AlMashariq Trading and Contracting Company 1
Remote MicroGrid Control
Center Case Study: Large-Scale
Integration Challenges
December 05, 2018
By: Mohamed A. Al-Emam, PMP, CAP
IEEE Technical Seminar
AlMashariq Trading and Contracting Company 2
AGENDA
Systems
IntegrationErgonomics
Intro
Cyber Security24/7 Operation
Optimization
Take Away
AlMashariq Trading and Contracting Company 3
Introduction
AlMashariq Trading and Contracting Company 4
PROBLEM STATEMENT
To monitor and control entire electrical system of oil and gas
micro grid installation of 1.2 GWpermanent island
operation including generation, transmission and distribution
systems.
Data gathering and analysis were performed separately/
partially and differently between subsystems within the same
network.
AlMashariq Trading and Contracting Company 5
SYSTEM OVERVIEW
6 25 100+ 48 11 1000+ 1000+ 18+
1.2 GW
AlMashariq Trading and Contracting Company 6
BIRD EYE VIEW
AlMashariq Trading and Contracting Company 7
ARCHITECTURE
AlMashariq Trading and Contracting Company 8
24/7 Operation Optimization
AlMashariq Trading and Contracting Company 9
ANALYSIS
AlMashariq Trading and Contracting Company 10
MODELING, SIMULATION PROVESION
AlMashariq Trading and Contracting Company 11
TIME TRAVEL, FORENSIC AND POST MORTEM
AlMashariq Trading and Contracting Company 12
VISUALIZATIONS
AlMashariq Trading and Contracting Company 13
VISUALIZATIONS
AlMashariq Trading and Contracting Company 14
TOPOLOGY ALC (AUTOMATIC LINE COLORING)
AlMashariq Trading and Contracting Company 15
TWO HANDED OPERATION
AlMashariq Trading and Contracting Company 16
ABSTRACTION/ DATA FUSION
AlMashariq Trading and Contracting Company 17
ALARM MANAGEMENT
PERCENTAGE OF 10-MINUTE PERIODS
CONTAINING MORE THAN 10 ALARMS
<1%
MAXIMUM NUMBER OF ALARMS IN A 10-
MINUTE PERIOD
+10
PERCENTAGE OF TIME THE ALARM
SYSTEM IS IN A FLOOD CONDITION
<1%
PERCENTAGE CONTRIBUTION OF THE TOP
10 MOST FREQUENT ALARMS TO THE
OVERALL ALARM LOAD
<1% TO 5% MAXIMUM, WITH ACTION PLANS
TO ADDRESS DEFICIENCIES
QUANTITY OF CHATTERING AND FLEETING
ALARMS
ZERO, DEVELOP ACTION PLANS TO
CORRECT ANY THAT OCCUR
STALE ALARMS <5/DAY, WITH ACTION PLANS TO ADDRESS
ANNUNCIATED PRIORITY DISTRIBUTION IF USING THREE PRIORITIES: 80% LOW,
15% MEDIUM, 5% HIGH
IF USING FOUR PRIORITIES: 80% LOW, 15%
MEDIUM, 5% HIGH, <1%"HIGHEST"
OTHER SPECIAL-PURPOSE PRIORITIES ARE
EXCLUDED FROM THE CALCULATION
UNAUTHORIZED ALARM SUPPRESSION ZERO ALARMS SUPPRESSED OUTSIDE OF
CONTROLLED OR APPROVED
METHODOLOGIES
UNAUTHORIZED ALARM ATTRIBUTE
CHANGES
ZERO ALARM ATTRIBUTE CHANGES OUTSIDE
OF APPROVED METHODOLOGIES OR
MANAGEMENT OF CHANGE (MOC)
SOURCE: ISA 18.2 ALARM PERFORMANCE METRICS
AlMashariq Trading and Contracting Company 18
Ergonomics
AlMashariq Trading and Contracting Company 19
AlMashariq Trading and Contracting Company 20
ISO 11064 ERGONOMIC DESIGN OF CONTROL
CENTRES
Part 1: Principles for the design of control centres
Part 2: Principles for the arrangement of control suites
Part 3: Control room layout
Part 4: Layout and dimensions of workstations
Part 5: Displays and controls
Part 6: Environmental requirements for control centres
Part 7: Principles for the evaluation of control centres
AlMashariq Trading and Contracting Company 21
CONCEPTUAL MODEL
AlMashariq Trading and Contracting Company 22
CONCEPTUAL MODEL
AlMashariq Trading and Contracting Company 23
CONCEPTUAL MODEL
AlMashariq Trading and Contracting Company 24
PHOTONS MATTERS!
