This document discusses reducing costs for CCTV wiring by using video balloons instead of standard cable. The goals are to reduce wiring costs by 70% and installation time. Standard wiring uses over 2000 meters of cable compared to only 586 meters for a video balloon solution. This can cut total project costs and downtime by reducing wiring by 72%. Video balloons strategically place receivers to keep average wiring to 35 meters per floor instead of 60 meters.
2. Vision Statement
To reduce cost of wiring in Analog based CCTV by
Using Video Ballon Instead of Standard Cable
thereby reducing total project cost
3. Goal and Objective
It has been seen Wiring cost is approximately 30-35% of the total
project
We plan to reduce the wiring cost by 70% by using this technology
Less Wiring Means Less Installation Time
Less Wiring Means Less Maintenance Issue
Less Wiring means Less utilization of Power
Replacement of BNC Connector by RJ 45 Crimps
Elimination of BNC Connector means less service issue.
6. Video Ballon Wiring Solution
Given Below is the diagram for Video Ballon CCTV wiring solution
8. CASE STUDIES
Let us consider a building with 4 floor of 50 x 50
meter and a height of 3 meter for each floor
Each floor has an average of 4 camera with
monitoring in ground floor.
Average wiring inside each floor for each camera
is consider 60 meter
9. CALCULATION FOR STANDARD CONNECTION
Ground Floor 60 x 4 = 240 meter
First Floor 60 x 4 + 4 x 3 = 252 meter
Second Floor 60 x 4 + 4 x 6 = 264 meter
Third floor 60 x 4 + 4 x 9 = 276 meter
Total wiring = 960 x 2 + 72 x 2 = 2064 meter
Plus PVC conduit of 2064 meter
10. CALCULATION FOR UTP BALLON CONNECTION
In this case we strategically place the passive receiver in such a way that
Our average wiring comes to 35 meter per floor
Ground Floor 35 x 4 = 140 meter
First Floor 35 x 4 + 1 x 4 = 144 meter
Second Floor 35 x 4 + 1 x 8 = 148 meter
Third floor 35 x 4 + 1 x 14 = 154 meter
Total wiring = 960 x 2 + 72 x 2 = 586 meter
Plus PVC conduit of 586 meter
11. Conclusion
From previous illustration its clear that wiring was
reduced by 72%. This effects the following:
a) Total Project Costing
b) Installation Time
c) System Down Time
12. Thank You
For any further details, you can contact: