I _ Project Overview
II _ Risk Analysis and Experience
III _ Prospect
This material contains forward-looking statements that include our current beliefs and expectations on market factors and
information obtained outside GS E&C, which are subject to uncertainties. Due to the volatility of these factors, actual
results may differ from those set forth in the presented statements. Information found here should not be solely relied
upon for making any investment decision, this material is provided as a reference purpose only for the investors. GS E&C
shall not be responsible for any trading or investment decisions made based on this information.
III _ Prospect
Appendix
Overseas Projects
Location Kuwait, Burgan Fields
Sponsor Kuwait Oil Company (KOC)
Finance Client Own Fund
GS E&C awarded notification of award KWD 1.5 billion pressure maintenance project
sponsored by Kuwait Oil Company. This project is located at Burgan fields.
1. Project Overview
Overview Location
1/3
Facilities
Enhanced Oil Recovery (EOR)
-Effluent Water Disposal Plant
-Wara Pressure Maintenance Project
: 667,000 Barrel of Water Per Day
Contract
Type
Lump Sump T/K
Period 36 Months
Amount KWD 1.5 Billion (USD 550 Million)
 Previous experience on the executed projects
in Kuwait.
 Reliable client (State-running company)
 Advanced payment(10%) and monthly
Progress Payment
 Cost escalation
 Forward deal contracts for hedging F/X risk
2. Risk Analysis and Experience
GS E&C will hedge expected risks, and will successfully execute this project with the
experience of water distribution scheme projects.
Introduction
Payment
Capability
Raw
Material &
2/3
 Preparing for contingency cost
 Forward deal contracts for hedging F/X risk
Projects in KuwaitProjects in Kuwait
KNPC GOD
Project
Contract
Type
Period
2000-2001
LSTK
LSTK
OCR Revamp of ARDS Unit 2002-2004
LSTKLPG Tank 2011-2013
Arabian Peninsula
2.6 Million (2009)
Kuwait
Arabic
Islam 85%
17,818 km2
USD 31,482 (2009)
Location
Population
Capital
Language
Religion
Area
GDP
Others
Material &
F/X Risk
 Kuwait Wara pressure maintenance project is KWD 1.5
billion construction which is sponsored by KOC (Kuwait Oil
Company). This project is located in the Burgan fields of
Kuwait. GS E&C executes the whole process of engineering,
procurement and construction over 36 months. This project
will contribute to increase annual sales revenues by 200
billion won.
3. Prospect
3/3
<貎危, OCR Revamp of ARDS Unit >
 GS E&C develops new business area such as coal
gasification and fertilizer field, EOR facilities (Enhanced Oil
Recovery) and so on.
 With the success of completing OCR Revamping, Gas Oil
Desulfurization and awarding new LPG Tank from KNPC,
GS E&C proves that it is internationally recognized as
having edge in Oil and Gas business in Middle East. Re-
entering new markets such as Kuwait UAE Saudi Arabia, GS
E&C diversifies its operation geographically and diminishes
regional risks.
Project Client Project Type
Project
PeriodDescription
Contract
Amount
Unit: USD
Collie UreaAustralia
Bahrain Petroleum Company
2.88 bnUrea 2011  2015
C925/C937Singapore LTA SGD 460 milCivil 2011  2016
IPC EVASaudi Arabia
International Polymers
Company 385 milEVA 2011  2013
ASPC/ABPC*
Inter Refinery PipelineUAE Takreer 623 milPipeline 2010  2014
2010  2013Barka 3 & Sohar 2Oman 630 milPower Plant
Waste Water TreatmentBahrain 70 milWater Treatment 2010  2012
Perdaman Chemicals and
Fertilizers
LPG TankKuwait Kuwait National Petroleum Co. KD 154 milLPG 2011  2013
Overseas Projects
2011 Award
Harvest Energy
ERC HydrocrakerEgypt ERC 2.17 bnHydrocracker 2007  2014
IRPC Propylene IRPC Public Co, Ltd. 80 milPropylene 2010  2012
Depot C911Singapore LTA 144 milCivil 2009  2015
2010  2012Oil sandCanada CAD 310 milOil sand
Ruwais 4th NGL TrainUAE GASCO 1.2 bnGas 2009  2013
C913Singapore LTA 310 milCivil 2009  2015
SNDCOman
Petroleum Development
Oman
220 milGas 2009  2013
Ruwais Refinery Pkg7UAE Takreer 524 milCivil 2009  2014
Ruwais Refinery Pkg2UAE Takreer 3.11 bnRFCC 2009  2014
ASPC/ABPC* 2010  2013Barka 3 & Sohar 2Oman 630 milPower Plant
*ASPC : Al Suwadi Power Company SAOC / ABPC : Al Batinah Power Company SAOC
Thailand
Under
construction

