ºÝºÝߣ

ºÝºÝߣShare a Scribd company logo
Personal Statement ×Ô¼º½B½é                                                                  Skills ¥¹¥­¥ë
An adept multi-tasker, who is able to combine the ability to lead and motivate with an        Project Management
enthusiastic, can-do approach. Comfortable working on large projects or numerous,
smaller size pieces of work, Sala is able to plan and think on his feet and has vast      ? Change management
experience of working on multi-cultural development, engineering, and IT projects.        ?    Motivating staff
Well organized and able to multi-task, he has a passionate desire to excel against
demanding expectations, and is more than willing to take charge of the end-to-end         ?    Infrastructure projects
delivery of the project life cycle. He is now looking to work for a company which
promotes recognition and rewards creativity, hard work & commitment.                      ?    IT projects
                                                                                          ?    Project planning
Employment History ššs                                                                     ?    Contract administration
                                                                          2007-2013
                                                                     Japan/Shizuoka           Professional
Misumi Group, Suruga Seiki(Europe Factory)
Director: Production, Engineering, and IT (Poland)                                        ? Identifying key issues
                                                                                          ? Leadership skills
Factory Top Management duties:
    ? designing and maintaining the layout of the plant                                   ? Estimating costs
    ? designing, developing and installing plant control systems                          ? Budgetary control
    ? supervising equipment and facility with 5S tools and forecasting production
    ? calculating production KPIs and its costs                                           ? Manufacturing control
    ? deciding on the effective use of resources, raw materials, equipment & staff        ? Warehouse control
    ? supervising the work of manufacturing engineers, operator and support staff
    ? investigating environmental hazards in production                                   ? Information gathering
    ? reviewing results and methods for improving the productivity rate                   ? Coaching staff
    ? investigating latest technology that could improve the productivity rate
    ? sourcing new suppliers of industrial equipment                                          Personal
    ? conducting safety tests and removing potential hazards                              ? Strategic thinking
    ? establishing and implementing a quality culture within the factory
    ? supervising 3 managers, 4 sub-leaders, 3 office staffs, and 20 operators            ?     IT skills
                                                                                          ?     Influencing skills
Project Management duties:
    ? Identifying and quantifying external risks affecting the project                    ?     Conflict resolution
    ? Drawing up detailed plans of how to achieve each stage of a project
                                                                                          ?     Problem solving
    ? Preparing status reports for use in communication to board members.
    ? Ensuring that each stage of the project is progressing to schedule                  ?     Analytical mind
    ? Maintaining accurate information to enable records of contract history
                                                                                          ?     High levels of integrity
    ? Communicating project direction to the Japan HQ, and suppliers
                                                                                          ?     Negotiating skills
                                                                          2005-2007
                                                                         Japan/Tokyo
Volkswagen Group Japan
                                                                                         Language ÑÔÕZ
Engineer Electronics Research
Germany HQ Car telematics and automobile infotainment task s:
                                                                                              ¡ñ Japanese Fluent
    ?    Developed & tested OEM car navigation system requirements with Simens                ¡ñ English Fluent
         VDO Japan                                                                            ¡ñ Spanish Native
    ?    Developed & tested After Market navigation system requirements with
         Clarion Japan
    ?    Developed Car Networking with KDDI Japan. Seamless Connection 3G,
         Wimax, and WiFi
    ?    Developed & tested of future concept navigation system requirements with
         Infosys Japan- Sharp
    ?    Supported all deliverables withing the VW HQ German project management
         process
    ?    Provided status report and prepare a cross functional and integrated project
         plan Responsible for identifying and resolving cross-functional issues that
         may impact critical projects
2000-2001 Scholarships ŠXѧ½ð
                                                                     Japan/Tokyo
Sony Corporation Core Technology & Networking in                                                        2003-2004
the Manufacturing System                                                            UFJ Bank, Kawashima
Internship                                                                          Scholarship
                                                                                                        2001-2003
Automatic Code Generation Software Research. Responsible to present an OOA          Itou Shaon Foundation
(Object Oriented Application) representing SONY in USA California                   Scholarship
                                                                                                        1999-2001
Academic Qualifications ѧšs                                                          AIE Honor Scholarship
                                                                       2011- 2014                        1995-1999
                                                                  Poland/Gdansk      Mombusho, Japanese
Gdansk University                                                                   Government Scholarship
Doctoral Studies in Economics. (Individual tutoring)                                                    1992-1994
PHD Research                                                                        Argentinean Government
                                                                      2001- 2003    Scholarship
                                                                   Japan/Niigata
Nagaoka University of Technology
Master in Mechanical System Engineering. (Full time)                              Areas of Expertise ŒŸéT·ÖÒ°
                                                                      1999- 2001
                                                                                     ? Project Initiation
                                                                   Japan/Niigata
Nagaoka University of Technology                                                     ? Financial awareness
Bachelors in Mechanical System Engineering. (Full time)
                                                                      1995- 1999     ? Risk management
                                                               Japan/Kagoshima       ? Innovation
Kagoshima National College of Technology
College Associate in Mechanical Engineering. (Full time)                             ? Managing Suppliers
                                                                                              ?   Stock Control
Project Management Experience ¥×¥í¥¸¥§¥¯¥È¥Þ¥Í¥¸¥á¥ó¥È¤Î½UòY                                                 ?   Supervising staff
  As part of growth strategy for Misumi Group, negotiated and participated actively in        ?   KPI methodology
the NPI (New Product Introduction) investment for Factory Automation product
lines. Subsequently directed hiring and training integration of new personal. Ensuring        ?   Coordinating resources
the adoption of best-practice project management tools, processes and techniques.             ?   Project implementation
Full responsibility for Aluminum Frame Line, from project concept to SOP (Start of
Production).
                                                                                         Other ¤½¤ÎËû
  For Musumi Group Suruga Polska, directed implementation of factory corporate-
wide management resources system to provide accurate and timely work
                                                                                          IBM Catia V5 certification
performance reports. Improve payroll and accountancy invoice controls. Reduce size
                                                                                           (Japan)
of Accountancy, Production Control, Engineering and IT staffs.

