2. Meeting Agenda [May 21th, 2014]
• Project Modification
• Work progress [Electrical and control]
• Work progress [Mechanical and Manufacturing]
• Project Final Discussion date?
• Conclusion
3. Project Modification
• The project was initially making a robot do inspection and cleaning tasks in
water, Sewage & petrochemical pipelines.. and already we've set design and
made studies and calculations for this.
• But in the manufacturing phase we have decided to make the robot do the
inspection task only because the cleaning materials (nozzle and the brush) Will
delivered late because of the shipping process.
• So our project renamed to be [Pipeline Inspection Snake Robot]