Building Information Modeling (BIM) is an integrated software that simulates the entire construction design process, including materials, boundaries, and requirements. BIM manages graphical displays, construction details, and data, allowing architects and engineers to easily create drawings, reports, and analyze designs. It simulates infrastructure in a few clicks and empowers facilities management and material purchasing. BIM eliminates data redundancy, supports standards, and saves costs through interconnected digital design. It helps track asset management, construction sequencing, information sharing, and ensures all stakeholders have up-to-date information to implement BIM throughout the construction process.
1 of 15
Downloaded 60 times
More Related Content
Implementing Building Information Modelling in Construction
2. Building Information Modelling (BIM) has radically changed the way
architectural, engineering and constructional design and documentation is
implemented. The term BIM is now a common phrase, when it comes to building
construction life cycle. The BIM is an integrated software that helps simulate the
entire construction design, raw materials quantity, geographical boundaries, and
operational requirements for a particular construction project.
Much more than CAD software, BIM models manage graphical display,
construction details and data. This construction design software easily sets up
drawings and reports, statistics and analysis. BIM proficiently simulates the entire
infrastructure architecture on just few clicks and inputs. BIM software empowers
facilities management, optimized raw material purchases and circumstantial analysis.
BIM
4. This software helps the construction architects to make confident mission critical
decisions. BIM also eliminates data redundancy, supports building standards and
savings; due to the interconnected digital design of different elements in a simulated
environment.
The software helps keep a tab on asset management, accelerated construction
sequences, shared job allocation and grids. These parametric 3D design models
allow architects, builders, contractors, engineers, developers- to sync information and
test construction database changes. All stakeholders help with Building Information
Modelling (BIM) implementation, also retain and update information about site
engineering and construction. Building Information Modelling (BIM) provides
rationalized modelling & visualization techniques, data calculations and shared
set of activities for the entire team involved in construction.
6. Cost reduction, handling interoperability issues, design verification and evaluation
for all stages during the entire simulated project life-cycle is shouldered by BIM
designers.
These days construction design can even be outsourced to BIM specialists off
shore. This is usually done to save time, resources, and money. Avoid costly
implementations, dodge hiring requirements of trained staff for newly bought or
installed BIM software. Deliver consistent drawings standards throughout the building
project life cycle, increase bottom line and get your work within quick turnaround
schedules from experienced partners. These partners target minute details like the
walls, doors, and windows in a virtual 3D model to give you the closely simulated
model as reference.
7. Architects develop higher-quality designs by assimilating all data and inputs
gathered from all involved disciplines into a BIM. Accordingly, the BIM defines
geometric limits, statistics and points to geographical conflicts in the structure
design. With satellite integrated images, BIM can reduce and point to approximately
90% errors and omissions. Adhered to standards in each phase of the construction
the building needs to be crosschecked for work flows and uniformity by a
meticulous designer.
8. BIM helps not just in defining standards, it is often used to compliment the CAD
based work flows in developing nations. Its easier to visualize and improve
collaboration between on field and off field teams. This construction software is used
more to explore design options with some given inputs. Clearly, Construction
industry worldwide is steadily using advanced technology to make the world a much
more planned space.
9. BIM deliverable that architects spend time on during the project phases are
Model design
Model construction
Building operations
Model Optimization
10. Model design
There is dire need for accuracy in measurement of each corner within the
construction premises and inevitable design oriented uniformity at each level of the
building needs to be scrutinized. Structural work space in each compartment, ready
to fix components could be separated and identified during the design process.
11. Model construction
Not everything one sees in the design must be made on site. BIM designs
contractors realize that most of the parts could be developed off site. They can even
help give statistics for procurement and off-site manufacturing that can go side by
side with on-site work flows.
Architects and engineers who need to make their work much more organized- break
BIM plans between phases. Most of the recognized phases would be
Programming and pre design phase
Competitive Evaluation phase
Design Confirmation
Monitored Construction
12. Building operations
Every minute detail needs to be on record. BIM software does just that. It
simulates work hours per resource and work completion dates. Timelines entire
building construction management statistics and data would be simulated from the
software. For all BIM adopters, the usage and level of expertise using this software
has defined the return on investment (ROI) and business benefits that each architect
can deliver for the company.
13. Model Optimization
The users optimized experience is directly measured and displayed as business
benefits attributable to Building Information Modelling. From project life cycle
phases, to entire manufacturing and raw material usage the optimized suggestions
have mostly been in concurrence with the BIM modelling techniques.
14. From standard Lean methodology that relates to waste management in all material
management and knowledge visualizations; to finally delivering value in this project
construction helps builders and developers realize the ROI within each project.
Automated components/ scripts could be replaced within seconds in a BIM to avoid
rework. BIM experts using several smart methods like Modular construction
techniques can turn business plans into actualized completed projects within
stipulated timelines.
It is critical to successfully begin implementing BIM in its 3D construction phase
and then probably in time the conversations would soon move to the future
detailed 4D Building Information Modelling.
CONCLUSION
15. About us
Veetil Digital is a part of the highly diversified Veetil Group of companies. We are
a total digital services company covering all aspects of business. Our objective is to
make your life easier by taking care of all your digital needs that include 3D
visualisation solutions for your design and marketing requirements, software and
web based solutions for all your business processes thus making them more
efficient and effective.