We SmCians have gone to Tiruppur at the construction stage of Flyover near Busstand by Siva Construction and undergone an implant training with the guidance of Site Engineer.
2. DESCRIPTION
Cast in-situ method,
Duration of 24months,
Estimation approx. INR52Cr.
17 Piers of isolated footing
Shallow foundation of 3m depth
16 Spans ( 4 curved Spans )
2
3. DESIGN DESCRIPTIONS
Normal C/C distance of the pier( length of the span )
is 18m.
C/C distance is 30m in the area of roundabout.
M35 Grade of concrete is used in casting all except
Crash barrier (M40).
Self weight of Span is 800 Tons and so it can
withstand nearly 1000 Tons.
3
6. DETAILS OF GRIDERS
4 Girders are used in the span of 18m
7 Girders are used in the span of 30m
Web width 250mm
Flange width 600mm
Depth of the Girder 900mm
6
14. BEARINGS SPECIFICATION
80mm thickness ELASTOMETRIC NEOPRINE
BEARING was used for Symmetrical Span.
PDFE POT BEARING was used for Obligatory
Span (30m).
14