    Completed 30% reduction of NRM (nom rotating material) in all factory                 ¡ñ   Basic & part Design
warehouses. Implemented ITO (Inventory Turn Over KPI) control and achieved 3.2            ¡ñ   Assembly Design
ratio while importing raw material from Korea & Japan to Europe. Also renegotiated        ¡ñ   Assembly Design
machine tool stock to secure significantly enhanced delivery and payments terms.          ¡ñ   Surface & Generative Design
                                                                                          ¡ñ   Generative Drafting
   Redesigned operational and financial procedures that: 1) significantly reduced
irregular purchase order process time; 2) provided accurate and reliable                  European Driving License
costing/profitability information (thereby permitting more aggressive negotiations
with suppliers and client); 3) improved receiving and physical inventory
procedures;4) enhanced internal controls throughout the organization by deployment
of ERP system.

More Related Content

Japanese Project Manager

  • 1. Personal Statement ×Ô¼º½B½é Skills ¥¹¥­¥ë An adept multi-tasker, who is able to combine the ability to lead and motivate with an Project Management enthusiastic, can-do approach. Comfortable working on large projects or numerous, smaller size pieces of work, Sala is able to plan and think on his feet and has vast ? Change management experience of working on multi-cultural development, engineering, and IT projects. ? Motivating staff Well organized and able to multi-task, he has a passionate desire to excel against demanding expectations, and is more than willing to take charge of the end-to-end ? Infrastructure projects delivery of the project life cycle. He is now looking to work for a company which promotes recognition and rewards creativity, hard work & commitment. ? IT projects ? Project planning Employment History ššs ? Contract administration 2007-2013 Japan/Shizuoka Professional Misumi Group, Suruga Seiki(Europe Factory) Director: Production, Engineering, and IT (Poland) ? Identifying key issues ? Leadership skills Factory Top Management duties: ? designing and maintaining the layout of the plant ? Estimating costs ? designing, developing and installing plant control systems ? Budgetary control ? supervising equipment and facility with 5S tools and forecasting production ? calculating production KPIs and its costs ? Manufacturing control ? deciding on the effective use of resources, raw materials, equipment & staff ? Warehouse control ? supervising the work of manufacturing engineers, operator and support staff ? investigating environmental hazards in production ? Information gathering ? reviewing results and methods for improving the productivity rate ? Coaching staff ? investigating latest technology that could improve the productivity rate ? sourcing new suppliers of industrial equipment Personal ? conducting safety tests and removing potential hazards ? Strategic thinking ? establishing and implementing a quality culture within the factory ? supervising 3 managers, 4 sub-leaders, 3 office staffs, and 20 operators ? IT skills ? Influencing skills Project Management duties: ? Identifying and quantifying external risks affecting the project ? Conflict resolution ? Drawing up detailed plans of how to achieve each stage of a project ? Problem solving ? Preparing status reports for use in communication to board members. ? Ensuring that each stage of the project is progressing to schedule ? Analytical mind ? Maintaining accurate information to enable records of contract history ? High levels of integrity ? Communicating project direction to the Japan HQ, and suppliers ? Negotiating