Historical Hydroelectric Generation
and Preliminary Potential Generation
Patillas Dam Spillway
Hydroelectric
System
Historical Energy
Production
Historical Energy
Production
Energy Production
Projections
(M kWh per year)10 YR Average
(M kWh per year)
FY 2011-2012
(M kWh per year)
Toro Negro 13.9 10.7 28
Garzas 9.7 8.7 16.6
Dos Bocas /
Caonillas
63.4 73 75
Río Blanco 2.1 0 29.2
Yauco 42.1 32.5 76
Patillas 0 0 1.6
Carite 0 0 9.7
Comerío 0 0 22.6
Isabela 0 0 5.5
Total 131.2 124.9 264.2

More Related Content

Historical hydroelectric generation_and_preliminary_potential_generation_csa_may-23-2013

  • 1. Historical Hydroelectric Generation and Preliminary Potential Generation Patillas Dam Spillway Hydroelectric System Historical Energy Production Historical Energy Production Energy Production Projections (M kWh per year)10 YR Average (M kWh per year) FY 2011-2012 (M kWh per year) Toro Negro 13.9 10.7 28 Garzas 9.7 8.7 16.6 Dos Bocas / Caonillas 63.4 73 75 Río Blanco 2.1 0 29.2 Yauco 42.1 32.5 76 Patillas 0 0 1.6 Carite 0 0 9.7 Comerío 0 0 22.6 Isabela 0 0 5.5 Total 131.2 124.9 264.2