Kvaerner is a leading jacket fabricator in Europe with over 40 years of experience. The document discusses several offshore oil and gas platforms Kvaerner has constructed, including the Oseberg B platform which was their first engineering, procurement, and construction (EPC) contract delivered in 1987, weighing 18,800 tons and 122 meters tall. More recent projects discussed are the Buzzard platform delivered to Nexen UK in 2005 and the Clair Ridge platform delivered to BP UK in 2013.
2. A track record spanning 40 years
Here are some examples
息 Kvaerner 2012
3. Oseberg B
This was the first EPC jacket delivered by
Kvaerner. The EPC contract was ordered
in 1985 and delivered to Norsk Hydro in
1987.
Key data:
Weight of Jacket: 18 800 tonnes
Weight of piles: 6 500 tonnes
Height: 122 metres
息 Kvaerner 2012
4. Kvitebj淡rn
This is an integrated drilling and
processing platform installed at a water
depth of 190 meters.
Key data:
Weight of Jacket: 12 200 tonnes
Weight of piles: 5 200 tonnes
Height: 215 metres
息 Kvaerner 2012
5. Grane
Grane is an integrated accommodation,
process and drilling platform. It was the
third jacket delivered to Norsk Hydro.
Key data:
Weight of Jacket: 17 650 tonnes
Weight of piles: 3 900 tonnes
Height: 150 metres
息 Kvaerner 2012
6. Buzzard
The three Buzzard jackets were delivered
to Nexen UK in 2005. In addition, two
bridges and a flare were delivered in 2006.
Key data (production jacket):
Weight of Jacket: 5 600 tonnes
Weight of piles: 3 600 tonnes
Height: 121 metres
息 Kvaerner 2012
7. Clair Ridge
The EPC contract for two jackets was
ordered in 2010 with delivery to BP UK
in 2013.
Key data (production jacket):
Weight of Jacket: 9 200 tonnes
Weight of piles: 6 500 tonnes
Height: 168 metres