AlMashariq Trading and Contracting Company 25
F.LUX
AlMashariq Trading and Contracting Company 26
DISCOMFORT..
AlMashariq Trading and Contracting Company 27
AlMashariq Trading and Contracting Company 28
8% COLOR BLINDNESS (M) AND .5% (F)
AlMashariq Trading and Contracting Company 29
Cyber security
AlMashariq Trading and Contracting Company 30
MAJOR VULNERABILITIES
SCADA
Power plant DCS
Smart grid technologies, including software-based components with communication capabilities, used to
increase the reliability, security
Connected DERs¨
Supply chain like legacy software systems from commercial vendors
IT/OT integrations ( corporate netwrok)
GPS
AlMashariq Trading and Contracting Company 31
RESILIENCE AND RELIABILITY VIEW
Mapping of events that can cause disruption of power systems SOURCE:
AlMashariq Trading and Contracting Company 32
COUNTRY WIDE ATTACK
AlMashariq Trading and Contracting Company 33
USER ADMINISTRATION
AlMashariq Trading and Contracting Company 34
IT/OT INTEGRATION
AlMashariq Trading and Contracting Company 35
DEFENSE IN DEPTH
AlMashariq Trading and Contracting Company 36
Systems integration
AlMashariq Trading and Contracting Company 37
AlMashariq Trading and Contracting Company 38
MULTI VENDORS¨ INTEROPERABILITY
AlMashariq Trading and Contracting Company 39
DATA TRAFFIC AND NETWORK OPTIMIZATION
AlMashariq Trading and Contracting Company 40
MULTI- MASTER COMMAND
AlMashariq Trading and Contracting Company 41
TIME STAMP
AlMashariq Trading and Contracting Company 42
SPONTANEOUS REPORTING
AlMashariq Trading and Contracting Company 43
MULTI HIERARCHY PROJECT INTEGRATION (
INHERITANCE AND OOP)
AlMashariq Trading and Contracting Company 44
IEC 61850 SSD? SLD SCREENS!
AlMashariq Trading and Contracting Company 45
Takeaway
AlMashariq Trading and Contracting Company 46
Mohamed AlEmam
+966 50 466 9947
www.AlMashariq.com
Mohd.alemam@AlMashariq.com
Thank You

More Related Content

Similar to IEEE Technical Seminar (20)

PDF
ARC's Larry O'Brien Integrated Power and Automation Presentation @ ARC Indust...
ARC Advisory Group
?
PDF
Industry Insights & Cloud Skeptics - How Enterprises Use The Cloud And What S...
Alexander Miller
?
PDF
Industrial Automation Press Conference Hannover Messe
Schneider Electric
?
PPTX
10 Tips to Optimize, Automate, and Govern your Hybrid IT Environment
Flexera
?
PPTX
M2M solutions for industrial companies
Rafael Cabrera Rodriguez
?
PDF
M3 Brochure
DAX_THINK
?
PPTX
OPTIMIZING PIPELINES WITH MACHINE LEARNING DECISION SUPPORT
wle-ss
?
PDF
Sgcp13halley
Justin Hayward
?
PPT
Advanced energy management tools
RCREEE
?
PDF
Enterprise SCADA Standardization - Nov 2010 - Digital Oilfield.PDF
smrobb
?
