JOYDEBPUR - MYMENSINGH
ROAD IMPROVEMENT
PROJECT (JMRIP)
Sponsor Ministry Ministry of Road Transport and Bridges
Leading Agency Roads and Highways Division
Executing Agency Bangladesh Army,
Special Works Organization (SWO)-West
Project Length 30.250 km
Project Cost (WI 1 & 2) 742.15 Cr (TK) GOB (Excluding 10% Physical
and Price Adjustment)
Project Duration January 2013 to June 2015
2nd RDPPApproved 31 October 2013
16 ECB Deployed 11 December 2012
17 ECB Taken over 06 April 2014
SALIENT ASPECTS OF JMRIP
 Length 30.25 km out of 87.18 km by ECB.
 4 lane road with 1-9 m median
 1 x flyover at Maona of 900 m
 1 x rail over bridge at Salna
 1 x foot over bridge at Bangabandhu Agriculture
University (BAU)
 55 x box culverts
SALIENT ASPECTS OF JMRIP
WI-2 : Rajendrapur to Maona (4
lane)
 No. Of fly over : 1
 No. Of box culvert : 23
WI-1: Joydevpur to Rajendrapur
(4 lane)
 Initial 1.55 km 6 lane. Rest 11.10
km 4 lane
 No. Of rail over bridge (ROB) : 1
 No. Of box culvert : 32
 No of foot over bridge : 1
DESCRIPTION OF THE PROJECT
ROAD CROSS SECTION
Carriage
Way
Hard
Shoulder
Carriage
Way
Soft
Shoulder
1000
2000
7300
1000/
9000
7300
2000
1000
Median
Wearing Course (40
mm)
Binder Course (130
mm)
150mm Aggregate Base
T-1
250mm Aggregate Base
T-2400 mm Sub Base 300 mm ISG
30% sand,
70% brick
98% Compaction
100% sand,
98% Compaction
20% sand,
80% stone
98% Compaction
20% sand,
80% brick
98% Compaction
Rigid
Pavement
Salient Features-
 Used as an alternative to traditional
roadway.
 Unlike traditional roads, it doesn't have
any base type-1 or asphalt inside it.
 Has higher longevity than traditional
bituminous roads.
 Comparatively more expensive.
 Resistant to wet weather and damp
conditions.
 Can be used to accommodate vehicle
parking when road is not in use.
Technical specification-
 Total depth is 320mm.
 Constructed entirely out of concrete.
 Corrosion resistant surface behavior.
Road Markings
Traffic Condition
EARLIER
PRESENT
SCOUR PROTECTION &
MAINTENANACE OF MEGHNA
BRIDGE
 Length of bridge=
920m
 Width of bridge=
9.1m
 Number of pier=
12
 Number of lane=
2
RIVER BED SCOUR PROTECTION
Hydrological survey of February 2015
Scouring formed
downstream of pier-6
RIVER BED SCOUR PROTECTION
Jute bag
(90kg capacity)
Geotextile bag
(180 kg capacity)
Bridge
maintenance
 Overloaded vehicles
above the design limit
plied on the bridge.
 Abnormal sound &
vibration were noticed
during passage of
heavy vehicles.
linkedin

More Related Content

Viewers also liked (17)