More Related Content

Kuwait Wara.ENG

  • 1. GS E&C, KD 1.5 Billion Overseas Project NOA Received Kuwait Wara Pressure Maintenance Project August, 2011August, 2011
  • 2. CONTENTSCONTENTS I _ Project Overview II _ Risk Analysis and Experience III _ Prospect This material contains forward-looking statements that include our current beliefs and expectations on market factors and information obtained outside GS E&C, which are subject to uncertainties. Due to the volatility of these factors, actual results may differ from those set forth in the presented statements. Information found here should not be solely relied upon for making any investment decision, this material is provided as a reference purpose only for the investors. GS E&C shall not be responsible for any trading or investment decisions made based on this information. III _ Prospect Appendix Overseas Projects
  • 3. Location Kuwait, Burgan Fields Sponsor Kuwait Oil Company (KOC) Finance Client Own Fund GS E&C awarded notification of award KWD 1.5 billion pressure maintenance project sponsored by Kuwait Oil Company. This project is located at Burgan fields. 1. Project Overview Overview Location 1/3 Facilities Enhanced Oil Recovery (EOR) -Effluent Water Disposal Plant -Wara Pressure Maintenance Project : 667,000 Barrel of Water Per Day Contract Type Lump Sump T/K Period 36 Months Amount KWD 1.5 Billion (USD 550 Million)
  • 4. Previous experience on the executed projects in Kuwait. Reliable client (State-running company) Advanced payment(10%) and monthly Progress Payment Cost escalation Forward deal contracts for hedging F/X risk 2. Risk Analysis and Experience GS E&C will hedge expected risks, and will successfully execute this project with the experience of water distribution scheme projects. Introduction Payment Capability Raw Material & 2/3 Preparing for contingency cost Forward deal contracts for hedging F/X risk Projects in KuwaitProjects in Kuwait KNPC GOD Project Contract Type Period 2000-2001 LSTK LSTK OCR Revamp of ARDS Unit 2002-2004 LSTKLPG Tank 2011-2013 Arabian Peninsula 2.6 Million (2009) Kuwait Arabic Islam 85% 17,818 km2 USD 31,482 (2009) Location Population Capital Language Religion Area GDP Others Material & F/X Risk
  • 5. Kuwait Wara pressure maintenance project is KWD 1.5 billion construction which is sponsored by KOC (Kuwait Oil Company). This project is located in the Burgan fields of Kuwait. GS E&C executes the whole process of engineering, procurement and construction over 36 months. This project will contribute to increase annual sales revenues by 200 billion won. 3. Prospect 3/3 <貎危, OCR Revamp of ARDS Unit > GS E&C develops new business area such as coal gasification and fertilizer field, EOR facilities (Enhanced Oil Recovery) and so on. With the success of completing OCR Revamping, Gas Oil Desulfurization and awarding new LPG Tank from KNPC, GS E&C proves that it is internationally recognized as having edge in Oil and Gas business in Middle East. Re- entering new markets such as Kuwait UAE Saudi Arabia, GS E&C diversifies its operation geographically and diminishes regional risks.
  • 6. Project Client Project Type Project PeriodDescription Contract Amount Unit: USD Collie UreaAustralia Bahrain Petroleum Company 2.88 bnUrea 2011 2015 C925/C937Singapore LTA SGD 460 milCivil 2011 2016 IPC EVASaudi Arabia International Polymers Company 385 milEVA 2011 2013 ASPC/ABPC* Inter Refinery PipelineUAE Takreer 623 milPipeline 2010 2014 2010 2013Barka 3 & Sohar 2Oman 630 milPower Plant Waste Water TreatmentBahrain 70 milWater Treatment 2010 2012 Perdaman Chemicals and Fertilizers LPG TankKuwait Kuwait National Petroleum Co. KD 154 milLPG 2011 2013 Overseas Projects 2011 Award Harvest Energy ERC HydrocrakerEgypt ERC 2.17 bnHydrocracker 2007 2014 IRPC Propylene IRPC Public Co, Ltd. 80 milPropylene 2010 2012 Depot C911Singapore LTA 144 milCivil 2009 2015 2010 2012Oil sandCanada CAD 310 milOil sand Ruwais 4th NGL TrainUAE GASCO 1.2 bnGas 2009 2013 C913Singapore LTA 310 milCivil 2009 2015 SNDCOman Petroleum Development Oman 220 milGas 2009 2013 Ruwais Refinery Pkg7UAE Takreer 524 milCivil 2009 2014 Ruwais Refinery Pkg2UAE Takreer 3.11 bnRFCC 2009 2014 ASPC/ABPC* 2010 2013Barka 3 & Sohar 2Oman 630 milPower Plant *ASPC : Al Suwadi Power Company SAOC / ABPC : Al Batinah Power Company SAOC Thailand Under construction