Effectiveness of preventive maintenance in critical equip at Apollo tyres
INTRODUCTION AND OBJECTIVES.
OBJECTIVE
PRIMARY OBJECTIVE:
 To study the effectiveness of Preventive maintenance of critical equipment in Apollo Tyres.
SECONDARY OBJECTIVE:
 To analyse the mechanical down time and identify the opportunities of improvement of availability of critical
equipment.
Critical equipment  Dual Extruder and Calendar.
Tools used :
 OEE (Over all equipment effectiveness).
 OEE = Efficiency x Availability x Quality.
 Pareto Analysis  to find out major break downs.
Data Collection : Ten months data is used for analysis. And main emphasis is on secondary data.
 Primary Data :- Personal interview with maintenance department, production department, planning
department, quality control department and Industrial engineering department personals.
 Secondary Data :- Machine logs, Production reports, Company manuals, Industrial engineering journals.
LIMITATIONS.
 Due to confidentiality nature of quality and performance data, it was difficult to get certain details.
 Intervention from the employees union which made collection of data difficult.
OVER ALL EQUIPMENT
EFFECTIVENESS
 OEE OF CALENDAR
Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE
Jul-13 0.9803 0.9462 0.996 0.92385 92.38496
Aug-13 0.9573 0.8911 0.9958 0.849467 84.94672
Sep-13 0.9488 0.9695 0.9957 0.915906 91.59062
Oct-13 0.9095 0.8414 0.9954 0.761733 76.17331
Nov-13 0.9548 0.9305 0.9957 0.884621 88.46211
Dec-13 0.9671 0.9243 0.9958 0.890136 89.01362 0.95298 86.40747
Jan-14 0.9331 0.9629 0.9957 0.894619 89.46185
Feb-14 0.968 0.8806 0.996 0.849011 84.90111
Mar-14 0.9347 0.906 0.9962 0.84362 84.36202
Apr-14 0.9762 0.8512 0.9962 0.827784 82.77839
 OEE OF DUAL EXTRUDER
Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE
Jul-13 0.977 0.9221 0.916 0.82522 82.52
Aug-13 0.9091 0.8814 0.965 0.77324 77.32
Sep-13 0.9154 0.9121 0.932 0.77816 77.81
Oct-13 0.9264 0.8254 0.968 0.74018 74.01
Nov-13 0.9672 0.9157 0.956 0.8467 84.67
Dec-13 0.9034 0.9262 0.983 0.8225 82.25 0.928 79.11
Jan-14 0.9084 0.8949 0.968 0.78691 78.69
Feb-14 0.922 0.8493 0.986 0.77209 77.2
Mar-14 0.9081 0.878 0.971 0.77419 77.41
Apr-14 0.945 0.8656 0.979 0.7924 79.23
BREAK DOWN ANALYSIS
 Calendar.
 Total mechanical down = 306.67 hrs.
 From Pareto analysis we found out top 5
downtimes.
 That are Mill failure, Led off Feed roll break
failures, Feed conveyor related failures, mill
guide failures, Roller failures.
 Dual Extruder
 Total mechanical down = 541.43 hrs.
 From Pareto analysis we found out top 5
downtimes.
 That are Skiver not skiving, Mill break down,
head related general failures, Cooling conveyor
joint failures, belt conveyor failures.
0
10
20
30
40
50
60
70
80
90
100
0
1000
2000
3000
4000
5000
6000
7000
8000
Skivernotskiving
Millbreakdown
Headrelatedgeneral
coolingconveyor
Beltconveyorfailure
feedingmillbreak
temprature
Rollerconceyorfailure
speedfluctuation
Headrubberleakage
RubberJamBetween
Skiveranglevariation
stockloaderfailure
0
10
20
30
40
50
60
70
80
90
100
0
1000
2000
3000
4000
5000
6000
FINDINGS
CALENDAR
 The major five failures are Mill
failure, Led off Feed roll break
failures, Feed conveyor related
failures, mill guide failures, Roller
failures.
 After eliminating these failures:
 72.15% of reduction in total
mechanical break down.
 3.385% increase in availability, i.e. to
98.67%.
 3.07% increase in OEE, I.e. to
89.44%.
 Rs. 94667.1 reduction in terms of man
power cost.
DUAL EXTRUDER.
 The major five failures are Skiver
not skiving, Mill break down, head
related general failures, Cooling
conveyor joint failures, belt
conveyor failures.
 After eliminating these failures:
 80.12% of reduction in total
mechanical break down.
 6.9% increase in availability, i.e. to
99.72%.
 5.93% increase in OEE, I.e. to
85.04%.
 Rs. 122067.3 reduction in terms of
man power cost.
SUGGESTIONS
Effectiveness of preventive maintenance in critical equip at Apollo tyres
Effectiveness of preventive maintenance in critical equip at Apollo tyres

