Library of Birmingham
Cost/budget
Due to budget cuts by the
council;
? Staff has been halved at
Birmingham centre Library.
? Opening times have been
halved.
? Budget cuts have been
expected to cut even more
as the years go on due to
the overpriced cost of the
building.
? Plans also include cutting
6000 jobs
Planning Process and time
The original time planned to
build Birmingham Central Library
took longer than expected
? Construction started on 7
January 2010 and was
completed in April 2013 (3
years) it cost a total of 189
million pounds.
? In the planning stage, the
resources cost more than first
expected nearly two times as
much.
? On the first of April 2015,
opening hours are planned to
change again.
Weather and legal issues
? Due to weather conditions and
planning process, the construction
took longer than first expected
three times longer.
? Due to legal issues such as noise
population, methods have been
planned out to reduce or cut theses'
problems, has a result the construction
was delayed for a short period.
Design and layout
3D immersive model
Architect's original image
2D plans in the 3D world
The Library of Birmingham was a ?189m project to build an iconic new Central Library
for Birmingham.
The Three phase approach to the build:
Phase 1: Virtual construction of the steel and concrete of the new
Library
Phase 2: Finishes, fixtures and fittings, including flooring and lighting
Phase 3: Creation of the consultation tools and systems
Case Study
People have argued that the old building only
needed minor improvement so therefore the
new building was not needed
Birmingham Central Library Library of BirminghamVS

More Related Content

Library of Birmingham

  • 2. Cost/budget Due to budget cuts by the council; ? Staff has been halved at Birmingham centre Library. ? Opening times have been halved. ? Budget cuts have been expected to cut even more as the years go on due to the overpriced cost of the building. ? Plans also include cutting 6000 jobs
  • 3. Planning Process and time The original time planned to build Birmingham Central Library took longer than expected ? Construction started on 7 January 2010 and was completed in April 2013 (3 years) it cost a total of 189 million pounds. ? In the planning stage, the resources cost more than first expected nearly two times as much. ? On the first of April 2015, opening hours are planned to change again.
  • 4. Weather and legal issues ? Due to weather conditions and planning process, the construction took longer than first expected three times longer. ? Due to legal issues such as noise population, methods have been planned out to reduce or cut theses' problems, has a result the construction was delayed for a short period.
  • 5. Design and layout 3D immersive model Architect's original image 2D plans in the 3D world The Library of Birmingham was a ?189m project to build an iconic new Central Library for Birmingham. The Three phase approach to the build: Phase 1: Virtual construction of the steel and concrete of the new Library Phase 2: Finishes, fixtures and fittings, including flooring and lighting Phase 3: Creation of the consultation tools and systems
  • 6. Case Study People have argued that the old building only needed minor improvement so therefore the new building was not needed Birmingham Central Library Library of BirminghamVS