Estimation of a project cost begins with this page. This is where material items that are required for a project has 
been entered. While entering the material item, the estimated price of the item will be reflected in the column 
alongside as per the last purchased rate, which will be fetched from the item master page. Item-line wise cost of 
each materials will be displayed that can be added up to get the total cost of material required for the project.
3 
3 
3 
BOQ 
Where you can add new BOQ details from this form. 
Show list of item and its details 
which you enter 
Save your details
4 
4 
4 
BOQ Services 
Add new services 
Where you can add extra service along with the items
5 
5 
5 
Add Material(Tools Rate) 
Out generated from 
master 
Your default set rate 
System generated 
amount as per default 
rate set 
List of your entered items
6 
6 
6 
Installation (Tools Rate) 
The man power expenses or labour charge for the project that being carried out can be estimated using this page. 
Tool rate that are required to carry out the labour work along with the labour charge can be summed up and the 
total labour charge can be calculated using this page. 
System generated 
amount as per default 
rate set 
List of added items Resource involved in project 
with their wages 
Assign Resources 
for project
It is a common practice for project-based companies go for hiring services as all the services may not be 
functioning under their wing. Or sometime they are forced to hire equipments that are also considered services. 
Any hiring services that are hired by the company can be estimated and managed through this page, which will be 
ultimately reflected in the final estimate. 
7 
7 
7 
Subcontract(Hiring) 
Select your resource type Unit of Measurement Auto generated amount
8 
8 
8 
Add on Master 
Incurring additional expense is a common scenario as far as a project-industry work is concerned. 
Additional cost like freight, loading, unloading, commissions cannot be avoided and these 
expenses, which falls under the additional expenses or Add on charges can be included in the 
final estimation using this module. 
Select add on type 
Select profit type 
Select the category on which 
you want to rate your user
9 
9 
9 
Contact Us 
Address 
TMA House, 1st Floor, Road No:16 
Plot No. 6, Wagle Industrial Estate 
Thane (West) 400 604, Maharashtra 
+91 22 41118000/8049(50 lines) 
www.eresourceerp.com
9 
9 
9 
Contact Us 
Address 
TMA House, 1st Floor, Road No:16 
Plot No. 6, Wagle Industrial Estate 
Thane (West) 400 604, Maharashtra 
+91 22 41118000/8049(50 lines) 
www.eresourceerp.com

More Related Content

Estimation

  • 1. 1 1 1 eresource nfra ERP Estimation Module
  • 2. 2 2 2 Estimation of a project cost begins with this page. This is where material items that are required for a project has been entered. While entering the material item, the estimated price of the item will be reflected in the column alongside as per the last purchased rate, which will be fetched from the item master page. Item-line wise cost of each materials will be displayed that can be added up to get the total cost of material required for the project.
  • 3. 3 3 3 BOQ Where you can add new BOQ details from this form. Show list of item and its details which you enter Save your details
  • 4. 4 4 4 BOQ Services Add new services Where you can add extra service along with the items
  • 5. 5 5 5 Add Material(Tools Rate) Out generated from master Your default set rate System generated amount as per default rate set List of your entered items
  • 6. 6 6 6 Installation (Tools Rate) The man power expenses or labour charge for the project that being carried out can be estimated using this page. Tool rate that are required to carry out the labour work along with the labour charge can be summed up and the total labour charge can be calculated using this page. System generated amount as per default rate set List of added items Resource involved in project with their wages Assign Resources for project
  • 7. It is a common practice for project-based companies go for hiring services as all the services may not be functioning under their wing. Or sometime they are forced to hire equipments that are also considered services. Any hiring services that are hired by the company can be estimated and managed through this page, which will be ultimately reflected in the final estimate. 7 7 7 Subcontract(Hiring) Select your resource type Unit of Measurement Auto generated amount
  • 8. 8 8 8 Add on Master Incurring additional expense is a common scenario as far as a project-industry work is concerned. Additional cost like freight, loading, unloading, commissions cannot be avoided and these expenses, which falls under the additional expenses or Add on charges can be included in the final estimation using this module. Select add on type Select profit type Select the category on which you want to rate your user
  • 9. 9 9 9 Contact Us Address TMA House, 1st Floor, Road No:16 Plot No. 6, Wagle Industrial Estate Thane (West) 400 604, Maharashtra +91 22 41118000/8049(50 lines) www.eresourceerp.com
  • 10. 9 9 9 Contact Us Address TMA House, 1st Floor, Road No:16 Plot No. 6, Wagle Industrial Estate Thane (West) 400 604, Maharashtra +91 22 41118000/8049(50 lines) www.eresourceerp.com