More Related Content

Effectiveness of preventive maintenance in critical equip at Apollo tyres

  • 2. INTRODUCTION AND OBJECTIVES. OBJECTIVE PRIMARY OBJECTIVE: To study the effectiveness of Preventive maintenance of critical equipment in Apollo Tyres. SECONDARY OBJECTIVE: To analyse the mechanical down time and identify the opportunities of improvement of availability of critical equipment. Critical equipment Dual Extruder and Calendar. Tools used : OEE (Over all equipment effectiveness). OEE = Efficiency x Availability x Quality. Pareto Analysis to find out major break downs. Data Collection : Ten months data is used for analysis. And main emphasis is on secondary data. Primary Data :- Personal interview with maintenance department, production department, planning department, quality control department and Industrial engineering department personals. Secondary Data :- Machine logs, Production reports, Company manuals, Industrial engineering journals. LIMITATIONS. Due to confidentiality nature of quality and performance data, it was difficult to get certain details. Intervention from the employees union which made collection of data difficult.
  • 3. OVER ALL EQUIPMENT EFFECTIVENESS OEE OF CALENDAR Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE Jul-13 0.9803 0.9462 0.996 0.92385 92.38496 Aug-13 0.9573 0.8911 0.9958 0.849467 84.94672 Sep-13 0.9488 0.9695 0.9957 0.915906 91.59062 Oct-13 0.9095 0.8414 0.9954 0.761733 76.17331 Nov-13 0.9548 0.9305 0.9957 0.884621 88.46211 Dec-13 0.9671 0.9243 0.9958 0.890136 89.01362 0.95298 86.40747 Jan-14 0.9331 0.9629 0.9957 0.894619 89.46185 Feb-14 0.968 0.8806 0.996 0.849011 84.90111 Mar-14 0.9347 0.906 0.9962 0.84362 84.36202 Apr-14 0.9762 0.8512 0.9962 0.827784 82.77839
  • 4. OEE OF DUAL EXTRUDER Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE Jul-13 0.977 0.9221 0.916 0.82522 82.52 Aug-13 0.9091 0.8814 0.965 0.77324 77.32 Sep-13 0.9154 0.9121 0.932 0.77816 77.81 Oct-13 0.9264 0.8254 0.968 0.74018 74.01 Nov-13 0.9672 0.9157 0.956 0.8467 84.67 Dec-13 0.9034 0.9262 0.983 0.8225 82.25 0.928 79.11 Jan-14 0.9084 0.8949 0.968 0.78691 78.69 Feb-14 0.922 0.8493 0.986 0.77209 77.2 Mar-14 0.9081 0.878 0.971 0.77419 77.41 Apr-14 0.945 0.8656 0.979 0.7924 79.23
  • 5. BREAK DOWN ANALYSIS Calendar. Total mechanical down = 306.67 hrs. From Pareto analysis we found out top 5 downtimes. That are Mill failure, Led off Feed roll break failures, Feed conveyor related failures, mill guide failures, Roller failures. Dual Extruder Total mechanical down = 541.43 hrs. From Pareto analysis we found out top 5 downtimes. That are Skiver not skiving, Mill break down, head related general failures, Cooling conveyor joint failures, belt conveyor failures. 0 10 20 30 40 50 60 70 80 90 100 0 1000 2000 3000 4000 5000 6000 7000 8000 Skivernotskiving Millbreakdown Headrelatedgeneral coolingconveyor Beltconveyorfailure feedingmillbreak temprature Rollerconceyorfailure speedfluctuation Headrubberleakage RubberJamBetween Skiveranglevariation stockloaderfailure 0 10 20 30 40 50 60 70 80 90 100 0 1000 2000 3000 4000 5000 6000
  • 6. FINDINGS CALENDAR The major five failures are Mill failure, Led off Feed roll break failures, Feed conveyor related failures, mill guide failures, Roller failures. After eliminating these failures: 72.15% of reduction in total mechanical break down. 3.385% increase in availability, i.e. to 98.67%. 3.07% increase in OEE, I.e. to 89.44%. Rs. 94667.1 reduction in terms of man power cost. DUAL EXTRUDER. The major five failures are Skiver not skiving, Mill break down, head related general failures, Cooling conveyor joint failures, belt conveyor failures. After eliminating these failures: 80.12% of reduction in total mechanical break down. 6.9% increase in availability, i.e. to 99.72%. 5.93% increase in OEE, I.e. to 85.04%. Rs. 122067.3 reduction in terms of man power cost.