PDF
Application Delivery Infrastructure for Multi-Cloud Enterprises
Enterprise Management Associates
?
PDF
Corporate Brochure v0.2 lower res
Mark Boshoff
?
PDF
Sigma power tech @ sanlac
Abhijeet Kumar Singh
?
PPTX
Substation automation Market PPT 2021: Size, Growth, Demand and Forecast till...
IMARC Group
?
PPTX
Case study-dcim-implementation-telecom-operator
Swagata Mukherjee
?
PDF
Setpoint Process Automation Overview
Jonathan Hoy
?
PDF
2019 CIO Think Tank: Pathways to Multicloud Transformation
IBM
?
PDF
IoT Applications, IoT Products, IoT Solutions & Services from Green Ark Enersol
UppaluriRaghavendra
?
PDF
Industry-Reference-2023-Agriculture_001.pdf
Sunnymangat4
?
PDF
Midstream Automation, Instrumentation & Control Congress 2015
marketinglbcg
?
ARC's Larry O'Brien Integrated Power and Automation Presentation @ ARC Indust...
ARC Advisory Group
?
Industry Insights & Cloud Skeptics - How Enterprises Use The Cloud And What S...
Alexander Miller
?
Industrial Automation Press Conference Hannover Messe
Schneider Electric
?
10 Tips to Optimize, Automate, and Govern your Hybrid IT Environment
Flexera
?
M2M solutions for industrial companies
Rafael Cabrera Rodriguez
?
M3 Brochure
DAX_THINK
?
OPTIMIZING PIPELINES WITH MACHINE LEARNING DECISION SUPPORT
wle-ss
?
Sgcp13halley
Justin Hayward
?
Advanced energy management tools
RCREEE
?
Enterprise SCADA Standardization - Nov 2010 - Digital Oilfield.PDF
smrobb
?
Application Delivery Infrastructure for Multi-Cloud Enterprises
Enterprise Management Associates
?
Corporate Brochure v0.2 lower res
Mark Boshoff
?
Sigma power tech @ sanlac
Abhijeet Kumar Singh
?
Substation automation Market PPT 2021: Size, Growth, Demand and Forecast till...
IMARC Group
?
Case study-dcim-implementation-telecom-operator
Swagata Mukherjee
?
Setpoint Process Automation Overview
Jonathan Hoy
?
2019 CIO Think Tank: Pathways to Multicloud Transformation
IBM
?
IoT Applications, IoT Products, IoT Solutions & Services from Green Ark Enersol
UppaluriRaghavendra
?
Industry-Reference-2023-Agriculture_001.pdf
Sunnymangat4
?
Midstream Automation, Instrumentation & Control Congress 2015
marketinglbcg
?

More from Mohamed Al-Emam, PMP?, CAP? (6)

PDF
Final publishedEmbedded Systems & Innovation?
Mohamed Al-Emam, PMP?, CAP?
?
PPTX
Plc by Mohamed Al-Emam, Session4
Mohamed Al-Emam, PMP?, CAP?
?
PPTX
Plc by Mohamed Al-Emam, Session3
Mohamed Al-Emam, PMP?, CAP?
?
PPTX
Plc by Mohamed Al-Emam, Session2
Mohamed Al-Emam, PMP?, CAP?
?
PPTX
PLC, by Mohamed Al-Emam, Session 1
Mohamed Al-Emam, PMP?, CAP?
?
PDF
PILOT Session for Embedded Systems
Mohamed Al-Emam, PMP?, CAP?
?
Final publishedEmbedded Systems & Innovation?
Mohamed Al-Emam, PMP?, CAP?
?
Plc by Mohamed Al-Emam, Session4
Mohamed Al-Emam, PMP?, CAP?
?
Plc by Mohamed Al-Emam, Session3
Mohamed Al-Emam, PMP?, CAP?
?
Plc by Mohamed Al-Emam, Session2
Mohamed Al-Emam, PMP?, CAP?
?
PLC, by Mohamed Al-Emam, Session 1
Mohamed Al-Emam, PMP?, CAP?