skills 2005-2007 Japan/Tokyo Volkswagen Group Japan Language ÑÔÕZ Engineer Electronics Research Germany HQ Car telematics and automobile infotainment task s: ¡ñ Japanese Fluent ? Developed & tested OEM car navigation system requirements with Simens ¡ñ English Fluent VDO Japan ¡ñ Spanish Native ? Developed & tested After Market navigation system requirements with Clarion Japan ? Developed Car Networking with KDDI Japan. Seamless Connection 3G, Wimax, and WiFi ? Developed & tested of future concept navigation system requirements with Infosys Japan- Sharp ? Supported all deliverables withing the VW HQ German project management process ? Provided status report and prepare a cross functional and integrated project plan Responsible for identifying and resolving cross-functional issues that may impact critical projects
  • 2. 2000-2001 Scholarships ŠXѧ½ð Japan/Tokyo Sony Corporation Core Technology & Networking in 2003-2004 the Manufacturing System UFJ Bank, Kawashima Internship Scholarship 2001-2003 Automatic Code Generation Software Research. Responsible to present an OOA Itou Shaon Foundation (Object Oriented Application) representing SONY in USA California Scholarship 1999-2001 Academic Qualifications ѧšs AIE Honor Scholarship 2011- 2014 1995-1999 Poland/Gdansk Mombusho, Japanese Gdansk University Government Scholarship Doctoral Studies in Economics. (Individual tutoring) 1992-1994 PHD Research Argentinean Government 2001- 2003 Scholarship Japan/Niigata Nagaoka University of Technology Master in Mechanical System Engineering. (Full time) Areas of Expertise ŒŸéT·ÖÒ° 1999- 2001 ? Project Initiation Japan/Niigata Nagaoka University of Technology ? Financial awareness Bachelors in Mechanical System Engineering. (Full time) 1995- 1999 ? Risk management Japan/Kagoshima ? Innovation Kagoshima National College of Technology College Associate in Mechanical Engineering. (Full time) ? Managing Suppliers ? Stock Control Project Management Experience ¥×¥í¥¸¥§¥¯¥È¥Þ¥Í¥¸¥á¥ó¥È¤Î½UòY ? Supervising staff As part of growth strategy for Misumi Group, negotiated and participated actively in ? KPI methodology the NPI (New Product Introduction) investment for Factory Automation product lines. Subsequently directed hiring and training integration of new personal. Ensuring ? Coordinating resources the adoption of best-practice project management tools, processes and techniques. ? Project implementation Full responsibility for Aluminum Frame Line, from project concept to SOP (Start of Production). Other ¤½¤ÎËû For Musumi Group Suruga Polska, directed implementation of factory corporate- wide management resources system to provide accurate and timely work IBM Catia V5 certification performance reports. Improve payroll and accountancy invoice controls. Reduce size (Japan) of Accountancy, Production Control, Engineering and IT staffs. Completed 30% reduction of NRM (nom rotating material) in all factory ¡ñ Basic & part Design warehouses. Implemented ITO (Inventory Turn Over KPI) control and achieved 3.2 ¡ñ Assembly Design ratio while importing raw material from Korea & Japan to Europe. Also renegotiated ¡ñ Assembly Design machine tool stock to secure significantly enhanced delivery and payments terms. ¡ñ Surface & Generative Design ¡ñ Generative Drafting Redesigned operational and financial procedures that: 1) significantly reduced irregular purchase order process time; 2) provided accurate and reliable European Driving License costing/profitability information (thereby permitting more aggressive negotiations with suppliers and client); 3) improved receiving and physical inventory procedures;4) enhanced internal controls throughout the organization by deployment of ERP system.