The document outlines the process of building defects surveys which involves selecting a project, conducting a survey to identify defects and prepare a report, then using the report to develop a bill of quantities (BOQ) for repairs or renovations. The survey procedure includes determining the purpose, instructions, type of survey needed, equipment used, and steps to identify and document any defects found.
4. Survey
• Purpose of survey
• Survey instruction
• Type of survey
• Equipment for
survey
• Survey procedure
• Purpose of survey
• Requirement is to
• Building Report
• Equipment for
survey
• Survey procedure
Selected
Project
Editor's Notes
According to the client requirement
Give recommendation