際際滷

際際滷Share a Scribd company logo
2
Most read
4
Most read
Key Skills Profile Summary
Strategic Planning
Project Management
Maintenance Operations
Process Improvement
Resource Optimization
Instrumentation & Control
Liaison & Coordination
Plant Operations
Team Building & Leadership
 A goal-oriented professional with nearly 14 years of experience in
Electrical Project Management and Maintenance.
 Proficient in implementing maintenance schedules for electrical
equipment, performing periodic checks and preparing technical
documents for the same; excellent in SAP PM module
 Expertise in identifying appropriate control schemes / systems and
selecting instruments as per type of application; skills in managing
instrumentation & control engineering / technology including
system applications, principles, techniques & procedures to
optimize productivity
 Experience in identifying appropriate control schemes / systems,
managing enquiry specifications and selecting equipment as per
type of application; applying instrumentation & control engineering
including system principles & techniques to optimize productivity
 Directed cross-functional teams using interactive & motivational
leadership; acknowledged for recruiting and mentoring leaders with
an equal desire to win
 An effective communicator with excellent relationship management
skills and strong analytical, problem solving & organizational
capabilities.
Career Timeline(for the recent 5 companies)
1. TATA POWER LTD
( FOR POWER MECH PROJECTS
LTD ) , MUNDRA,GUJRAT
AGM ( ELECTRICAL) Electrical Maintenance of 4000 (800x5) MW power plant
& Utility.
2. ADANI POWER & PORT LTD
( FOR FLSMIDTH
LTD ),BHADRAK,ORISSA &
MUNDRA ,GUJRAT
SECTION HEAD
( Electrical &
Instrument)
Electrical Maintenance of Port & 4630 MW power plant
BOP Utility.
3. TRF LTD A TATA
ENTERPRISES, JAMSHEDPUR
MGR. (ELECTRICAL) Electrical Maintenance & Project Management of Heavy
Machinery Manufacturing Plant.
4. BHUSAN POWER & STEEL
LTD ,JHARSUGADA,ORISSA
DEPUTY MANAGER,
Electrical
Electrical Maintenance of 130 x 2 MW Power Plant
having CFBC Boiler.
5. Reliance Energy Ltd (WESCO
LTD), Transmission &
Distribution.
DEPUTY MANAGER
Technical
( Distribution &
Transmission )
Electrical Maintenance & Project Management of
Switchyard & Sub- Station.
Dinesh Kumar Singh
 An achievement-driven professional targeting senior level assignment in Maintenance and
Project Management preferably in Power Plant, Steel, Utility, Manufacturing industry
 Present Address: - Umiya Nagar, Mundra, Kutch, Gujarat.
 dksadani@gmail.com, dkstrf@gmail.com 9638447729 / 7573997564
July08Dec10
 Work Experience
1. TATA POWER LTD (For POWER MECH PROJECTS Ltd.), 4000 MW, MUNDRA, Gujarat. Jul16  Present
AGM (EMD) Department
Equipment Handled: ELECTRICAL MAINTENANCE
Team Size: 75
Key Result Areas:
 Selecting control schemes, identifying appropriate system, managing enquiry specifications and selecting
instruments as per type of application; managing the process instrumentation to optimize productivity
 Executing predictive & preventive maintenance schedules for electrical & instrument equipments as well as
conducting regular shutdown inspections & replacements of spare parts to ensure smooth operations.
 Regular overall plant equipments preventive and predictive maintenance as per SAP PM Schedule. Manpower
planning in MS Project for proper effective utilization.
 Various Electrical equipments :-
 Maintenance/CBM/Testing of GT/UT/UAT/Auxiliary Power Transformer up to 300 MVA , Outdoor
Switchyard Maintenance of 400/200/33 KV and related
equipments(LA/CVT/ISOLATOR/CT/PT/BREAKER etc ) .
 Indoor substation maintenance/CBM/Testing 33/11/6.6 KV having HT VCB( Siemens,ABB) .LT ACB
( Siemens,ABB) switchgear Panel , Numerical Relays ( ABB,Siemens ).
 Maintenance/CBM/Testing of 6.6 KV HT motor up to 1000MW & 415 V LT motors, Numerical Relays
( Siemens/ABB/AREVA ) ,Battery( Exide/HBL),UPS ( HIREL/EMERSION), DG up to 1.5 MVA,Air
Compressor & Utilities.
