ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Gasification Process
Equipment Process




            Cameron, Louisiana
Unit Basics
Process Flow Chart
Vitrification process for ASH or Sludge


                                                         Alkali or DI Water




                fuel       Reheat combustion             Shower filter          Natural, DI Filter    Emission
                                                  900℃                    50℃
                                  800℃

                 Feeder             combustion                 fuel                 Wastewater        Discharge
                                                                                    Treatment
  Multi waste                       1000℃
                                                 1700℃

                                                                                                     Heavy metal
                               1400℃             Melting pot                                          Recovery



                  Sludge             Ash




                            Vitrification
Layout
Air Pollution Prevention
Wet Scrubber




           ZIP of perfect pour of poisonous gas (river and mountain, river alkali command) and cinder catcher
        ability
           Channel Effect control System
           Over-Flow control System by absorption woe real form
           Lime gemstone wastewater neutralization processing System
SDR




      Class agenda reaction installment is composition to dosing device, reaction equipment
      and activated carbon supply equipment greatly

      After combustion gas that is flowed in revolution kind class agenda reaction tower is
      shared by equality magnification rotating by guide vane(Guide Vane) looking downward
      inflow do and agent and reaction which combustion gas(HC ℓ, SOχ, HF etc.) is driven by
      nozzle as warm current is formed here are enlargement efficiently

      Because activated carbon is spouted to Hudan dioxin(DIOXINS) among combustion gas
      exclusion
Bag Filtration System
Hepa Filtration
Operational Temperatures


 40.30                       90°C    23.20



                                      4.29
                             25°C
 19.98

                             900°C   11.95
                 2ton/day

 23.90
                            1400°C   44.72


         84.18              84.16
Operational Temperature
Information

      Upper Level
           H2O fuel Maintain high temp with low cost.
       Inside layer of pot with H2O-Side Burner
        (FIRE TEMP1700℃+)

      Mid Level
          (1500C-1700℃)
       Melting pot Entrance to Center of pot (1300-1400℃)

      Lower Level
         ( Temp.: 928C-1500℃)
Melting Pot Structure and Features
Major Equipment Elements




         H202 Gas Generator   FLOW CHART
Waste Heat Boiler
Waste Heat Boiler Diagram
Sludge
                (Water 80%)
                                           Sludge Recycling
          Sludge Feeder                                                         Medium Oil Tank
                                 <Steam>
Surplus Steam                                      Mixing and Heating Tank
   Air Control
     Facility
                               Boiler

  Vacuum Pump                 Gas
                                                        Decompressed
      <Gas>             <Vapor>                            Evaporator

    Condenser

      <Water>                                            Feeding Tank
   Oil Separator              <Oil>
                                                        Solid Separator        Recycled Oil
  Water Treatment                          <Gas>
      Facility
                                           Fuel          <Dried Sludge>
                                           Steam          (Water 1%, Oil 1%)
        Discharge                                           (4,000kcal/kg)

More Related Content

Gasification Process

  • 2. Equipment Process Cameron, Louisiana
  • 5. Vitrification process for ASH or Sludge Alkali or DI Water fuel Reheat combustion Shower filter Natural, DI Filter Emission 900℃ 50℃ 800℃ Feeder combustion fuel Wastewater Discharge Treatment Multi waste 1000℃ 1700℃ Heavy metal 1400℃ Melting pot Recovery Sludge Ash Vitrification
  • 8. Wet Scrubber ZIP of perfect pour of poisonous gas (river and mountain, river alkali command) and cinder catcher ability Channel Effect control System Over-Flow control System by absorption woe real form Lime gemstone wastewater neutralization processing System
  • 9. SDR Class agenda reaction installment is composition to dosing device, reaction equipment and activated carbon supply equipment greatly After combustion gas that is flowed in revolution kind class agenda reaction tower is shared by equality magnification rotating by guide vane(Guide Vane) looking downward inflow do and agent and reaction which combustion gas(HC â„“, SOχ, HF etc.) is driven by nozzle as warm current is formed here are enlargement efficiently Because activated carbon is spouted to Hudan dioxin(DIOXINS) among combustion gas exclusion
  • 12. Operational Temperatures 40.30 90°C 23.20 4.29 25°C 19.98 900°C 11.95 2ton/day 23.90 1400°C 44.72 84.18 84.16
  • 13. Operational Temperature Information Upper Level H2O fuel Maintain high temp with low cost.  Inside layer of pot with H2O-Side Burner (FIRE TEMP1700℃+) Mid Level  (1500C-1700℃)  Melting pot Entrance to Center of pot (1300-1400℃) Lower Level ( Temp.: 928C-1500℃)
  • 14. Melting Pot Structure and Features
  • 15. Major Equipment Elements H202 Gas Generator FLOW CHART
  • 17. Waste Heat Boiler Diagram
  • 18. Sludge (Water 80%) Sludge Recycling Sludge Feeder Medium Oil Tank <Steam> Surplus Steam Mixing and Heating Tank Air Control Facility Boiler Vacuum Pump Gas Decompressed <Gas> <Vapor> Evaporator Condenser <Water> Feeding Tank Oil Separator <Oil> Solid Separator Recycled Oil Water Treatment <Gas> Facility Fuel <Dried Sludge> Steam (Water 1%, Oil 1%) Discharge (4,000kcal/kg)