?
PILOT Session for Embedded Systems
Mohamed Al-Emam, PMP?, CAP?
?
Ad

Recently uploaded (20)

PPTX
CST413 KTU S7 CSE Machine Learning Clustering K Means Hierarchical Agglomerat...
resming1
?
PPTX
Introduction to File Transfer Protocol with commands in FTP
BeulahS2
?
PPTX
Bharatiya Antariksh Hackathon 2025 Idea Submission PPT.pptx
AsadShad4
?
PDF
Rapid Prototyping for XR: Lecture 4 - High Level Prototyping.
Mark Billinghurst
?
PPTX
Kel.3_A_Review_on_Internet_of_Things_for_Defense_v3.pptx
Endang Saefullah
?
PPTX
Work at Height training for workers .pptx
cecos12
?
PPTX
Comparison of Flexible and Rigid Pavements in Bangladesh
Arifur Rahman
?
PDF
Rapid Prototyping for XR: Lecture 1 Introduction to Prototyping
Mark Billinghurst
?
PPTX
Mobile database systems 20254545645.pptx
herosh1968
?
PDF
13th International Conference of Security, Privacy and Trust Management (SPTM...
ijcisjournal
?
PDF
Rapid Prototyping for XR: Lecture 6 - AI for Prototyping and Research Directi...
Mark Billinghurst
?
PDF
June 2025 Top 10 Sites -Electrical and Electronics Engineering: An Internatio...
elelijjournal653
?
PDF
Python Mini Project: Command-Line Quiz Game for School/College Students
MPREETHI7
?
PPT
????? ???? ????? ??? ?? ???? ??? ???????
???? ??? ?????
?
PDF
Plant Control_EST_85520-01_en_AllChanges_20220127.pdf
DarshanaChathuranga4
?
PDF
Validating a Citizen Observatories enabling Platform by completing a Citizen ...
Diego L┏pez-de-Ipi?a Gonz│lez-de-Artaza
?
PPTX
FSE_LLM4SE1_A Tool for In-depth Analysis of Code Execution Reasoning of Large...
cl144
?
PPTX
LECTURE 7 COMPUTATIONS OF LEVELING DATA APRIL 2025.pptx
rr22001247
?
PDF
i氏Y創_Miipher and Miipher2 .
鰻粥京晦粥皆幄塀氏芙
?
PDF
CLIP_Internals_and_Architecture.pdf sdvsdv sdv
JoseLuisCahuanaRamos3
?
CST413 KTU S7 CSE Machine Learning Clustering K Means Hierarchical Agglomerat...
resming1
?
Introduction to File Transfer Protocol with commands in FTP
BeulahS2
?
Bharatiya Antariksh Hackathon 2025 Idea Submission PPT.pptx
AsadShad4
?
Rapid Prototyping for XR: Lecture 4 - High Level Prototyping.
Mark Billinghurst
?
Kel.3_A_Review_on_Internet_of_Things_for_Defense_v3.pptx
Endang Saefullah
?
Work at Height training for workers .pptx
cecos12
?
Comparison of Flexible and Rigid Pavements in Bangladesh
Arifur Rahman
?
Rapid Prototyping for XR: Lecture 1 Introduction to Prototyping
Mark Billinghurst
?
Mobile database systems 20254545645.pptx
herosh1968
?
13th International Conference of Security, Privacy and Trust Management (SPTM...
ijcisjournal
?
Rapid Prototyping for XR: Lecture 6 - AI for Prototyping and Research Directi...
Mark Billinghurst
?
June 2025 Top 10 Sites -Electrical and Electronics Engineering: An Internatio...
elelijjournal653
?
Python Mini Project: Command-Line Quiz Game for School/College Students
MPREETHI7
?
????? ???? ????? ??? ?? ???? ??? ???????
???? ??? ?????
?
Plant Control_EST_85520-01_en_AllChanges_20220127.pdf
DarshanaChathuranga4
?