 Various Instruments Equipments
 Maintenance/CBM/Testing of 6.6 kv & 680 v MV/LV VFD AC Drives (Siemens S120, G130 ABB ACS800,
ACS2000).
 Maintenance of Proxy sensors, Transducers, Various network communication etc instruments
equipments.
 Operation trouble shooting ideas in PLC (Siemens/ABB/ROCKWELL).
 Developing various innovative solutions to avoid repetitive failures & all other problems that adversely affect
plant operations including capacity, quality, cost & regulatory compliance issues.
 Taken ownership in 5s,safety TPM activity & Energy Management to maintain safe and healthy work
environment by enforcing standards
 Pivotal in streamlining processes through measures such as RCFA/FISH BONE ANALYSIS/WHY-WHY.
2. FLSMIDTH LTD (For Adani Port and Power Ltd.), Mundra, Gujarat Aug13  Jul16
Electrical Section Head (E & I) Department
Team Size: 30
Equipment Handled: Port Equipments, Power Plant CHP/BOP, Steel Plant RMHS
(Switchyard/MCC/PCC/AUTOMATION)
Highlights:
 Reduced downtime by 0% (please mention) through measures such as RCM.
 Managing end-to-end projects from stage of tendering to handover involving finalization of technical
specifications, planning & control, creation of reports & execution plans and manpower planning .
 Successfully executed plant expansion / modification / up gradation Electrical projects such as Conveyors,
SUL, Wagon Tripler, Rake Loading System, Stacker - Reclaimer
 Recognized for increasing in-plant capability by 97% (please mention) through effective maintenance.
 Pivotal in streamlining processes through measures such as RCFA/FISH BONE ANALYSIS/WHY-WHY.
Major Electrical & Instruments Equipments handled :- Conveyors, Ship loader, Ship unloader,, Wagon Tripler,
Rake Loading System, Stacker  Reclaimer etc.
Maintenance/Testing/Project Management :
 Led overall maintenance of 132 KV Switch yard &Substation of Plant, HT & LT Motors, Power & Distribution
Transformers, 1500 KVA DG Set, HT & LT Panels, 132 KV SF6 Circuit Breakers, 6.6 KV VCBs & 415 V ACBs,
Electrical Switch Gear Siemens, ABB, and L&T etc, Power Transformers (up to 60 MVA) & All major Electrical
Equipments ( HT & LT Motors, HT & LT Panels).
 Battery, UPS, APFC , Utilities , DG Set, Compressor and Lighting Systems Etc. maintenance &
Testing of all the
Equipments.33/11 KV indoor substation maintenance, HT/, LT PCC/PMCC feeders and all electrical
utilities.
 Instruments Handled:
 Flow meters, level sensor, and proximity switch, belt-weighing system, fire-fighting system CCTV, AC VFD
drives (Siemens, ABB),Level I Automation like PLC(Siemens, Rockwell,ABB),Drives
( ACS2000,ACS800.S120,G130).and so on.
3.TRF LTD A TATA ENTERPRISES, JamshedpurDec10  Aug13
Manager Electrical
Team Size: 10
Highlights:
 Manufacturing Plant workshop overall Maintenance/Project Management/Commissioning/Testing:-
 Handled 132/11 KV switchyard and 11/.415 KV Indoor substation overall Maintenance of power
transformers/ auxiliary distribution transformers, maintenance of HT/LT main & auxiliary, PCC/MCC
feeders panel and motors panel with troubleshooting, routine maintenance with testing of Siemens
Breaker & relays and so on.
 Preparing documentation for Electrical System and reviewing 3rd
party drawings on installation &
commissioning accordingly; updating tender documents (obtained firm construction bids from contractors &
equipment vendors) and design / engineering documents prepared by Consultant / Principal-Engineering.
 Managing project activities with utilization of available resources & machine loading as per pre-set
schedules; implementing cost saving measures to achieve reduction in terms of man days & production
cost.
 Organize, coordinate & monitor execution & commissioning of small projects and major modifications works in
time to achieve targeted results of Plant Project.
