High Pressure Process
Critical Instrument
Autorodder installation
CLEARGUARD
Page 1
Before
50 Bar (725 PSI) Process Pressure
Manual rod-out frequency = once per 6 weeks (Preventative maintenance schedule)
CLEARGUARD
Page 2
Before
CLEARGUARD
Page 3
Associated costs = Temporary access platform, staff (x2), Production loss
Risks = Working at height, in the line of fire
1st Installation
CLEARGUARD
Page 4
2 ANSI 300# Autorodder
80mm (3 1/4) dia. Cylinder, 500mm (19 2/3) Stroke
3rd Installation
CLEARGUARD
Page 5
2 ANSI 300# Double Block & Bleed Plug Valve
Autorodder
80mm (3 1/4) dia. Cylinder, 640mm (25 1/5) Stroke
4th Installation
CLEARGUARD
Page 6
2 ANSI 300# Autorodder
80mm (3 1/4) dia. Cylinder, 500mm (19 2/3) Stroke
Result
Happy Customer
CLEARGUARD
Page 7
Benefits
No more manual rod outs
Increased safety
Consistent, reliable, accurate Pv measurement
Cost effective
CLEARGUARD
Page 8