ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Energy loss reduction initiatives
for Distribution Networks
Amit Bhatia
abhatia@raychemrpg.com
Innovation at work
Energy Loss Stages
Conversion
65%
Transmission
2%
Distribution
3%
India loses
over 20%
Energy
Not
Supplied
Non-
Technical
Losses
Technical
Losses
Technical
Losses
Low
Power Quality
Harmonics
Poor Power
Factor
Flicker &
Transients
Frequency
Variation
Transformer
Losses
No Load Losses
Load Losses
I2R Losses
Connector
Losses
Cable Losses
Non-Linear
Loads
Inductive
Loads
Insulator
Leakages
Secondary
Energy
Sources
Improper
Grounding
Eddy
Current
Losses
Hysteresis
Losses
Dielectric
Losses
Winding
Losses
Stray Losses
Unbalance Harmonics
Peak Load
Variance
Improper
Installation /
Loose
contacts
Insufficient
Contact
Area
Unbalance
Cable /
Conductor
Overloading
Strand
Loosening Undersized
cables/condu
ctors
Peak Load
Variance
I2R Losses
LV Loss Zones
• Transformer Connections
• ACB Connections
• Feeder Pillar Connections
• Distribution Box connections
• Meter Connections
• LV ABC Connections
• D Loops / Binding wire
Service Connections
LVDS carries High Currents
Each Connection generates a heat loss
Every
Connection
counts
Equipment ~Loss Per Annum With
Conventional/ Existing
Connection System
Loss / p.a. for
1000 Nos.
population
Transformer 11kV/415 V
( 1 MVA)
INR 55000 INR 5.50 Crs
ACB 2000A INR 13000 INR 1.3 Crs
PG Clamp Dog to Dog INR 2000 INR 0.20 Crs
Total Annual Loss INR 7 Crs
Conventional connectors have high I Square R Losses
1 Unit = INR 5/-
Excludes Cost of
equipment failure
and revenue loss
Example
Transformer Connector
Shear Bolt Technology
Wedge Connectors
~80% Loss
reduction* over
Conventional
Connectors
* Source: Case Study: CR Values established in
Delhi Utilities & SARI Report US AID
Loss Reduction Initiatives
Low Resistance Connector Systems
LVDS: Non-Technical Losses
Non-
Technical
Losses
Metering
Losses
Faulty Meters
Tampered Meters
CT / PT Errors
No DT Metering
No Energy Audits
Theft
Bare Conductors /
LV ABC / Service cables
Transformers/ Distribution
Boxes / FP / Meters
Billing
Errors
Incorrect Billing
Defaulters
unpunished
Theft of Electricity
• Direct Hooking on Bare OH / Transformers / Distribution Boxes
• Nails/ Insulation Piercing Connectors on LV ABC / Service Cables
• Energy Meter Bye Pass
Theft Reduction Initiatives
Co-Axial Power Cables
Anti Theft Cables &
Connector Systems
Underground LT Feed Connection SystemsAntitheft Distribution Boxes
Plugin Meter Enclosures
Next Steps :- Three Stage Distribution ?
11kV / 1 kV / 0.415 kV
Thanks
abhatia@raychemrpg.com
Innovation at work

More Related Content

Energy Loss Reduction Initiatives

  • 1. Energy loss reduction initiatives for Distribution Networks Amit Bhatia abhatia@raychemrpg.com Innovation at work
  • 2. Energy Loss Stages Conversion 65% Transmission 2% Distribution 3% India loses over 20% Energy Not Supplied Non- Technical Losses Technical Losses
  • 3. Technical Losses Low Power Quality Harmonics Poor Power Factor Flicker & Transients Frequency Variation Transformer Losses No Load Losses Load Losses I2R Losses Connector Losses Cable Losses Non-Linear Loads Inductive Loads Insulator Leakages Secondary Energy Sources Improper Grounding Eddy Current Losses Hysteresis Losses Dielectric Losses Winding Losses Stray Losses Unbalance Harmonics Peak Load Variance Improper Installation / Loose contacts Insufficient Contact Area Unbalance Cable / Conductor Overloading Strand Loosening Undersized cables/condu ctors Peak Load Variance
  • 4. I2R Losses LV Loss Zones • Transformer Connections • ACB Connections • Feeder Pillar Connections • Distribution Box connections • Meter Connections • LV ABC Connections • D Loops / Binding wire Service Connections LVDS carries High Currents Each Connection generates a heat loss Every Connection counts
  • 5. Equipment ~Loss Per Annum With Conventional/ Existing Connection System Loss / p.a. for 1000 Nos. population Transformer 11kV/415 V ( 1 MVA) INR 55000 INR 5.50 Crs ACB 2000A INR 13000 INR 1.3 Crs PG Clamp Dog to Dog INR 2000 INR 0.20 Crs Total Annual Loss INR 7 Crs Conventional connectors have high I Square R Losses 1 Unit = INR 5/- Excludes Cost of equipment failure and revenue loss Example
  • 6. Transformer Connector Shear Bolt Technology Wedge Connectors ~80% Loss reduction* over Conventional Connectors * Source: Case Study: CR Values established in Delhi Utilities & SARI Report US AID Loss Reduction Initiatives Low Resistance Connector Systems
  • 7. LVDS: Non-Technical Losses Non- Technical Losses Metering Losses Faulty Meters Tampered Meters CT / PT Errors No DT Metering No Energy Audits Theft Bare Conductors / LV ABC / Service cables Transformers/ Distribution Boxes / FP / Meters Billing Errors Incorrect Billing Defaulters unpunished
  • 8. Theft of Electricity • Direct Hooking on Bare OH / Transformers / Distribution Boxes • Nails/ Insulation Piercing Connectors on LV ABC / Service Cables • Energy Meter Bye Pass
  • 9. Theft Reduction Initiatives Co-Axial Power Cables Anti Theft Cables & Connector Systems
  • 10. Underground LT Feed Connection SystemsAntitheft Distribution Boxes Plugin Meter Enclosures
  • 11. Next Steps :- Three Stage Distribution ? 11kV / 1 kV / 0.415 kV