4.Bhushan Power & Steel, Jharsugada, Orissa Jul08  Dec10
Deputy Manager
Team Size: 20
Highlights:
 Supervised the entire gamut of maintenance including Generator protection, AVR, UAT/GT/ST/power
transformers/ auxiliary distribution transformers, maintenance of HT/LT main & auxiliary, PCC/MCC feeders
panel and motors panel with troubleshooting, routine maintenance with testing of Siemens Breaker & relays
and so on
 Performed routine maintenance of indoor VCB Breakers, Numerical relays, HT/LT motors, battery, earthing
with safety, 220/33 KV switchyard maintenance of CB SF6 Breaker, CT, CVT, LA, earthing, battery, protection
panel and so on.
5.WESCO Ltd., Orissa (a A Reliance Energy Ltd ) ,Semi Government Orissa Grid Corporation. Nov03  Jul08
Deputy Manager  Transmission and Distribution
Growth Path:
Nov03  Nov04: GET
Nov04  May07: Assistant Manager- Transmission and Distribution
May07  Jul08: Deputy Manager  Transmission and Distribution
Team Size: 35 members of O&M team and 55 associates
Highlights:
 Managed the entire Operation & Maintenance of 132/33 KV Grid & 33/11 KV distribution line Sub-Station.
 Site Survey, Construction & Inspection of distribution network (HT,LT ) & Distribution transformers.
 Preparation of Maintenance Schedule as per site survey and undertaking the same in a time bound manner.
 Conducted testing of Power & Distribution Transformer, CT, PT, LA, Isolator, CB, HT & LT Power Panel.
 Taken ownership in 5s,safety TPM activity & Energy Management to maintain safe and healthy work
environment by enforcing standards procedure , complying with codes & regulations.
Education
 B.E. (Electrical) from KITS, Bhubaneswar,Utkal University in 2002 full time with 66.40%.
 12 th Science from CHSE Orissa Board in 1997 with 66 %.
 10 th from HSC Orissa Board in 1995 with 73 %.
IT Skills
 Microsoft Project-2007 ,MS Office , ERP Software-  SAP PM
Personal Details
Date of Birth:4th
May 1980
Languages Known: English, Hindi and Oriya
Permanent Address: Plot No  LCR-474,Phase- I,Chhend Colony,Rourkela,Orissa.
Dinesh Kumar Singh.

More Related Content

What's hot (20)

PDF
Manoj Ahire-Resume
Manoj Ahire
PPT
Thomas & betts LinkedIn PowerPoint
JeremyMathews
DOCX
Michael Carlin's Resume for the internet
Michael Carlin
DOC
updated_ashishmalhotra
Ashish Malhotra
DOC
Devang Technician
Devangkumar Dave
DOC
roldan_resume_updated_23 Oct 2015
roldan retiro
PDF
Smart Manufacturing Suite for Power Industry
A.T.E. Private Limited
PDF
D Kaylor resume
kylrdmnl
PDF
Smart Technology and Service Suite Equipment Monitoring - Diesel Gensets
A.T.E. Private Limited
DOCX
Tim Phillips
Tim Phillips
PPT
Technology Organizational Chart and Action Plan
deanhofer
DOCX
Resume Ravindra K Maheshwari - CC
Ravindra Kumar Maheshwari
DOC
Pawan Resume-2014(rev)
Pawan Kumar Mundra
DOC
CV Nagashiva
Nagashiva Gaadhamsetti
PDF
Manoj Ahire-Resume
Manoj Ahire
PDF
profile
upendra singh
DOC
CV016092015
Mohamed Abou El kassem
DOC
Resume11
Mukesh Kumar Gupta
DOC
Maintenance Expert in CNC/PLC Machines - Transmission Gear Shop & HT
SANDEEP DABRE
Manoj Ahire-Resume
Manoj Ahire
Thomas & betts LinkedIn PowerPoint
JeremyMathews
Michael Carlin's Resume for the internet
Michael Carlin
updated_ashishmalhotra
Ashish Malhotra
Devang Technician
Devangkumar Dave
roldan_resume_updated_23 Oct 2015
roldan retiro
Smart Manufacturing Suite for Power Industry
A.T.E. Private Limited
D Kaylor resume
kylrdmnl
