際際滷

際際滷Share a Scribd company logo
HIMANSU SEKHAR PATI
                                                                                         B-511
                                                                       Knightsbridge Apartment
                                                                              Kundanahalli Gate
                                                                       Bangalore - 560037, India
                                                                    himansu.pati@hotmail.com
                                                                    Mobile  0091 9008 306 255

                                     WORK EXPERIENCE
Reservoir engineer with 7 years oil and gas production and exploration experience with a major
oil company. As a reservoir engineer I have studied reservoir behavior and characteristics to
determine future development plans and production profiles feeding economic evaluations,
employed data from various sources to produce development scenarios using computer models to
simulate production and to quantify the impact of uncertainty and risk. I have determined well
numbers and sites for incremental development activities, such as commissioning additional
wells or recommending the employment of enhanced recovery technologies, as well as
monitoring and updating models as necessary during the reservoir life cycle. Currently working
with Shell Technology India as a Reservoir Engineer from January 2007. Also I am pursuing my
Masters degree from Heriot Watt University through distance learning. Total experience is
briefed here:
Shell International Exploration and Production
EPT-S, India (January, 2009  till date)
      Working as a team member in Zerogen Carbon Capture and Storage project.
      DST interpretation of Appraisal wells.
      Integrated Production system modeling using GAP and MoReS for Zerogen CCS project.
      Responsible and accountable for reservoir engineering input for VAR 3 decision making.
      QA/QC of Reservoir and field data, to be used in analogue study.
      Working as member of Proved reserves addition team  DCA, MBAL., PVTsim,
       Analogue study etc.
EPT-S, Aberdeen (December, 2007  December, 2008)
      Working as a team member in Dubai CO2 project
      Responsible and accountable for reservoir engineering input for VAR 3 decision making.
      QA/QC of Simulation outputs.
      Effect of injection gas composition on MMP and Recovery factor.
      Analyzing and reporting of Further field development plan.
      Optimizing well location, length and spacing and well throughput rates.
      Gas-lift optimization study.



                                                                                              1
   Implementing Pressure maintenance option during CO2 WAG.
      Effect of Pressure on Recovery of a WAG project.
      QA/QC of history matched sector model.
      Predicting WAG performance on History matched model.
      Field Development concept selection based on Sector model profiles.
      Impact of Injection gas composition on WAG Recovery  pure CO2 vs recycled.
      Impact of trapped oil saturation, Hysteresis effect and Residual oil saturation to
       waterflood on Economics of the project.
EPT-S, India (January 2007-November, 2007)
      Field Development Plan of a Crux Gas condensate Field, Australia.
      Reservoir Simulation of Crux field using MoReS.
      Well test interpretation-using Ecrin.
      Integrated Production modeling of Crux field Using GAP, PROPSER, MBAL.
      EOR/ IOR feasibility study of Sabah Field using MAESTRO.
      PVT error checks of the fluid samples using PVTsim.
      MBAL history matched model of Kinabalu sands (both Major and Minor).
      Sensitivity analysis on water injection rate on recovery of major sands of Kinabalu.

British Gas Exploration & Production India Limited
Tapti Gas Field  India (July 2006 - November 2006)
      Reservoir Monitoring, Production performance analysis of Tapti Gas field.
      Team member of Tapti Gas field developement.
      Carried out Production optimization study of Tapti Gas wells using MBAL, PROSPER &
       GAP.
      Responsible for planning, execution & interpretation of Production logging in wells
       having multilayer reservoirs.
      Coordinating with production department for slick line jobs and well selection for the
       same.




                                                                                                2
Oil India Limited
Naharkatiya Block  India (June 2003 - July 2006)
      Responsible for selection, implementation and surveillance of water flooding in depleted
       reservoirs of OILs Fields.
      Reservoir Monitoring, Production performance analysis of major reservoirs of Oil India
       Limited.
      Classical Reservoir Engineering studies, Reserve Estimation using Material Balance.
      Responsible for preparing technical publication based on various in-house reservoir-
       engineering studies.
      Decline curve analysis, Gas availability studies.
      Development Location release based on Simulation studies.
      Data collection, compilation and assistance for various international consultancies.


                            TRAINING AND KEY AREAS OF WORK

   Technical: Well testing & Completion (design, interpretation and operations, Onshore
   Drilling and workover operations (Planning and Execution), Waterflooding, Reserves
   Estimation, Field Development Plan, Integrated Production Modeling, IOR/EOR screening
   Techno-commercial: Development Planning, Project Scheduling and Analysis.
   Trainings:
      Fundamentals of Reservoir Simulation by Mustafa B. Biterge (Schlumberger).
      MBAL user end training by Petroleum Experts.
      Reservoir Appraisal & Development by Nautilus.
      Opportunity Realization Process (Project Framing & Execution process).
      PVTsim end user Training by CALSEP.
      OFM end user Training by Schlumberger.
      EP00 course (Familiarization to sub-surface disciplines, Shell International E & P)
      Reservoir Simulation training by Mike German (Shell International E & P).
      EOR screening and working knowledge of MAESTRO software.
      SCAL course (Shell International E & P).
      Back to Basics Reservoir Engineering (Shell International E & P).


