3. Input: Requests for coordination
Appendix 4 Info (No. 9.30)
BR: Validate/Check/Process
Output: CR/C Publication in
BR IFIC DVD
Conformity
with Radio
Regulations
(No. 9.35)
Coordination
Requirements
(No. 9.36)
C
Coordination
8. Unfavourable
Finding
One in three CR/Cs (No. 11.31)
No status, priority lost, cost
recovery incurred
Source: Coordination Requests received in between 2008 and 2013
10. Fee remains unchanged after 100
units, no incentive to keep filings
small
Cost
recovery
fee
Units100 units
Source: Decision 482 (modified 2012) Doc C12/95(Rev.2)
2 beams
10 frequencies
5 emissions
1 class of station
Example:
11. HOW TO
Avoid unfavourable findings
Manage coordination requirements
14. Conformity with Table of
Frequency Allocation & other
provisions (PFD/EIRP Limits
etc.)
Nos. 9.35, 11.31 of RR, RoP11.31
15. Conformity with RR
(No. 9.35 of RR)
Network summary
Frequency bands
Direction of transmission
Class of station/Services
Beams/Service area
Table of Frequency
Allocation
(Article 5 of Radio Regulations)
Relevant footnotes
17. Conformity with RR
(No. 9.35 of RR)
Frequency bands of network
Frequency allocation
N- A- A- A- A-
N- A- N-
N-
N-
Unfavourable (N-)
if not within allocation
18. Conformity with RR
(No. 9.35 of RR)
Frequency bands of network
N- N- N- N- N-
N- N- N-
N-
N-
Unfavourable (N-)
if wrong Service or Direction of Transmission
21. Conformity with RR
(No. 9.35 of RR)
Unfavourable
(N-)
Favourable
(A-)
R1 R2 R3
Service area is split
22. Conformity with RR
(No. 9.35 of RR)
Power-flux density
limits (PFD)
Articles 21, 22, footnotes, etc.
EIRP limits
Articles 21, footnotes, etc.
PFD = Power Density + 10log(Ref. Bandwidth) +
G(theta) 10log(4piR^2) dB(W/m2)
Where G = Gain of transmitting space station
R = Distance from satellite to point on Earths surface
23. Conformity with RR
(No. 9.35 of RR)
Power-flux density
limits (PFD)
EIRP limits GIBC Program v7
(Graphical Interface for Batch Calculations)
24. Enter Network ID
Select Hard Limits
Click Start
Conformity with RR
(No. 9.35 of RR)
PFD (Terrestrial Services)
26. Conformity with RR
(No. 9.35 of RR)
GIBC Output Level 2 All locations with excess:
Beam name Maximum Gain
Frequency assignment with excess
(Frequency | Bandwidth | Emission | Peak Power | Maximum
Power Density)
Group ID
Worst case coordinate & location
Gain | PFD | Max Excess | PFD Limit
PFD.LST
Reference to PFD limit
27. Conformity with RR
(No. 9.35 of RR)
PFD.LST
Unfavourable (N-)
Split from groups with Favourable assignments
Fixed beams
Steerable beams
Gain | PFD | Max Excess | PFD Limit
28. Conformity with RR
(No. 9.35 of RR)
PFD.LST
Favourable (A-)*
Fixed beams
Steerable beams
Gain | PFD | Max Excess | PFD Limit
Unfavourable (N-)
Split from groups with Favourable assignments
29. Conformity with RR
(No. 9.35 of RR)
*2 Conditions
Provide method to meet PFD limit
&
One location PFD limit is met
(Annex 1 of RoP No. 21.16)
Favourable (A-)*Steerable beams
30. Conformity with RR
(No. 9.35 of RR)
*2 Conditions
Provide method to meet PFD limit
&
One location PFD limit is met
(Annex 1 of RoP No. 21.16)
Max Excess 9.5 dB
(C, Ku, Ka-bands FSS GSO)
