This document outlines the qualifications and experience of Jim Moody. He has two B.S. degrees in Industrial Technology and Industrial Engineering and is a certified Lean Master, Six Sigma Black Belt, and Master Quality Management specialist. Moody has extensive experience implementing Lean and Six Sigma processes to reduce costs and improve efficiency through process redesign, waste elimination, and reducing cycle times and variability. He has managed projects that saved companies over $8 million and aims to transfer his expertise to continuously improve his next employer's operations.
1 of 13
Download to read offline
More Related Content
Jim moody presentation 10 2012
1. Jim Moody
Industrial Manufacturing Engineer
Certified Lean Master
Certified Six Si
C ifi d Si Sigma Master Black Belt
l k l
Certified Six Sigma Black Belt
Certified Lean Manufacturing Specialist
Certified Master Quality Management
2. Education
Two B.S. degrees
B.S. Industrial Technology
B.S. Industrial Engineering
Jim Moody
3. Additional Training
T aining
Seminars and classes in:
Computer Programming
AutoCAD
Facility and Space Planning
Project Management
Lean
Six Sigma
Deming & Juran on Quality
Toyota Production System (TPS)
CNC - Fanuc
Jim Moody
4. Certificates
Lean Master
Lean Manufacturing Specialist
Six Sigma Master Black Belt
Six Sigma Black Belt
Six Sigma Green Belt
Master of Science Quality Management
Q y g
Jim Moody
10. Accomplishments
Redesigned process (Pick & Pass to
Cluster Pick)
Increased output from 3 cartons a minute to
35
Saved company in excess of $8,000,000 in 9
months
Redesigned shaft cutting operation
Reduced machining time from 30 minutes to 6
sa g est ated
saving estimated $90,000 annually CPK 1.29
a ua y C 9
3.86 Sigma (7-24-2011)
(7-24-
Jim Moody
11. Accomplishments (cont.)
(cont )
Designed parts needed for a factory
conversion
Saved company $125,000 on this project
Planned and managed project to reduce
non-
non-productive time and save HEPA filter
cost.
$70,000 project
Payback 58 days
Jim Moody
12. Accomplishments (cont.)
(cont )
Designed new motor component
Estimated reduction in assembly process cycle
time of 12.9%
Reduces maintenance and potential safety
p y
hazards
Registered Patent # 7,804,212
g , ,
Estimated annual savings of $15,000.
Jim Moody
13. Expected accomplishments at my
p p y
next position
Reduce Cycle Times
Eliminate Waste (Lean)
Increase Output
Reduce Variability (Six Sigma)
R d V i bilit (Si Si )
Train Others to Think Lean
Build Teamwork
Manage Projects
Jim Moody