                                                                                                3
   Reserves awareness Training (Shell International E & P).
       Reserves ELT & SM training (Shell International E & P).
       Smart Field for Reservoir Engineers training (Shell International E & P).
       Design of Experiments (Shell International E & P)
       EOR gas injection Course (Petroskills)
       PVT course



                                       ACADEMIC RECORD

MSc (Petroleum Engineering) Heriot-Watt University, Edinburgh
Currently pursuing my Masters in Petroleum Engineering from Heriot-watt University,
Edinburgh, through Distance Learning module.

B. Tech. (Petroleum Engineering) Indian School of Mines, Dhanbad                    May 2003

Project: 3-D, 3-Phase Simulation of a waterflooding Reservoir for 5-spot pattern using
BOAST successfully completed under Late Prof. S.N. Pandey, Deptt. of Petroleum Engg.,
Indian School of Mines.

Orissa Board of higher Secondary Education (10+2),                                  May 1998
Overall Percentage: 82%

Orissa Board of Secondary Education (10),                                           May 1996
Overall Percentage: 80 %

ACADEMIC ACHIEVEMENTS:
 Selected as the meritorious student in the 1st year of B. Tech.
 Selected in college by the Indian Institute of Technology-JEE (All India rank-2412).
 43rd rank in Orissa Sate Engineering Admission Test-1999.



                              EXTRA-CURRICULAR ACTIVITIES
   General Secretary of Indian School of Mines Student Society for the session 2001-2002.
   Treasurer, SPE ISM Chapter
   Successfully organized East Zone Inter University Youth Festival-2001 under my leadership.
   Successfully organized ISM annual college Cultural festival-2002 under my leadership.




                                       SOFTWARE SKILLS


                                                                                               4
Languages: Visual Basic 6.0
   Proficient in using OFM, GAP, MBAL, PROSPER, PVTP (Petroleum Experts), PVTsim,
    MoReS (Reservoir simulator), Ecrin, SPIDER, CMG (IMEX, GEM)



                                  GENERAL INFORMATION
   Date of Birth:                            21st June 1981
   Passport No.:                             F0837037
   Nationality:                              Indian
   Marital Status:                           Single




