Share a Scribd company logo
Way?nding Program
for the City of Carrboro
Design Development
August 15, 2018
Lorem ipsum
Project:
Project No:
Designer:
Date:
Client:
Contact:
City Way?nding Program
CB1001
Description:
Version:
Design Development
1
City of Carrboro
Annette Lafferty
TM
8-15-18
Original Color Palette
Re?ned Color Palette
There were several comments about colors
overall implying that they need to be revised.
A muted, more organic palette seems to integrate
better with the Carrboro environment and existing
natural textures and materials.
The glass finials
are changed to
painted spheres.
Project:
Project No:
Designer:
Date:
Client:
Contact:
City Way?nding Program
CB1001
Description:
Version:
Design Development
1
City of Carrboro
Annette Lafferty
TM
8-15-18
B1 - Gateway Banners B2 - Pole Banners
TownHall
6'-0"
2'-0"
1'-10"
7'-10"
Parking
Project:
Project No:
Designer:
Date:
Client:
Contact:
City Way?nding Program
CB1001
Description:
Version:
Concept Development
1
City of Carrboro
Annette Lafferty
TM
8-15-18
Century Center
Weaver St Market
Town Hall
The Arts Center
8"8"7"
4'-10"
6'-0"
1'-10"
5 1/2"
1'-11"
3"
1'-33/8"
51/2"3"
5 1/2"
1'-11"
7'-0"
12'-0"
4'-3"
1'-6"
Smoke-Free
Front
Plan View
Side Front SideBack Back Front Side Back
V1 - Multi-message Vehicular Guide V2 - Parking Guide
R1 - No Smoking
T1 - Bike Trailblazers
Smoke-Free
6"
93/4"
4'-2"
2'-0"
2'-0"
10"
Project:
Project No:
Designer:
Date:
Client:
Contact:
City Way?nding Program
CB1001
Description:
Version:
Concept Development
1
City of Carrboro
Annette Lafferty
TM
8-15-18
Original Color Palette Re?ned Color Palette
Side Detail Mounting Detail
Section Detail
Pedestrian Trailblazer
4"
4 1/2"
2'-0"4'-8"
1'-0"
3'-0"(verify)
6'-8"
1'-6"6"
4"8"
4 1/2"
1'-0"
1"
1"
6'-2"
4'-9"
1/4"3/4"
1'-0" (Verify)
Destination TBD 7 min
Destination TBD 8 min
Shops & Restaurants 3 min
Destination TBD 7 min
Shops & Restaurants 3 min
Destination TBD 3 min
History Walk
Accessible Path
Elevator
Stairs
Crosswalk
Parking Lot
Post Office
Restrooms
Destination TBD 7 min
Destination TBD 8 min
Shops & Restaurants 3 min
Destination TBD 7 min
Shops & Restaurants 3 min
Destination TBD 3 min
History Walk
Accessible Path
Elevator
Stairs
Crosswalk
Parking Lot
Post Office
Restrooms
2"
The base will be elevated
and include adjustable levelers
to mitigate uneven substrates
then concealed with mortar.

More Related Content

Design development 8-15-18

  • 1. Way?nding Program for the City of Carrboro Design Development August 15, 2018 Lorem ipsum
  • 2. Project: Project No: Designer: Date: Client: Contact: City Way?nding Program CB1001 Description: Version: Design Development 1 City of Carrboro Annette Lafferty TM 8-15-18 Original Color Palette Re?ned Color Palette There were several comments about colors overall implying that they need to be revised. A muted, more organic palette seems to integrate better with the Carrboro environment and existing natural textures and materials.
  • 3. The glass finials are changed to painted spheres. Project: Project No: Designer: Date: Client: Contact: City Way?nding Program CB1001 Description: Version: Design Development 1 City of Carrboro Annette Lafferty TM 8-15-18 B1 - Gateway Banners B2 - Pole Banners TownHall 6'-0" 2'-0" 1'-10" 7'-10"
  • 4. Parking Project: Project No: Designer: Date: Client: Contact: City Way?nding Program CB1001 Description: Version: Concept Development 1 City of Carrboro Annette Lafferty TM 8-15-18 Century Center Weaver St Market Town Hall The Arts Center 8"8"7" 4'-10" 6'-0" 1'-10" 5 1/2" 1'-11" 3" 1'-33/8" 51/2"3" 5 1/2" 1'-11" 7'-0" 12'-0" 4'-3" 1'-6" Smoke-Free Front Plan View Side Front SideBack Back Front Side Back V1 - Multi-message Vehicular Guide V2 - Parking Guide R1 - No Smoking T1 - Bike Trailblazers Smoke-Free 6" 93/4" 4'-2" 2'-0" 2'-0" 10"
  • 5. Project: Project No: Designer: Date: Client: Contact: City Way?nding Program CB1001 Description: Version: Concept Development 1 City of Carrboro Annette Lafferty TM 8-15-18 Original Color Palette Re?ned Color Palette Side Detail Mounting Detail Section Detail Pedestrian Trailblazer 4" 4 1/2" 2'-0"4'-8" 1'-0" 3'-0"(verify) 6'-8" 1'-6"6" 4"8" 4 1/2" 1'-0" 1" 1" 6'-2" 4'-9" 1/4"3/4" 1'-0" (Verify) Destination TBD 7 min Destination TBD 8 min Shops & Restaurants 3 min Destination TBD 7 min Shops & Restaurants 3 min Destination TBD 3 min History Walk Accessible Path Elevator Stairs Crosswalk Parking Lot Post Office Restrooms Destination TBD 7 min Destination TBD 8 min Shops & Restaurants 3 min Destination TBD 7 min Shops & Restaurants 3 min Destination TBD 3 min History Walk Accessible Path Elevator Stairs Crosswalk Parking Lot Post Office Restrooms 2" The base will be elevated and include adjustable levelers to mitigate uneven substrates then concealed with mortar.