Validating a Citizen Observatories enabling Platform by completing a Citizen ...
Diego L┏pez-de-Ipi?a Gonz│lez-de-Artaza
?
FSE_LLM4SE1_A Tool for In-depth Analysis of Code Execution Reasoning of Large...
cl144
?
LECTURE 7 COMPUTATIONS OF LEVELING DATA APRIL 2025.pptx
rr22001247
?
i氏Y創_Miipher and Miipher2 .
鰻粥京晦粥皆幄塀氏芙
?
CLIP_Internals_and_Architecture.pdf sdvsdv sdv
JoseLuisCahuanaRamos3
?
Ad

IEEE Technical Seminar

  • 1. AlMashariq Trading and Contracting Company 1 Remote MicroGrid Control Center Case Study: Large-Scale Integration Challenges December 05, 2018 By: Mohamed A. Al-Emam, PMP, CAP IEEE Technical Seminar
  • 2. AlMashariq Trading and Contracting Company 2 AGENDA Systems IntegrationErgonomics Intro Cyber Security24/7 Operation Optimization Take Away
  • 3. AlMashariq Trading and Contracting Company 3 Introduction
  • 4. AlMashariq Trading and Contracting Company 4 PROBLEM STATEMENT To monitor and control entire electrical system of oil and gas micro grid installation of 1.2 GWpermanent island operation including generation, transmission and distribution systems. Data gathering and analysis were performed separately/ partially and differently between subsystems within the same network.
  • 5. AlMashariq Trading and Contracting Company 5 SYSTEM OVERVIEW 6 25 100+ 48 11 1000+ 1000+ 18+ 1.2 GW
  • 6. AlMashariq Trading and Contracting Company 6 BIRD EYE VIEW
  • 7. AlMashariq Trading and Contracting Company 7 ARCHITECTURE
  • 8. AlMashariq Trading and Contracting Company 8 24/7 Operation Optimization
  • 9. AlMashariq Trading and Contracting Company 9 ANALYSIS
  • 10. AlMashariq Trading and Contracting Company 10 MODELING, SIMULATION PROVESION
  • 11. AlMashariq Trading and Contracting Company 11 TIME TRAVEL, FORENSIC AND POST MORTEM
  • 12. AlMashariq Trading and Contracting Company 12 VISUALIZATIONS
  • 13. AlMashariq Trading and Contracting Company 13 VISUALIZATIONS
  • 14. AlMashariq Trading and Contracting Company 14 TOPOLOGY ALC (AUTOMATIC LINE COLORING)
  • 15. AlMashariq Trading and Contracting Company 15 TWO HANDED OPERATION
  • 16. AlMashariq Trading and Contracting Company 16 ABSTRACTION/ DATA FUSION
  • 17. AlMashariq Trading and Contracting Company 17 ALARM MANAGEMENT PERCENTAGE OF 10-MINUTE PERIODS CONTAINING MORE THAN 10 ALARMS <1% MAXIMUM NUMBER OF ALARMS IN A 10- MINUTE PERIOD +10 PERCENTAGE OF TIME THE ALARM SYSTEM IS IN A FLOOD CONDITION <1% PERCENTAGE CONTRIBUTION OF THE TOP 10 MOST FREQUENT ALARMS TO THE OVERALL ALARM LOAD <1% TO 5% MAXIMUM, WITH ACTION PLANS TO ADDRESS DEFICIENCIES QUANTITY OF CHATTERING AND FLEETING ALARMS ZERO, DEVELOP ACTION PLANS TO CORRECT ANY THAT OCCUR STALE ALARMS <5/DAY, WITH ACTION PLANS TO ADDRESS ANNUNCIATED PRIORITY DISTRIBUTION IF USING THREE PRIORITIES: 80% LOW, 15% MEDIUM, 5% HIGH IF USING FOUR PRIORITIES: 80% LOW, 15% MEDIUM, 5% HIGH, <1%"HIGHEST" OTHER SPECIAL-PURPOSE PRIORITIES ARE EXCLUDED FROM THE CALCULATION UNAUTHORIZED ALARM SUPPRESSION ZERO ALARMS SUPPRESSED OUTSIDE OF CONTROLLED OR APPROVED METHODOLOGIES UNAUTHORIZED ALARM ATTRIBUTE CHANGES ZERO ALARM ATTRIBUTE CHANGES OUTSIDE OF APPROVED METHODOLOGIES OR MANAGEMENT OF CHANGE (MOC) SOURCE: ISA 18.2 ALARM PERFORMANCE METRICS