Smart Technology and Service Suite Equipment Monitoring - Diesel Gensets
A.T.E. Private Limited
Tim Phillips
Tim Phillips
Technology Organizational Chart and Action Plan
deanhofer
Resume Ravindra K Maheshwari - CC
Ravindra Kumar Maheshwari
Pawan Resume-2014(rev)
Pawan Kumar Mundra
CV Nagashiva
Nagashiva Gaadhamsetti
Manoj Ahire-Resume
Manoj Ahire
profile
upendra singh
Maintenance Expert in CNC/PLC Machines - Transmission Gear Shop & HT
SANDEEP DABRE

Similar to dinesh.Resume.new (2) (20)

DOC
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
DOC
Bharat Verma (Electrical engineer)
bharat verma
DOCX
Curriculam vitae
RaviShankarChakravor1
DOCX
Curriculam vitae
RaviShankarChakravor1
DOC
Ranjeet resume Industrial
Ranjeet Buranwal
DOC
sandeep_CV
sandeep shinde
DOC
Sushil podia Ahm
Sushil Podia
DOC
Sanjog navandars
sanjog navandar
DOC
Ranjeet resume Industrial
Ranjeet Buranwal
DOC
sanjog navandars
sanjog navandar
DOCX
Ajay Uikey
AJAY UIKEY
PDF
Resume-RAKESH KUMAR
Rakesh jangra
DOC
selfcv NEw
Bhaskar Bhattacharjee
DOCX
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
DOC
Copy of updated cv of makhdum haris
Naseer Akram
DOC
Dharmendra panda
DHARMENDRA PANDA
DOC
amit
Amit Kumar kar
DOCX
Sanjeev resume (1)
Sanjeev Kumar
DOC
siva resume
Sivanaga Srinivas
DOC
anil
Anil Ghodke
RESUME_BS-Project-Maint -1- JPL
BISWAJYOTI SWAIN
Bharat Verma (Electrical engineer)
bharat verma
Curriculam vitae
RaviShankarChakravor1
Curriculam vitae
RaviShankarChakravor1
Ranjeet resume Industrial
Ranjeet Buranwal
sandeep_CV
sandeep shinde
Sushil podia Ahm
Sushil Podia
Sanjog navandars
sanjog navandar
Ranjeet resume Industrial
Ranjeet Buranwal
sanjog navandars
sanjog navandar
Ajay Uikey
AJAY UIKEY
Resume-RAKESH KUMAR
Rakesh jangra
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Upendra Kumar Yadav
Copy of updated cv of makhdum haris
Naseer Akram
Dharmendra panda
DHARMENDRA PANDA
Sanjeev resume (1)
Sanjeev Kumar
siva resume
Sivanaga Srinivas
Ad

dinesh.Resume.new (2)

  • 1. Key Skills Profile Summary Strategic Planning Project Management Maintenance Operations Process Improvement Resource Optimization Instrumentation & Control Liaison & Coordination Plant Operations Team Building & Leadership A goal-oriented professional with nearly 14 years of experience in Electrical Project Management and Maintenance. Proficient in implementing maintenance schedules for electrical equipment, performing periodic checks and preparing technical documents for the same; excellent in SAP PM module Expertise in identifying appropriate control schemes / systems and selecting instruments as per type of application; skills in managing instrumentation & control engineering / technology including system applications, principles, techniques & procedures to optimize productivity Experience in identifying appropriate control schemes / systems, managing enquiry specifications and selecting equipment as per type of application; applying instrumentation & control engineering including system principles & techniques to optimize productivity Directed cross-functional teams using interactive & motivational leadership; acknowledged for recruiting and mentoring leaders with an equal desire to win An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational capabilities. Career Timeline(for the recent 5 companies) 1. TATA POWER LTD ( FOR POWER MECH PROJECTS LTD ) , MUNDRA,GUJRAT AGM ( ELECTRICAL) Electrical Maintenance of 4000 (800x5) MW power plant & Utility. 