(Globally steerable but actual value depends on PFD limits)
Source: Rules of Procedure on No. 21.16
31. Conformity with RR
(No. 9.35 of RR)
Common
Unfavourable Findings
1. EIRP/PFD hard limits exceeded
Check GIBC/PFD results
2. Not in accordance with ToFA
Check frequency bands, direction of
transmission, class of station, service area
3. PFD limits exceeded for steerable
beams and no method provided
Refer to Annex 1 of RoP on No. 21.16
39. Coordination requirements
(No. 9.36 of RR)
Network Summary
Identify forms of coordination
Article 9 & Appendix 5 for criteria
Article 5 footnotes (9.21, 9.11A)
Rules of Procedure (9.11A)
Articles 7 of Appendices 30, 30A
Resolutions 33, 539
Forms of
coordination
40. Coordination requirements
(No. 9.36 of RR)
GSO
9.7
9.21/A
RS33#3
9.11
9.14
9.21/C
RS33#2.1
GSO
A30#7.1A30A#7.1
GSO
9.13
9.21/B
9.12
9.12A
9.21/A
9.21/B
NGSO GSO
9.11
9.14
9.21/C
RS33#2.1
NGSO
Identify forms of coordination
Article 9 & Appendix 5 for criteria
Article 5 footnotes (9.21, 9.11A)
Rules of Procedure (9.11A)
Articles 7 of Appendices 30, 30A
Resolutions 33, 539
41. Coordination requirements
(No. 9.36 of RR)
Frequency Overlap
with Space Services
Frequency Overlap
with Terrestrial
Services
PFD (Trigger) AP8 PFD (Space)
GIBC
GSO
9.7
9.21/A
RS33#3
9.11
9.14
9.21/C
RS33#2.1
GSO
A30#7.1A30A#7.1
GSO
9.13
9.21/B
9.12
9.12A
9.21/A
9.21/B
NGSO GSO
9.11
9.14
9.21/C
RS33#2.1
NGSO
42. Coordination requirements
(No. 9.36 of RR)
Frequency Overlap
with Space Services
Frequency Overlap
with Terrestrial
Services
GSO
9.13
9.21/B
9.12
9.12A
9.21/A
9.21/B
NGSO GSO
9.11
9.14
9.21/C
RS33#2.1
NGSO
PFD (Trigger) AP8 PFD (Space)
GIBC
GSO
9.7
9.21/A
RS33#3
9.11
9.14
9.21/C
RS33#2.1
GSO
A30#7.1A30A#7.1
43. Coordination requirements
(No. 9.36 of RR)
(WRC-03)
Enter Network ID
Controls display of
sample DT/T cases
1 - Per administration
2 - Per group
3 - Per assignment
Click Start
Appendix 8
44. Coordination requirements
(No. 9.36 of RR)
DT/T > 6%
APP8.LST
Network under examination
Satellite name | Longitude | Frequency
Beam | Maximum Gain
Frequency Assignment | Power characteristics | Date of protection
Existing network
Associated ES
45. Coordination requirements
(No. 9.36 of RR)
9.7 Coordination Arc
WRC-12 reduced CA for C & Ku-bands to 8 & 7 degs
9.7 DT/T
9.21/A
RS33 (9.7 for API from 01.01.1999)
A30A#7.1
APP8.LST (cont.)
46. Coordination requirements
(No. 9.36 of RR)
A = Recorded in MIFR / Already published
T = Under examination
N = Notification / C = Coordination
C = Network causing interference
R = Network receiving interference
A = Coordination Arc
NTW.LST
56. Coordination requirements
(No. 9.36 of RR)
SpaceCap
Set Target Db
Create a new database
Eg. Satellite Name
Set Options
Keep Group Ids of the Source
Replace Notice in Target
76. Gain contour & service
area diagrams Align steerable beams
with service area
(provide effective gain
contours 0, -2, -4, -6, -
10, -20 dB)
B.3.b1 of Appendix 4 (WRC-12)
77. Gain contour & service
area diagrams Align steerable beams
with service area
(provide effective gain
contours 0, -2, -4, -6, -
10, -20 dB)
B.3.b1 of Appendix 4 (WRC-12)