This document discusses infrastructure modeling and intelligent city planning. It provides examples of digital infrastructure modeling projects from around the world, including Mexico City, Dubai, Helsinki, and several organizations in Hong Kong modeling infrastructure such as housing, airports, drainage systems, highways and rail. The document also discusses the Crossrail project in London as a case study for using digital infrastructure modeling and asset information management to improve cost certainty, reduce risks, and increase efficiency of a large-scale transportation project.
1 of 43
Download to read offline
More Related Content
Geosmart hong kong 2014 v8 for linkedin
1. 1 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated1 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Infrastructure Modeling
The Foundation of every
Intelligent City
JB Monnier, Ph.D.
Senior VP Bentley Asia Pacific
19 July 2015
4. 4 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Bentley Infrastructure 500 Top Owners
Infrastructure value : US$13T
www.bentley.com/500
Bentley Infrastructure 500
Top Owners
www.bentley.com/500
5. 5 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Oxford Economics¡¯ Global Cities 2030
How the global urban landscape will look in 2030
6. 6 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
The Global 750: forecasting the urban world to 2030
GDP
7. 7 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Cities w/ biggest increase in GDP by 2030.
? 7/10 in China
? 67% of $3.8T in GDP growth in China
8. 8 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Cities w/ biggest incr. in consumer spending by 2030?
? Of the top 10 cities, 6 in Asia
? Of $1.4T, 60% in Asia
9. 9 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Secretar¨ªa de Finanzas del
Distrito Federal
Mexico City 3D Cadastre
Mexico
3Deling Sp. z o.o.
Laser Scanning of Dubai
Heritage Buildings
U.A.E.
Helsinki City Planning Dept.
Helsinki City Planning
Finland
11. 11 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
HK Housing Authority
Drawing Management System
Image from www.skyplangroup.com
CEDD
Engineering Design
Highways Department
Engineering Design
Lands Department
Mapping
Planning Department
Mapping & Planning
Transport Department
Traffic Sign Tool
Drainage Service Department
AM/FM
MTR
Content Management System
Railway Design
HK Airport Authority
Airport Design
CLP
Planning & Design
12. 12 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Hong Kong Housing (e)Authority
? Estate Management Division
? Permitting information systems
? Secure collaborative systems
? Transmittal and Electronic
Submission systems
? Thousands of users?????
? Millions of documents
13. 13 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Hong Kong Airport (e) Authority
? Midfield Concourse includes a 100,000-square-meter
? Pre-construction & post construction
? Asset Management
? Facility Management
14. 14 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Hong Kong Drainage Services Department
15. 15 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Hong Kong Sludge Treatment Facility
? Incinerate 2,000 tons per day & generate power for the
grid
? Multi-disciplinary JV for design
? Handover to operation and maintenance.
? Infrastructure performance
16. 16 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Hong Kong Highway Department
& Stonecutters Bridge
? Main span of 1018 meters
? ??? Inspcetion ???
? Now working on Zhuhai-Macao Bridge
24. 24 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Power of Information Mobility
25. 25 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
The Benefits of Intelligent 3D City Models
? Enhanced communication via visualization
? Better plans
? Better designs
? Better analysis
? More resilient cities
26. 26 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
3D GIS Applied to Cadastre
? Represent property ownership in 3D
? Create valid volumetric geometries efficiently
? Detect interference between objects, using clash detection
? Manage and share 3D cadastre information, with a 3D spatial database
? Use point clouds to support the direct drawing of the 3D property
Point clouds (1) to building sections (2 and 3) to solid geometry (4)
(point cloud courtesy of Faro)
27. 27 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
3D Analyses Using 3D City Models
? Flood analysis
? Line of sight analysis
? Solar/shadow analysis
? Traffic simulation
? Noise simulation
34. 34 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Crossrail - Statistics
90km of existing surface network
28 existing surface station upgrades
(11 major reconstructions)
21 km of new sub-surface twin-bore railway
9 new sub-surface stations
200 million passengers per year
Maximum depth of tunnels 30m
16 Major new bridges
1 Major new depot
1 Hi tech control centre
14,000 Construction jobs
?15Bn over 10 years
35. 35 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
? Protect public money
? Improve cost and time certainty
? Improve understanding of risks
? Maintain quality and environmental standards
? Increase efficiency within the delivery supply chain
? Transparent and controlled change management
? Minimise impact on members of the public
Crossrail ¨C Business Challenges
38. 38 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
¡°A digital resource of reliable information for
decisions from initial conception to final
disposal of a facility or asset, founded on
open standards for interoperability and
integration.¡±
Crossrail ¨C BIM Definition
39. 39 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Crossrail ¨C Information Strategy
Deliver Best Practice in Lifecycle Information Management
?Provide effective management of all information assets
throughout the lifecycle
?Create an integrated 3D information model, facilitating
multidisciplinary collaboration through design, construction
and on to operations and maintenance
?Enable effective handover of ¡®valuable information¡¯ to form
the base of the operational asset management system
40. 40 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
What is AIMS?
?Crossrail¡¯s Asset Information Management System
?Records details of ~2 million assets to be constructed
?Essential for the operation and maintenance of Crossrail
?Managed by Crossrail¡¯s Asset Information Team
Requirements
Commissioning
Handover
Design Construction Operate / Maintain
Traditional
Crossrail
Start
Start Finish
Finish???
? 2012 Crossrail, Ltd.
41. 41 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
CRL Core Business Systems
H&S
Finance Cost
Management
Contract
Management
Schedule
Management
Risk
Management
Document
Control
Requirements
Asset
Information Mgt.
Land &
Property
Design
Control
Stakeholder
Management
Construction
Applications
Integration
Feeder Systems
Reporting
MS Excel
Analysis
Area Directors
Report
Programme
Directors
Report
Sponsors
Dashboard
Management
Reporting
Presentation
Integrated
Business
Intelligence
Bentley Maps Crossrail
Connect
Industry
Partner Data
Crossrail ¨C Integrated IT Systems
? 2012 Crossrail, Ltd.
42. 42 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
Crossrail ¨C Benefits
? Provides improved cost and time certainty
? Reduces risk
? Ensures compliance to standards
? Increases productivity
? Improves supply chain delivery
? Provides greater control
? Ability to leverage all project information
? 2012 Crossrail, Ltd.
43. 43 | WWW.BENTLEY.COM | ? 2014 Bentley Systems, Incorporated
For More Information¡
www.bentley.com/3DCity
Visit the Bentley booth in the
exhibition area.
jeanbaptiste.monnier@bentley.com
Thank You!