This resume summarizes the career experience of Mr. Pronpot Petlom, a 47-year-old Thai mechanical engineer. He has over 25 years of experience in air conditioning and ventilation system design, project management, and sales. His most recent role is as a Senior M&E Engineer at KCU Service Co., Ltd where he oversees M&E projects such as the Singha Complex, a 39-floor office building and 7-floor podium with a total area of 140,000 sqm. Prior to this, he held various engineering and project management roles at companies such as SEM Engineering Consultant Co. and Thai Tasaki Engineering Co. Ltd.
2. 2
JOB REFERRENCE
1. DESIGN & PROJECT CO. FOR BAAN CHANG GLASS HAUS OFFICE BUILDING PROJECT
PAKAGED OR SELF CONTAIN UNIT WATER COOLED SYSTEM ,FULLY AIR DUCT SYSTEM
EXHAUST AIR SYSTEM
2. DESIGH & PROJECT CO. FOR PHAHOLYOTIN PLACE BUILDING PROJECT
PAKAGED OR SELF CONTAIN UNIT WATER COOLED SYSTEM , EXHAUST AIR SYSTEM
3. DESIGN & PROJECT CO. FOR VANIT 2 OFFICE BUILDING PROJECT
2000 TONR WATER COOLED CHILLER , PRIMARY & SECONDARY PUMP AND PLATE HEAT
EXCHANGER FOR INTERMIDATE SYSTEM , FULLY AIR DUCT SYSTEM ,PRESSUERIZED STAIR
WELL SYSTEM
4. DESIGN & PROJECT CO. FOR THE FUTURE PARK BANG KAE SHOPPING MALL CENTER
5000 TONR WATER COOLED CHILLER WITH PRIMARY AND SECONDARY PUMP SYSTEM ,
CHILLER MANAGER CONTROL SYSTEM , SPLIT TYPE SYSTEM ,FULLY AIR DUCT SYSTEM,
KITCHEN EXHAUST SYSTEM , PRESSURIZED STAIR WELL SYSTEM
5. DESIGN & PROJECT CO. FOR ROBINSON SEACON SQUARE DEPARTMENT STORE
600 TONR WATER COOLED CHILLER WITH PRIMARY AND SECONDARY PUMP SYSTEM ,
CHILLER MANAGER CONTROL SYSTEM , SPLIT TYPE SYSTEM ,FULLY AIR DUCT SYSTEM
KITCHEN EXHAUST SYSTEM ,
6.DESIGN & PROJECT CO. FOR THE MONARCH LEE GARDEN HOTEL PROJECT ( WATER
1500 TONR WATER COOLED CHILLER WITH PRIMARY AND SECONDARY PUMP SYSTEM ,
CHILLER MANAGER CONTROL SYSTEM , SPLIT TYPE SYSTEM , KITCHEN EXHAUST SYSTEM ,
PRESSURIZED STAIR WELL SYSTEM
7.DESIGN & PROJECT CO. FOR ROBINSON CHANTABURI DEPARTMENT STORE PROJECT
2000 TONR WATER COOLED CHILLER WITH PRIMARY AND SECONDARY PUMP SYSTEM ,
CHILLER MANAGER CONTROL SYSTEM , SPLIT TYPE SYSTEM , KITCHEN EXHAUST SYSTEM ,
PRESSURIZED STAIR WELL SYSTEM
8.DESIGN & PROJECT CO. FOR ITALIAN THAI TOWER OFFICE BUILDING PROJECT ( WATER
2400 TONR WATER COOLED CHILLER WITH PRIMARY AND SECONDARY PUMP SYSTEM ,
CHILLER MANAGER CONTROL SYSTEM , SPLIT TYPE SYSTEM , FULLY AIR DUCT SYSTEM ,
PRESSURIZED STAIR WELL SYSTEM
9.DESIGN & PROJECT CO. FOR CMIC TOWER OFFICE BUILDING PROJECT
PAKAGED OR SELF CONTAIN UNIT WATER COOLED SYSTEM , EXHAUST AIR SYSTEM
4. 4
SEP 2008 ‐ OCT 2014 THAI POLYMER SUPPLY CO,.LTD
PRODUCT
1. HITACHI CHILLER ( 2008‐2009 ) POSITION : PROJECT SALES EXECUTIVE
1.1. AIR COOLED SCREW CHILLER
1.2. WATER COOLED SCREW CHILLER
2. WILO PUMP ( 2009‐2011) POSITION : PROJECT SALES EXECUTIVE
2.1. SPLIT CASE CENTRIFUGAL PUMP
2.2. END SUCTION CENTRIFUGAL PUMP
2.3. BOOSTER PUMP SET
2.4. DRAINAGE SUBMERSIBLE PUMP
2.5. VERTICAL TURBINE PUMP
3. “REHAU “ PP DRAINAGE PIPE , PEX PIPE COLD&HOT PIPE 2011‐2014
JOB POSITION SALES MANAGER
JOB DESCRIPTION
‐ SALES TEAM MANAGEMENT
‐ BUSINESS & MARKETING PLAN
‐ OVERSEA CONTACTING ( TECHNICAL PROBLEM , PRICE ,ETC )
‐ STOCK PLANNING
‐ PRESENT FOR CUSTOMER
‐ COORDINATE WITH DESIGNER , QS , OWNER , CM ETC.