Rajasthan Tour Package
Rajasthan Tour PackageRajasthan Tour Package
Rajasthan Tour Package
Royal India Travel
Claudio Gagliardini - Social Media: marketing o relazioni
Claudio Gagliardini - Social Media: marketing o relazioniClaudio Gagliardini - Social Media: marketing o relazioni
Claudio Gagliardini - Social Media: marketing o relazioni
Elena Minchenok
Selenium
SeleniumSelenium
Selenium
Abror Khoerun Nizam
Tabla Salarial-Construcci坦n civil- PeruTabla Salarial-Construcci坦n civil- Peru
Tabla Salarial-Construcci坦n civil- Peru
JOHNNY JARA RAMOS
Sandra Fratticci - articoli Culturalazio
Sandra Fratticci - articoli CulturalazioSandra Fratticci - articoli Culturalazio
Sandra Fratticci - articoli Culturalazio
Sandra Fratticci
Cruz Resume
Cruz ResumeCruz Resume
Cruz Resume
Jorge Cruz
Hilton.Exergaming to improve physical and mental fitness in ASD.2015
Hilton.Exergaming to improve physical and mental fitness in ASD.2015Hilton.Exergaming to improve physical and mental fitness in ASD.2015
Hilton.Exergaming to improve physical and mental fitness in ASD.2015
Claudia Hilton
IN-salary-guide-2015
IN-salary-guide-2015IN-salary-guide-2015
IN-salary-guide-2015
Abhisek Gupta
Jezriah J Krubeck Vitae copy
Jezriah J Krubeck Vitae copyJezriah J Krubeck Vitae copy
Jezriah J Krubeck Vitae copy
Jez Krubeck
多Te vas a comer esa galleta?多Te vas a comer esa galleta?
多Te vas a comer esa galleta?
Toni Escamilla Pardo
PRCS Construction
PRCS ConstructionPRCS Construction
PRCS Construction
James Shelton
Dise単o de mezcla de ConcretoDise単o de mezcla de Concreto
Dise単o de mezcla de Concreto
JOHNNY JARA RAMOS
La Web 2.0La Web 2.0
La Web 2.0
IsaPovedaM
1MyResume1
1MyResume11MyResume1
1MyResume1
Felicia Alvarado
Pressure
PressurePressure
Pressure
Conferat Conferat
Akula Sai Kumar
Akula Sai KumarAkula Sai Kumar
Akula Sai Kumar
Sai Akula
DropboxDropbox
Dropbox
Nataliajime25
Claudio Gagliardini - Social Media: marketing o relazioni
Claudio Gagliardini - Social Media: marketing o relazioniClaudio Gagliardini - Social Media: marketing o relazioni
Claudio Gagliardini - Social Media: marketing o relazioni
Elena Minchenok
Tabla Salarial-Construcci坦n civil- PeruTabla Salarial-Construcci坦n civil- Peru
Tabla Salarial-Construcci坦n civil- Peru
JOHNNY JARA RAMOS
Sandra Fratticci - articoli Culturalazio
Sandra Fratticci - articoli CulturalazioSandra Fratticci - articoli Culturalazio
Sandra Fratticci - articoli Culturalazio
Sandra Fratticci
Cruz Resume
Cruz ResumeCruz Resume
Cruz Resume
Jorge Cruz
Hilton.Exergaming to improve physical and mental fitness in ASD.2015
Hilton.Exergaming to improve physical and mental fitness in ASD.2015Hilton.Exergaming to improve physical and mental fitness in ASD.2015
Hilton.Exergaming to improve physical and mental fitness in ASD.2015
Claudia Hilton
IN-salary-guide-2015
IN-salary-guide-2015IN-salary-guide-2015
IN-salary-guide-2015
Abhisek Gupta
Jezriah J Krubeck Vitae copy
Jezriah J Krubeck Vitae copyJezriah J Krubeck Vitae copy
Jezriah J Krubeck Vitae copy
Jez Krubeck
多Te vas a comer esa galleta?多Te vas a comer esa galleta?
多Te vas a comer esa galleta?
Toni Escamilla Pardo
PRCS Construction
PRCS ConstructionPRCS Construction
PRCS Construction
James Shelton
Dise単o de mezcla de ConcretoDise単o de mezcla de Concreto
Dise単o de mezcla de Concreto
JOHNNY JARA RAMOS
La Web 2.0La Web 2.0
La Web 2.0
IsaPovedaM
Akula Sai Kumar
Akula Sai KumarAkula Sai Kumar
Akula Sai Kumar
Sai Akula
DropboxDropbox
Dropbox
Nataliajime25

Similar to linkedin (20)