2. ADANI POWER & PORT LTD ( FOR FLSMIDTH LTD ),BHADRAK,ORISSA & MUNDRA ,GUJRAT SECTION HEAD ( Electrical & Instrument) Electrical Maintenance of Port & 4630 MW power plant BOP Utility. 3. TRF LTD A TATA ENTERPRISES, JAMSHEDPUR MGR. (ELECTRICAL) Electrical Maintenance & Project Management of Heavy Machinery Manufacturing Plant. 4. BHUSAN POWER & STEEL LTD ,JHARSUGADA,ORISSA DEPUTY MANAGER, Electrical Electrical Maintenance of 130 x 2 MW Power Plant having CFBC Boiler. 5. Reliance Energy Ltd (WESCO LTD), Transmission & Distribution. DEPUTY MANAGER Technical ( Distribution & Transmission ) Electrical Maintenance & Project Management of Switchyard & Sub- Station. Dinesh Kumar Singh An achievement-driven professional targeting senior level assignment in Maintenance and Project Management preferably in Power Plant, Steel, Utility, Manufacturing industry Present Address: - Umiya Nagar, Mundra, Kutch, Gujarat. dksadani@gmail.com, dkstrf@gmail.com 9638447729 / 7573997564 July08Dec10
  • 2. Work Experience 1. TATA POWER LTD (For POWER MECH PROJECTS Ltd.), 4000 MW, MUNDRA, Gujarat. Jul16 Present AGM (EMD) Department Equipment Handled: ELECTRICAL MAINTENANCE Team Size: 75 Key Result Areas: Selecting control schemes, identifying appropriate system, managing enquiry specifications and selecting instruments as per type of application; managing the process instrumentation to optimize productivity Executing predictive & preventive maintenance schedules for electrical & instrument equipments as well as conducting regular shutdown inspections & replacements of spare parts to ensure smooth operations. Regular overall plant equipments preventive and predictive maintenance as per SAP PM Schedule. Manpower planning in MS Project for proper effective utilization. Various Electrical equipments :- Maintenance/CBM/Testing of GT/UT/UAT/Auxiliary Power Transformer up to 300 MVA , Outdoor Switchyard Maintenance of 400/200/33 KV and related equipments(LA/CVT/ISOLATOR/CT/PT/BREAKER etc ) . Indoor substation maintenance/CBM/Testing 33/11/6.6 KV having HT VCB( Siemens,ABB) .LT ACB ( Siemens,ABB) switchgear Panel , Numerical Relays ( ABB,Siemens ). Maintenance/CBM/Testing of 6.6 KV HT motor up to 1000MW & 415 V LT motors, Numerical Relays ( Siemens/ABB/AREVA ) ,Battery( Exide/HBL),UPS ( HIREL/EMERSION), DG up to 1.5 MVA,Air Compressor & Utilities. Various Instruments Equipments Maintenance/CBM/Testing of 6.6 kv & 680 v MV/LV VFD AC Drives (Siemens S120, G130 ABB ACS800, ACS2000). Maintenance of Proxy sensors, Transducers, Various network communication etc instruments equipments. Operation trouble shooting ideas in PLC (Siemens/ABB/ROCKWELL). Developing various innovative solutions to avoid repetitive failures & all other problems that adversely affect plant operations including capacity, quality, cost & regulatory compliance issues. Taken ownership in 5s,safety TPM activity & Energy Management to maintain safe and healthy work environment by enforcing standards Pivotal in streamlining processes through measures such as RCFA/FISH BONE ANALYSIS/WHY-WHY. 2. FLSMIDTH LTD (For Adani Port and Power Ltd.), Mundra, Gujarat Aug13 Jul16 Electrical Section Head (E & I) Department Team Size: 30 Equipment Handled: Port Equipments, Power Plant CHP/BOP, Steel Plant RMHS (Switchyard/MCC/PCC/AUTOMATION) Highlights: Reduced downtime by 0% (please mention) through measures such as RCM.