‐ TECHNICAL SUPPORT
‐ PREPARE APPROVED DOCUMENT & MATERIAL COMPARISION
‐ PRODUCT TRAINING
ENGINEERING JOB REFFERENCE ( FREELANCE JOB )
‐ M&E ( AC , SN ,FP & EE ) DESIGN PROJECT CO ORINATE & JOB MANAGEMENT FOR SOUTH
WAVE APARTMENT PATAYA WITH EP CONSULTANT CO.,LTD
‐ M&E ( AC , SN ,FP & EE ) DESIGN PROJECT CO ORINATE & JOB MANAGEMENT FOR BODY
GLOVE OFFICE & SHOWROOM WITH EP CONSULTANT CO.,LTD
‐ M&E ( AC , SN ,FP & EE ) DESIGN PROJECT CO ORINATE & JOB MANAGEMENT FOR THE
MARINE RESORT WITH EP CONSULTANT CO.,LTD
‐ M&E ( AC , SN ,FP & EE ) DESIGN PROJECT CO ORINATE & JOB MANAGEMENT FOR THE
LA VANICE BOUTIQUE HOTEL BANGKOK WITH EP CONSULTANT CO.,LTD
‐ AIR CONDITIONING ( VRV SYSTEM ) AND VENTILATION SYSTEM CONSULTING FOR THAI
KK OFFICE AND SHOWROOM BUILDING WITH EP CONSULTANT CO.,LTD
‐ CHILLED WATER ( 20HP 5 SET ) PUMP OVERHAUL FOR CHULABHORN RESEARH INSTITUE
• IMPELLER
• PUMP SHAFT
• BEARING
• MECHANICAL SEAL
• COUPLING
5. 5
• MOTOR COIL REPAIR
• MAGNETIC CONTACTOR
• BUTTER FLY VAVLE
‐ STATIONARY OVER HEAD CRANE INSPECTOR FOR TPC STAINLESS STEEL & FASTENER
FACTORY
‐ STATIONARY CRANE INSPECTOR FOR PINIC PLAS INDUSTRIAL FACTORY
OCT 2014 ‐ PRESENT KCU SERVICE CO.,LTD
POSITION PROJECT : SENIOR M&E ENGINEER
JOB DESCRIPTION M& E PROJECT SCHEDULE PLANNING
M&E DRAWING , SPECIFICATION INSPECTION
CO ORNIDATE WITH M&E DESIGNER , CONTRACTOR AND SUPPLIER
PREPARE SPECIFICATION & TECHNICAL SUPPORT
MATERIAL & SHOP DRAWING APPROVE
JOB HANDLE
1. SINGHA COMPLEX
DETAIL 39 FLOOR OFFICE BUILDING AND 7 FLOOR PODIUM
AREA 140,000 SQ.M
‐
CONTACT LIST
‐ M&E ENGINEERING 49 LIMITED
‐ ALTUS GROUP (PAGE KIRKLAND )
‐ KPK QUANTITY SERVEYOR
‐ COST PLAN CO.,LTD
‐ EEC NETWORK CO.,LTD
‐ EEC WSP CO.,LTD
‐ STONEHENCE
‐ MEIHARTD (THAILAND )
‐ OPTIMUM CONSULTANT CO.,LTD
‐ MITR TECHNICAL CONSULTANT CO.,LTD
‐ ITALTHAI DEVELOPMENT
‐ PROJECT ASIA
‐ SINO‐THAI ENGINEERING & CONSRUCTION CO.,LTD
‐ SOUTHEAST ASIA TECHNOLOGY CO.,LTD
‐ PROFESSIONAL SYSTEM ENGINEERING CO.,LTD
6. 6
‐ DYNAMIC ENGINEERING CONSULTANTS CO.,LTD
‐ CHUCHAWAL ROYAL HASKONING CO.,LTD
‐ ENGINEERING TECHNOLOGY CONSULTANT CO.,LTD
‐ PALMER & TURNER THAILAND
‐ JADINE ENGINEERING CO.,LTD
‐ ETC
SPECIAL ABILITY
‐ COMPUTOR WORD , EXCEL ,ACAD
‐ DRIVING CAR
‐ ENGLISH WRITING & SPEAKING
REFFERENCE
‐ MR.SOMCHAI KUVASANON PRESIDENT AT OPTIMUM CONSULTANT (SEM CONSULTANT
JOB REFFERENCE ) 083 611 3553
‐ MR.BUNPOT CHOEYSA‐ARD ,EXECUTIVE DIRECTOR AT ENTECH ( SEM CONSULTANT JOB
REFFERENCE ) 081 720 5613
‐ MR.PREAT ATIPRAYOON , MANAGING DIRECTOR AT THAI TASAKI ENGINEERING CO.,LTD
02 312 3995‐8
‐ MR. UDOMSUK , MANAGING DIRECTOR AT EP CONSULTANT CO.,LTD 083 665 5456
‐ MR. WASIN, MANAGING DIRECTOR AT DESIGN ALLIANCE CO.,LTD 081 903 9857