  • 18. AlMashariq Trading and Contracting Company 18 Ergonomics
  • 19. AlMashariq Trading and Contracting Company 19
  • 20. AlMashariq Trading and Contracting Company 20 ISO 11064 ERGONOMIC DESIGN OF CONTROL CENTRES Part 1: Principles for the design of control centres Part 2: Principles for the arrangement of control suites Part 3: Control room layout Part 4: Layout and dimensions of workstations Part 5: Displays and controls Part 6: Environmental requirements for control centres Part 7: Principles for the evaluation of control centres
  • 21. AlMashariq Trading and Contracting Company 21 CONCEPTUAL MODEL
  • 22. AlMashariq Trading and Contracting Company 22 CONCEPTUAL MODEL
  • 23. AlMashariq Trading and Contracting Company 23 CONCEPTUAL MODEL
  • 24. AlMashariq Trading and Contracting Company 24 PHOTONS MATTERS!
  • 25. AlMashariq Trading and Contracting Company 25 F.LUX
  • 26. AlMashariq Trading and Contracting Company 26 DISCOMFORT..
  • 27. AlMashariq Trading and Contracting Company 27
  • 28. AlMashariq Trading and Contracting Company 28 8% COLOR BLINDNESS (M) AND .5% (F)
  • 29. AlMashariq Trading and Contracting Company 29 Cyber security
  • 30. AlMashariq Trading and Contracting Company 30 MAJOR VULNERABILITIES SCADA Power plant DCS Smart grid technologies, including software-based components with communication capabilities, used to increase the reliability, security Connected DERs¨ Supply chain like legacy software systems from commercial vendors IT/OT integrations ( corporate netwrok) GPS
  • 31. AlMashariq Trading and Contracting Company 31 RESILIENCE AND RELIABILITY VIEW Mapping of events that can cause disruption of power systems SOURCE:
  • 32. AlMashariq Trading and Contracting Company 32 COUNTRY WIDE ATTACK
  • 33. AlMashariq Trading and Contracting Company 33 USER ADMINISTRATION
  • 34. AlMashariq Trading and Contracting Company 34 IT/OT INTEGRATION
  • 35. AlMashariq Trading and Contracting Company 35 DEFENSE IN DEPTH
  • 36. AlMashariq Trading and Contracting Company 36 Systems integration
  • 37. AlMashariq Trading and Contracting Company 37
  • 38. AlMashariq Trading and Contracting Company 38 MULTI VENDORS¨ INTEROPERABILITY
  • 39. AlMashariq Trading and Contracting Company 39 DATA TRAFFIC AND NETWORK OPTIMIZATION
  • 40. AlMashariq Trading and Contracting Company 40 MULTI- MASTER COMMAND
  • 41. AlMashariq Trading and Contracting Company 41 TIME STAMP
  • 42. AlMashariq Trading and Contracting Company 42 SPONTANEOUS REPORTING
  • 43. AlMashariq Trading and Contracting Company 43 MULTI HIERARCHY PROJECT INTEGRATION ( INHERITANCE AND OOP)
  • 44. AlMashariq Trading and Contracting Company 44 IEC 61850 SSD? SLD SCREENS!
  • 45. AlMashariq Trading and Contracting Company 45 Takeaway
  • 46. AlMashariq Trading and Contracting Company 46 Mohamed AlEmam +966 50 466 9947 www.AlMashariq.com Mohd.alemam@AlMashariq.com Thank You