Productivity Improvement Plan
            Year 2007, Q3


  Prepared: Jansen Cheng (Manufacturing
          Engineering Manager)
Review: P.C. Yeung ( Sr. Operation Manager )
Content¨Cmanpower reduction
¡ñ 1. Production line change to Stand up operation
¡ñ 2. Step up stencil
¡ñ 3. Recycle solder bar
¡ñ 4. FFC cable hand soldering
¡ñ 5. Component Preform automation
¡ñ 6. Outsource reduction
¡ñ 7. Electricity expense
Content
¡ñ 8. Standard time improvement
¡ñ 9. Inspection headcount
¡ñ 10. Floor space allocated

 ¡ñ Attached files : Details of this
   presentation please ref to the attached
   file:
manpower reduction 20070413.xls
Production line change to Stand up
Operators are stand up to work,
efficiency is increased by 5.7 % and up
to 20% in some case.
Floor space is increased by reclamation.




             Preform lines
Production line change to Stand up
Already implemented in Manual insertion,
WS and packaging lines, and most of the
Preform lines.




   Manual insertion       WS to packaging
Production line change to Stand up

¡ñ Nine of fourteen lines will change to
  Stand up operation before Jun.2007.

¡ñ Totally reduce 40 operators

¡ñ Responsible : M.E. Dept.
Step up stencil
Use "Step up stencil" to add extra
glue to the IC location. The ¡°hand-
add-glue¡± operator is saved.

                                            ͨ¹ý¿ªÉèÏò
                                            ÉϿ׶´£¬
                                            ¿ÉÒÔÔö¼ÓÑ¡
                                            ¶¨Ôª¼þ
                                            µÄ red glue
                                            ÓÃÁ¿¡£




 Before change        New Step up stencil
Step up stencil
 ¡ñ Affected 14 lines by reduce one
   operator per SMT line.
 ¡ñ Totally reduce 28 operators.
   Complete before May.31.
 ¡ñ Responsible : M.E. Dept.
Recycle solder bar
¡ñ Using Recycle machine to
  regenerate solder bar

¡ñ Saving is 7 % of monthly solder
  consumption

 ¡ñ Countermeasure to rising price of
SAC305 solder
Recycle solder bar - RoHS
Compliance Test
¡ñ The sample will also be subjected to
  RoHS compliance testing using XRF
  analyzer in our QRS Lab.

¡ñ Responsible : QA
FFC cable hand soldering
¡ñ Replace hand soldering process by
  Heat seal machine to solder FFC.
¡ñ Total reduce 22 operators.
¡ñ Complete date: Jul.2007
¡ñ Responsible: M.E. dept.




 Heat seal machine
Component Preform automation
¡ñ Hand cutting lead change to
  machine cutting.

¡ñ Two operators is saved. Affected 6
  lines.

¡ñ Responsible: PIE dept.
Outsource reduction
 ¡ñ Add new Auto-insertion line in
Production and reduce outsource
equivalent line equals to 2 lines.

¡ñ Complete by: Apr.07
¡ñ Responsible: M.E. dept.
Electricity expense
¡ñ Use city electricity to replace power
  generator in-house. The electricity
  cost is reduced.

¡ñ Responsible: PTE dept
Standard time improvement
¡ñ Work with CEE to improve std time.

¡ñ Continuous improvement by regular
  review of std time.

¡ñ Responsile: CEE, M.E.dept. and
  Production
Attached file
¡ñ manpower reduction 20070413
  (rev1).xls, this file is delibrately
  deleted to protect intellectual
  privacy.
¡ñ The content of this presentation file
  is not allowed to reproduce without
  permission of the author.

More Related Content

Ems Productivity Improvement Apr 07

  • 1. Productivity Improvement Plan Year 2007, Q3 Prepared: Jansen Cheng (Manufacturing Engineering Manager) Review: P.C. Yeung ( Sr. Operation Manager )
  • 2. Content¨Cmanpower reduction ¡ñ 1. Production line change to Stand up operation ¡ñ 2. Step up stencil ¡ñ 3. Recycle solder bar ¡ñ 4. FFC cable hand soldering ¡ñ 5. Component Preform automation ¡ñ 6. Outsource reduction ¡ñ 7. Electricity expense
  • 3. Content ¡ñ 8. Standard time improvement ¡ñ 9. Inspection headcount ¡ñ 10. Floor space allocated ¡ñ Attached files : Details of this presentation please ref to the attached file: manpower reduction 20070413.xls
  • 4. Production line change to Stand up Operators are stand up to work, efficiency is increased by 5.7 % and up to 20% in some case. Floor space is increased by reclamation. Preform lines
  • 5. Production line change to Stand up Already implemented in Manual insertion, WS and packaging lines, and most of the Preform lines. Manual insertion WS to packaging
  • 6. Production line change to Stand up ¡ñ Nine of fourteen lines will change to Stand up operation before Jun.2007. ¡ñ Totally reduce 40 operators ¡ñ Responsible : M.E. Dept.
  • 7. Step up stencil Use "Step up stencil" to add extra glue to the IC location. The ¡°hand- add-glue¡± operator is saved. ͨ¹ý¿ªÉèÏò ÉϿ׶´£¬ ¿ÉÒÔÔö¼ÓÑ¡ ¶¨Ôª¼þ µÄ red glue ÓÃÁ¿¡£ Before change New Step up stencil
  • 8. Step up stencil ¡ñ Affected 14 lines by reduce one operator per SMT line. ¡ñ Totally reduce 28 operators. Complete before May.31. ¡ñ Responsible : M.E. Dept.
  • 9. Recycle solder bar ¡ñ Using Recycle machine to regenerate solder bar ¡ñ Saving is 7 % of monthly solder consumption ¡ñ Countermeasure to rising price of SAC305 solder
  • 10. Recycle solder bar - RoHS Compliance Test ¡ñ The sample will also be subjected to RoHS compliance testing using XRF analyzer in our QRS Lab. ¡ñ Responsible : QA
  • 11. FFC cable hand soldering ¡ñ Replace hand soldering process by Heat seal machine to solder FFC. ¡ñ Total reduce 22 operators. ¡ñ Complete date: Jul.2007 ¡ñ Responsible: M.E. dept. Heat seal machine
  • 12. Component Preform automation ¡ñ Hand cutting lead change to machine cutting. ¡ñ Two operators is saved. Affected 6 lines. ¡ñ Responsible: PIE dept.
  • 13. Outsource reduction ¡ñ Add new Auto-insertion line in Production and reduce outsource equivalent line equals to 2 lines. ¡ñ Complete by: Apr.07 ¡ñ Responsible: M.E. dept.
  • 14. Electricity expense ¡ñ Use city electricity to replace power generator in-house. The electricity cost is reduced. ¡ñ Responsible: PTE dept
  • 15. Standard time improvement ¡ñ Work with CEE to improve std time. ¡ñ Continuous improvement by regular review of std time. ¡ñ Responsile: CEE, M.E.dept. and Production
  • 16. Attached file ¡ñ manpower reduction 20070413 (rev1).xls, this file is delibrately deleted to protect intellectual privacy. ¡ñ The content of this presentation file is not allowed to reproduce without permission of the author.