  • 3. Managing end-to-end projects from stage of tendering to handover involving finalization of technical specifications, planning & control, creation of reports & execution plans and manpower planning . Successfully executed plant expansion / modification / up gradation Electrical projects such as Conveyors, SUL, Wagon Tripler, Rake Loading System, Stacker - Reclaimer Recognized for increasing in-plant capability by 97% (please mention) through effective maintenance. Pivotal in streamlining processes through measures such as RCFA/FISH BONE ANALYSIS/WHY-WHY. Major Electrical & Instruments Equipments handled :- Conveyors, Ship loader, Ship unloader,, Wagon Tripler, Rake Loading System, Stacker Reclaimer etc. Maintenance/Testing/Project Management : Led overall maintenance of 132 KV Switch yard &Substation of Plant, HT & LT Motors, Power & Distribution Transformers, 1500 KVA DG Set, HT & LT Panels, 132 KV SF6 Circuit Breakers, 6.6 KV VCBs & 415 V ACBs, Electrical Switch Gear Siemens, ABB, and L&T etc, Power Transformers (up to 60 MVA) & All major Electrical Equipments ( HT & LT Motors, HT & LT Panels). Battery, UPS, APFC , Utilities , DG Set, Compressor and Lighting Systems Etc. maintenance & Testing of all the Equipments.33/11 KV indoor substation maintenance, HT/, LT PCC/PMCC feeders and all electrical utilities. Instruments Handled: Flow meters, level sensor, and proximity switch, belt-weighing system, fire-fighting system CCTV, AC VFD drives (Siemens, ABB),Level I Automation like PLC(Siemens, Rockwell,ABB),Drives ( ACS2000,ACS800.S120,G130).and so on. 3.TRF LTD A TATA ENTERPRISES, JamshedpurDec10 Aug13 Manager Electrical Team Size: 10 Highlights: Manufacturing Plant workshop overall Maintenance/Project Management/Commissioning/Testing:- Handled 132/11 KV switchyard and 11/.415 KV Indoor substation overall Maintenance of power transformers/ auxiliary distribution transformers, maintenance of HT/LT main & auxiliary, PCC/MCC feeders panel and motors panel with troubleshooting, routine maintenance with testing of Siemens Breaker & relays and so on. Preparing documentation for Electrical System and reviewing 3rd party drawings on installation & commissioning accordingly; updating tender documents (obtained firm construction bids from contractors & equipment vendors) and design / engineering documents prepared by Consultant / Principal-Engineering. Managing project activities with utilization of available resources & machine loading as per pre-set schedules; implementing cost saving measures to achieve reduction in terms of man days & production cost. Organize, coordinate & monitor execution & commissioning of small projects and major modifications works in time to achieve targeted results of Plant Project. 4.Bhushan Power & Steel, Jharsugada, Orissa Jul08 Dec10 Deputy Manager Team Size: 20 Highlights: Supervised the entire gamut of maintenance including Generator protection, AVR, UAT/GT/ST/power transformers/ auxiliary distribution transformers, maintenance of HT/LT main & auxiliary, PCC/MCC feeders panel and motors panel with troubleshooting, routine maintenance with testing of Siemens Breaker & relays and so on Performed routine maintenance of indoor VCB Breakers, Numerical relays, HT/LT motors, battery, earthing with safety, 220/33 KV switchyard maintenance of CB SF6 Breaker, CT, CVT, LA, earthing, battery, protection panel and so on.
  • 4. 5.WESCO Ltd., Orissa (a A Reliance Energy Ltd ) ,Semi Government Orissa Grid Corporation. Nov03 Jul08 Deputy Manager Transmission and Distribution Growth Path: Nov03 Nov04: GET Nov04 May07: Assistant Manager- Transmission and Distribution May07 Jul08: Deputy Manager Transmission and Distribution Team Size: 35 members of O&M team and 55 associates Highlights: Managed the entire Operation & Maintenance of 132/33 KV Grid & 33/11 KV distribution line Sub-Station. Site Survey, Construction & Inspection of distribution network (HT,LT ) & Distribution transformers. Preparation of Maintenance Schedule as per site survey and undertaking the same in a time bound manner. Conducted testing of Power & Distribution Transformer, CT, PT, LA, Isolator, CB, HT & LT Power Panel. Taken ownership in 5s,safety TPM activity & Energy Management to maintain safe and healthy work environment by enforcing standards procedure , complying with codes & regulations. Education B.E. (Electrical) from KITS, Bhubaneswar,Utkal University in 2002 full time with 66.40%. 12 th Science from CHSE Orissa Board in 1997 with 66 %. 10 th from HSC Orissa Board in 1995 with 73 %. IT Skills Microsoft Project-2007 ,MS Office , ERP Software- SAP PM Personal Details Date of Birth:4th May 1980 Languages Known: English, Hindi and Oriya Permanent Address: Plot No LCR-474,Phase- I,Chhend Colony,Rourkela,Orissa. Dinesh Kumar Singh.