428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
RAKESHPANDEY754083
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
ATUL SHUKLA
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
DanielWisman1
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
Engr S M Muzahid Monir, CSCM, MBA, MSDM.
SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUES
R821992
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
Mayur Soni
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elements
subbu lakshmi
Road construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentationRoad construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentation
mahesh515545
Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine
Roshan Sharma
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
Saurabh601
Six week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNSix week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUN
Tarun2222
RoadstaB : Road Stabilization
RoadstaB : Road Stabilization RoadstaB : Road Stabilization
RoadstaB : Road Stabilization
Nikhil Sharma
Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1
ShantanuYelane
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
Bimenpreet Kaur
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
MohamedShehlanShafee1
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
hari priya somishetty
Highway construction and equipments
Highway construction and equipmentsHighway construction and equipments
Highway construction and equipments
Poornima Institute of Engineering and Technology, Jaipur
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
Sanjeev Dyamannavar
Padma multipurpose bridge
Padma multipurpose bridgePadma multipurpose bridge
Padma multipurpose bridge
KaiyumHossain3
ajju final project
ajju final projectajju final project
ajju final project
AJITESH GUPTA
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
RAKESHPANDEY754083
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
ATUL SHUKLA
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
DanielWisman1
SUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUESSUSTAINABLE CONSTRUCTION TECHNIQUES
SUSTAINABLE CONSTRUCTION TECHNIQUES
R821992
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
Mayur Soni
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elements
subbu lakshmi
Road construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentationRoad construction ppt for college rajkiya presentation
Road construction ppt for college rajkiya presentation
mahesh515545
Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine Precast Wings segment casting NHAI Spine
Precast Wings segment casting NHAI Spine
Roshan Sharma
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
Saurabh601
Six week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUNSix week industrial training presentation BY GUPTA TARUN
Six week industrial training presentation BY GUPTA TARUN
Tarun2222
RoadstaB : Road Stabilization
RoadstaB : Road Stabilization RoadstaB : Road Stabilization
RoadstaB : Road Stabilization
Nikhil Sharma
Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1Study of Samruddhi Mahamarg For Package 1
Study of Samruddhi Mahamarg For Package 1
ShantanuYelane
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
Bimenpreet Kaur
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
Sanjeev Dyamannavar
Padma multipurpose bridge
Padma multipurpose bridgePadma multipurpose bridge
Padma multipurpose bridge
KaiyumHossain3
ajju final project
ajju final projectajju final project
ajju final project
AJITESH GUPTA

linkedin

  • 1. JOYDEBPUR - MYMENSINGH ROAD IMPROVEMENT PROJECT (JMRIP)
  • 2. Sponsor Ministry Ministry of Road Transport and Bridges Leading Agency Roads and Highways Division Executing Agency Bangladesh Army, Special Works Organization (SWO)-West Project Length 30.250 km Project Cost (WI 1 & 2) 742.15 Cr (TK) GOB (Excluding 10% Physical and Price Adjustment) Project Duration January 2013 to June 2015 2nd RDPPApproved 31 October 2013 16 ECB Deployed 11 December 2012 17 ECB Taken over 06 April 2014 SALIENT ASPECTS OF JMRIP
  • 3. Length 30.25 km out of 87.18 km by ECB. 4 lane road with 1-9 m median 1 x flyover at Maona of 900 m 1 x rail over bridge at Salna 1 x foot over bridge at Bangabandhu Agriculture University (BAU) 55 x box culverts SALIENT ASPECTS OF JMRIP
  • 4. WI-2 : Rajendrapur to Maona (4 lane) No. Of fly over : 1 No. Of box culvert : 23 WI-1: Joydevpur to Rajendrapur (4 lane) Initial 1.55 km 6 lane. Rest 11.10 km 4 lane No. Of rail over bridge (ROB) : 1 No. Of box culvert : 32 No of foot over bridge : 1 DESCRIPTION OF THE PROJECT
  • 5. ROAD CROSS SECTION Carriage Way Hard Shoulder Carriage Way Soft Shoulder 1000 2000 7300 1000/ 9000 7300 2000 1000 Median Wearing Course (40 mm) Binder Course (130 mm) 150mm Aggregate Base T-1 250mm Aggregate Base T-2400 mm Sub Base 300 mm ISG 30% sand, 70% brick 98% Compaction 100% sand, 98% Compaction 20% sand, 80% stone 98% Compaction 20% sand, 80% brick 98% Compaction
  • 6. Rigid Pavement Salient Features- Used as an alternative to traditional roadway. Unlike traditional roads, it doesn't have any base type-1 or asphalt inside it. Has higher longevity than traditional bituminous roads. Comparatively more expensive. Resistant to wet weather and damp conditions. Can be used to accommodate vehicle parking when road is not in use. Technical specification- Total depth is 320mm. Constructed entirely out of concrete. Corrosion resistant surface behavior.
  • 10. Length of bridge= 920m Width of bridge= 9.1m Number of pier= 12 Number of lane= 2
  • 11. RIVER BED SCOUR PROTECTION Hydrological survey of February 2015 Scouring formed downstream of pier-6
  • 12. RIVER BED SCOUR PROTECTION Jute bag (90kg capacity) Geotextile bag (180 kg capacity)
  • 13. Bridge maintenance Overloaded vehicles above the design limit plied on the bridge. Abnormal sound & vibration were noticed during passage of heavy vehicles.