                                                                                     5

More Related Content

Himansu Pati

  • 1. HIMANSU SEKHAR PATI B-511 Knightsbridge Apartment Kundanahalli Gate Bangalore - 560037, India himansu.pati@hotmail.com Mobile 0091 9008 306 255 WORK EXPERIENCE Reservoir engineer with 7 years oil and gas production and exploration experience with a major oil company. As a reservoir engineer I have studied reservoir behavior and characteristics to determine future development plans and production profiles feeding economic evaluations, employed data from various sources to produce development scenarios using computer models to simulate production and to quantify the impact of uncertainty and risk. I have determined well numbers and sites for incremental development activities, such as commissioning additional wells or recommending the employment of enhanced recovery technologies, as well as monitoring and updating models as necessary during the reservoir life cycle. Currently working with Shell Technology India as a Reservoir Engineer from January 2007. Also I am pursuing my Masters degree from Heriot Watt University through distance learning. Total experience is briefed here: Shell International Exploration and Production EPT-S, India (January, 2009 till date) Working as a team member in Zerogen Carbon Capture and Storage project. DST interpretation of Appraisal wells. Integrated Production system modeling using GAP and MoReS for Zerogen CCS project. Responsible and accountable for reservoir engineering input for VAR 3 decision making. QA/QC of Reservoir and field data, to be used in analogue study. Working as member of Proved reserves addition team DCA, MBAL., PVTsim, Analogue study etc. EPT-S, Aberdeen (December, 2007 December, 2008) Working as a team member in Dubai CO2 project Responsible and accountable for reservoir engineering input for VAR 3 decision making. QA/QC of Simulation outputs. Effect of injection gas composition on MMP and Recovery factor. Analyzing and reporting of Further field development plan. Optimizing well location, length and spacing and well throughput rates. Gas-lift optimization study. 1
  • 2. Implementing Pressure maintenance option during CO2 WAG. Effect of Pressure on Recovery of a WAG project. QA/QC of history matched sector model. Predicting WAG performance on History matched model. Field Development concept selection based on Sector model profiles. Impact of Injection gas composition on WAG Recovery pure CO2 vs recycled. Impact of trapped oil saturation, Hysteresis effect and Residual oil saturation to waterflood on Economics of the project. EPT-S, India (January 2007-November, 2007) Field Development Plan of a Crux Gas condensate Field, Australia. Reservoir Simulation of Crux field using MoReS. Well test interpretation-using Ecrin. Integrated Production modeling of Crux field Using GAP, PROPSER, MBAL. EOR/ IOR feasibility study of Sabah Field using MAESTRO. PVT error checks of the fluid samples using PVTsim. MBAL history matched model of Kinabalu sands (both Major and Minor). Sensitivity analysis on water injection rate on recovery of major sands of Kinabalu. British Gas Exploration & Production India Limited Tapti Gas Field India (July 2006 - November 2006) Reservoir Monitoring, Production performance analysis of Tapti Gas field. Team member of Tapti Gas field developement. Carried out Production optimization study of Tapti Gas wells using MBAL, PROSPER & GAP. Responsible for planning, execution & interpretation of Production logging in wells having multilayer reservoirs. Coordinating with production department for slick line jobs and well selection for the same. 2
  • 3. Oil India Limited Naharkatiya Block India (June 2003 - July 2006) Responsible for selection, implementation and surveillance of water flooding in depleted reservoirs of OILs Fields. Reservoir Monitoring, Production performance analysis of major reservoirs of Oil India Limited. Classical Reservoir Engineering studies, Reserve Estimation using Material Balance. Responsible for preparing technical publication based on various in-house reservoir- engineering studies. Decline curve analysis, Gas availability studies. Development Location release based on Simulation studies. Data collection, compilation and assistance for various international consultancies. TRAINING AND KEY AREAS OF WORK Technical: Well testing & Completion (design, interpretation and operations, Onshore Drilling and workover operations (Planning and Execution), Waterflooding, Reserves Estimation, Field Development Plan, Integrated Production Modeling, IOR/EOR screening Techno-commercial: Development Planning, Project Scheduling and Analysis. Trainings: Fundamentals of Reservoir Simulation by Mustafa B. Biterge (Schlumberger). MBAL user end training by Petroleum Experts. Reservoir Appraisal & Development by Nautilus. Opportunity Realization Process (Project Framing & Execution process). PVTsim end user Training by CALSEP. OFM end user Training by Schlumberger. EP00 course (Familiarization to sub-surface disciplines, Shell International E & P) Reservoir Simulation training by Mike German (Shell International E & P). EOR screening and working knowledge of MAESTRO software. SCAL course (Shell International E & P). Back to Basics Reservoir Engineering (Shell International E & P). 3
  • 4. Reserves awareness Training (Shell International E & P). Reserves ELT & SM training (Shell International E & P). Smart Field for Reservoir Engineers training (Shell International E & P). Design of Experiments (Shell International E & P) EOR gas injection Course (Petroskills) PVT course ACADEMIC RECORD MSc (Petroleum Engineering) Heriot-Watt University, Edinburgh Currently pursuing my Masters in Petroleum Engineering from Heriot-watt University, Edinburgh, through Distance Learning module. B. Tech. (Petroleum Engineering) Indian School of Mines, Dhanbad May 2003 Project: 3-D, 3-Phase Simulation of a waterflooding Reservoir for 5-spot pattern using BOAST successfully completed under Late Prof. S.N. Pandey, Deptt. of Petroleum Engg., Indian School of Mines. Orissa Board of higher Secondary Education (10+2), May 1998 Overall Percentage: 82% Orissa Board of Secondary Education (10), May 1996 Overall Percentage: 80 % ACADEMIC ACHIEVEMENTS: Selected as the meritorious student in the 1st year of B. Tech. Selected in college by the Indian Institute of Technology-JEE (All India rank-2412). 43rd rank in Orissa Sate Engineering Admission Test-1999. EXTRA-CURRICULAR ACTIVITIES General Secretary of Indian School of Mines Student Society for the session 2001-2002. Treasurer, SPE ISM Chapter Successfully organized East Zone Inter University Youth Festival-2001 under my leadership. Successfully organized ISM annual college Cultural festival-2002 under my leadership. SOFTWARE SKILLS 4
  • 5. Languages: Visual Basic 6.0 Proficient in using OFM, GAP, MBAL, PROSPER, PVTP (Petroleum Experts), PVTsim, MoReS (Reservoir simulator), Ecrin, SPIDER, CMG (IMEX, GEM) GENERAL INFORMATION Date of Birth: 21st June 1981 Passport No.: F0837037 Nationality: Indian Marital Status: Single 5